Laserfiche WebLink
ON•CALL ENGINEERING SERVICES V11 <br />Wales flesoureae-pullmi� �'� <br />copy will be submitted to the City for review, We envision the construction drawings will include <br />the following: <br />• General Sheets (Title Sheet and General Notes Sheet) <br />» Horizontal Control Plan <br />• ExfstngWell Site Plan and Existing Well Mechanical Plan and Section (2 sheets) <br />• Existing Well Detail and Well Rehabilitation Plan <br />• Well Yard Piping Plan and Profiles_ (2 sheets) <br />Well Discharge Pipeline Plan and Profile (2 ;sheets @ 44 scale) <br />Well. Sewer Pipeline Plan and Profile (1 sheet 0 40 scale) <br />• Trench and Paving Details, Piping and Miscellaneous Details (2 sheets) <br />• Connection Details (discharge piping and sewer) <br />• Well Electrical Site Plan and Wail Electrical Modifioations (2 sheets) <br />The following are additional construction drawings for Optional Work: <br />Modlfic do t Well Flushing Ploing (OPTIONAL TASKt <br />• Well Flushing Piping Modifications Plan and. Sections <br />• On -site Piping Modifications and Connections <br />Adding S„moo u Hyp chlorite Facilities (OPTIONAL. TASK) <br />• Sodium Hypochlorlte Generation Schematic and Details <br />Sodium Hypochlorlte Mechanical Piping Plan and Sections <br />• Sodium Hypochlorlte Building Structural Plans (2 sheets) <br />• Structural Details <br />• Existing Well Site Electrical Plan and Single Line Diagram <br />• Sodium Hypoohlprite Building Power and Lighting Plan <br />• Sodium Hypochlorlte P&ID <br />Well Operation Modificatipn (directly into distributlan sv rem OPTIONAL TASK) <br />• Well Block Diagram Upgrade <br />• Well Loop Diagram Upgrade <br />• Well PLC Modifications <br />Well P&ID Upgrade <br />`Traffic Control Plans (site-spaciffGl (OPTION4L TASK) <br />• Traffic Control Plans for Potholing (3 sheets) <br />• Traffic Control Plans for Geotechnical investigation (2 sheets) <br />• Traffic Control Plans for Pipeline Construction (3 sheets) <br />Task s„ PLC Panel Design and Control Strategies - This task is an Optional Task if the City <br />decides to revise, upgrade, or modify the PLC panel design and the well control strategies. The <br />following Is a brief summary of the Optional scope of work: <br />• Review and update/revise the Functional Specification provided by the City, <br />• Modify control panel per City's new standard control panel drawings and specifications. <br />• Prepare wiring diagrams, loop diagrams and control panel drawings. <br />City of Santo Ana • 15 . TETRA TECH <br />