Laserfiche WebLink
NTETRATECH <br />Mr. Tsai has over 24 years of professional experience in water, <br />wastewater, and recycled water engineering. Mr, Tsoi has been <br />responsible for the planning and design of water, wastewater, and <br />recycled water pipelines along with pump stations; flow control <br />facilities; reservoirs and site improvements, He is knowledgeable <br />in the use of the latest computer software including CARD, <br />horizontal control, hydrology, hydraulics and various spreadsheet <br />programs. <br />EXPERIENCE <br />Mid -Basin injection: Centennial Park Design Services, <br />Orange County Water District, Santa Ana, CA — Design of four <br />injection wells to be located within Centennial Parkin the City of <br />Santa Ana for Orange County Water [District, to addition to the <br />engineering services for the four injection wells, the project <br />Includes the design of the supply pipeline, backflush pipeline, <br />bridge crossing, two shared facility sites, a monitoring well site, <br />site improvements, and paving of park access roads and parking <br />lots. <br />Well 27 Equipping Plan, city of Orange, Orange, CA — Project <br />Engineer for the preparation of the plans, specifications and cost <br />estimate for the equipping of a potable water well, As pan of the <br />well equipping a generator room was installed for backup power. <br />Michael Tsol, PE <br />Well Equipping Lead <br />Education; <br />University of California, Irvine <br />83, Civil Engineering, 18Q1 <br />Reg istration s/Cortifl cats ohs; <br />Registered Professional <br />Engineer <br />California No, $3715 <br />Professional Affiliations: <br />American Society of Civil <br />Engineers <br />Office: <br />Irvine, California <br />Years of Experience: <br />24 <br />Years with Tetra Tech: <br />24 <br />Plant 13 Booster Station Rehabilitation and Well 22 Improvements; City of Lakewood, <br />Lakewood, CA — Project Engineer for plans, specifications and cost estirriatn for the <br />replacement of a 4,600 gpm booster pump station and replacement of a 1,200 gpm well pump. <br />In addition to the booster pump station replacement, the construction was phased so the <br />booster station was operational during construction, <br />Well 106 Well Siting Study, Irvine Ranch Water District, Irvine, CA -- Project Engineer for a <br />study to determine the location of replacement Well 106. Several locations were evaluated to <br />determine if drilling was feasible along with connection to the rest of the raw water system. <br />Well 107 Replacement, Irvine stanch Water District, Irvine, CA — Project Engineer for the <br />preparation of the plans, specifications, cost estimate and construction services for the drilling <br />and equipping of a potable water well in the City of Irvine. This project combined the well drilling <br />and well equipping phases of the project together. <br />Well 78 Replacement, Irvine Ranch Water District, Irvine, CA — Project Engineer for the <br />drilling and equipping of a recycled water well in the City of Irvine. This project included <br />construction of the well within a highly visible area with limited work space. <br />Irvine Desalter Project Potable and Nan -Potable Well Drilling and Equipping, Irvine Ranch <br />Water District, Irvine, CA — Project Engineer for the preparation of plans and specifications for <br />the drilling and equipping for design of well drilling for five potable water wells and one non - <br />Page 1 <br />