NTETRATECH
<br />Mr. Tsai has over 24 years of professional experience in water,
<br />wastewater, and recycled water engineering. Mr, Tsoi has been
<br />responsible for the planning and design of water, wastewater, and
<br />recycled water pipelines along with pump stations; flow control
<br />facilities; reservoirs and site improvements, He is knowledgeable
<br />in the use of the latest computer software including CARD,
<br />horizontal control, hydrology, hydraulics and various spreadsheet
<br />programs.
<br />EXPERIENCE
<br />Mid -Basin injection: Centennial Park Design Services,
<br />Orange County Water District, Santa Ana, CA — Design of four
<br />injection wells to be located within Centennial Parkin the City of
<br />Santa Ana for Orange County Water [District, to addition to the
<br />engineering services for the four injection wells, the project
<br />Includes the design of the supply pipeline, backflush pipeline,
<br />bridge crossing, two shared facility sites, a monitoring well site,
<br />site improvements, and paving of park access roads and parking
<br />lots.
<br />Well 27 Equipping Plan, city of Orange, Orange, CA — Project
<br />Engineer for the preparation of the plans, specifications and cost
<br />estimate for the equipping of a potable water well, As pan of the
<br />well equipping a generator room was installed for backup power.
<br />Michael Tsol, PE
<br />Well Equipping Lead
<br />Education;
<br />University of California, Irvine
<br />83, Civil Engineering, 18Q1
<br />Reg istration s/Cortifl cats ohs;
<br />Registered Professional
<br />Engineer
<br />California No, $3715
<br />Professional Affiliations:
<br />American Society of Civil
<br />Engineers
<br />Office:
<br />Irvine, California
<br />Years of Experience:
<br />24
<br />Years with Tetra Tech:
<br />24
<br />Plant 13 Booster Station Rehabilitation and Well 22 Improvements; City of Lakewood,
<br />Lakewood, CA — Project Engineer for plans, specifications and cost estirriatn for the
<br />replacement of a 4,600 gpm booster pump station and replacement of a 1,200 gpm well pump.
<br />In addition to the booster pump station replacement, the construction was phased so the
<br />booster station was operational during construction,
<br />Well 106 Well Siting Study, Irvine Ranch Water District, Irvine, CA -- Project Engineer for a
<br />study to determine the location of replacement Well 106. Several locations were evaluated to
<br />determine if drilling was feasible along with connection to the rest of the raw water system.
<br />Well 107 Replacement, Irvine stanch Water District, Irvine, CA — Project Engineer for the
<br />preparation of the plans, specifications, cost estimate and construction services for the drilling
<br />and equipping of a potable water well in the City of Irvine. This project combined the well drilling
<br />and well equipping phases of the project together.
<br />Well 78 Replacement, Irvine Ranch Water District, Irvine, CA — Project Engineer for the
<br />drilling and equipping of a recycled water well in the City of Irvine. This project included
<br />construction of the well within a highly visible area with limited work space.
<br />Irvine Desalter Project Potable and Nan -Potable Well Drilling and Equipping, Irvine Ranch
<br />Water District, Irvine, CA — Project Engineer for the preparation of plans and specifications for
<br />the drilling and equipping for design of well drilling for five potable water wells and one non -
<br />Page 1
<br />
|