Laserfiche WebLink
N <br />TETRATECH Mark. W. Bush, PE <br />QA/CSC <br />backwash recirculation pumps, sludge mixer pumps, sodium hypochiorite and ammonia <br />treatment systems, and an emergency generator. The facility included the following <br />build ingtenciosures: well building removable sound enclosure; pre-engineered, prefabricated <br />precast concrete electrical building; and prefabricated fiberglass insulated building for the <br />backwash pump enclosure, <br />Irvine Desalter Project Potable and Non -Potable Well Drilling and Equipping, Irvine Ranch <br />Water District, Irvine, CA — Project Engineer for the preparation of plans slid specifications for <br />the drilling and equipping of design of well drilling for five potable water wells and one non - <br />potable water well. This included wellhead equipping for each well for both aboveground and <br />belowground facilities, Also included in this project were modifications to an exiisting non -potable <br />water well. , <br />Well No, 34 Modifications, City of Santa Ana, Santa Ana, CA — Design Engineer for the well <br />modifications which included the addition of a new pump and motor, <br />John Garthe reservoir Improvements, Phase It, City of Santa Ana, CA -» The Phase II <br />Improvements included the demolition of a 5 MG gunite, reservoir, buildings and a pump station <br />and the construction of two new 5 MG circular prestressed concrete reservoirs, drilling and <br />equipping of Well No. 39, a new potable well (1,350 feet deep), installation of three sodium <br />hypochiorite disinfection facilities, and site landscaping improvements. <br />Centennial Park Neighborhood Water Main improvements, City of Santa Ana, Santa Ana, <br />CA — Project Manager for approximately 20,000 linear feet of 8-inch PVC water main to replace <br />existing water mains. <br />Central City Water Main Improvements, City of Santa Ana, Tanta Ana, CA— Project <br />Manager for approximately 6,600 linear feet of 8-inch PVC water main to replace existing water <br />mains. <br />Pico -Lowell Neighborhood Water Main Improvements, City of Santa Ana, Santa Ana, CA — <br />Project Manager for approximately 8,200 linear feet of 8-and 12-Inch PVC water main to replace <br />existing water mains. <br />Mid City Neighborhood Water Main Replacement Project, City of Santa Ana, Santa Aria, <br />CA — Project Engineer for approximately 9,000 linear feet of 12- and 8-inch PVC water main to <br />replace existing water mains. Project included the hot tap of two existing water mains and 15 cut <br />In connections. <br />Bristol Street Widening Water Main Replacement Project, City of Santa Ana, Santa Ana, <br />CA — Project Manager for approximately 6,000 linear feet of 12- and 8-inch PVC water main to <br />replace existing water mains. <br />Paget <br />