NTETRATECM Erin Cabahlero
<br />Well Design
<br />Me, Caballero has provided design engineering in various water
<br />Education:
<br />and wastewater projects including domestic water pipelines, water
<br />a.s., civil Engineering,
<br />main replacements; gravity sgwer mains, gravity force mains,
<br />University of California, Irvine,
<br />pump stations, lift stations, reinforced concrete reservoirs, steel
<br />2009
<br />tank reservoirs, flow control facilities, and pressure reducing valve
<br />Registrations:
<br />vaults. Responsibilities have Included preparation of construction
<br />Engineer In 1"ralning,
<br />plans, specifications, and design calculations; assisted
<br />California, 2008, No 131891
<br />supervisors in preparing project memorandums and project
<br />schedules; and organized office technical library.
<br />(7ffice:
<br />Irvine, California.
<br />EXPERIENCE
<br />Years of Ezperlenoe:
<br />Mid -Basin injection; Centennial Park Design Services, Orange
<br />Nine
<br />County Water District, Santa Ana, CA w Design Engineer for
<br />fear injection wells tobe located within centennial Park In the City
<br />Years with Tetra Tech;
<br />of Santa Ana for Orange County Water District, In addition to the
<br />Seven
<br />engineering servicesforthe four injection wells, the project
<br />includes the design of the supply pipeline, backfiush pipeline,
<br />bridge crossing, two shared facility sites; a monitoring well site,
<br />site Improvements, and paving of park access roads and parking
<br />lots.
<br />Well No, 29 and Elizabeth Reservoir and Booster Pump Station, City of South Gate
<br />Design Engineer for the design and construction support for the drilling and equipping of a new
<br />2,500 gpm well, sodium hypochlorite facilities, and generator at the well site and a 1,6 steel
<br />reservoir, booster pump station consisting of three 125 hp pumps/motors at the reservoir site,
<br />and about 5,000 feet of water main replacements within the City of South Gate. The project
<br />combined the well drilling and well equipping phases of the work together.
<br />Well 78 Replacement, Irvine Ranch Water District, Irvine, CA — Design Engineer for the
<br />drilling and equipping of a recycled water well in the City of Irvine.
<br />Well No. 27, City of Orange, Orange, CA h- Design Engineerfor the drilling and equipping of
<br />Well 27, a new potable water well (930 feet deep). The project involved the partial demolition of
<br />an existing warehouse to accommodate the footprint of the new well, installation of a CMU block
<br />control building and sodium hypochlorite building,12.5%o sodium hypcchlorito disinfection
<br />facility, sound enclosure around the well head back -Lip generator, as well as, site and
<br />landscaping improvements.
<br />Burris Pump Station, Orange County Water District, Anaheim, CA — Design Engineer for
<br />the design of the new Burris Pump Station which consists of four 1,750 horsepower vertical
<br />turbine pumps delivering a maximum flow rate of 200 cis to the Santiago Basins from Burris
<br />Basin. Work consisted of reviewing the existing Burris Pump Station Evaluation Report,
<br />assisting OCWD with selecting a replacement option, performing final design of the selected
<br />option and providing bid and construction phase services. The project also included unique
<br />designs: 190,000 cubic yards of earthwork to be completed prior to pump station construction,
<br />the construction of a 55-foot diameter by 55-foot high circular wet well which was computer and
<br />physically modeled during design for flow characteristics, and the construction of a 180,000
<br />gallon surge suppression system.
<br />laagc' 7
<br />
|