Laserfiche WebLink
NTETRATECM Erin Cabahlero <br />Well Design <br />Me, Caballero has provided design engineering in various water <br />Education: <br />and wastewater projects including domestic water pipelines, water <br />a.s., civil Engineering, <br />main replacements; gravity sgwer mains, gravity force mains, <br />University of California, Irvine, <br />pump stations, lift stations, reinforced concrete reservoirs, steel <br />2009 <br />tank reservoirs, flow control facilities, and pressure reducing valve <br />Registrations: <br />vaults. Responsibilities have Included preparation of construction <br />Engineer In 1"ralning, <br />plans, specifications, and design calculations; assisted <br />California, 2008, No 131891 <br />supervisors in preparing project memorandums and project <br />schedules; and organized office technical library. <br />(7ffice: <br />Irvine, California. <br />EXPERIENCE <br />Years of Ezperlenoe: <br />Mid -Basin injection; Centennial Park Design Services, Orange <br />Nine <br />County Water District, Santa Ana, CA w Design Engineer for <br />fear injection wells tobe located within centennial Park In the City <br />Years with Tetra Tech; <br />of Santa Ana for Orange County Water District, In addition to the <br />Seven <br />engineering servicesforthe four injection wells, the project <br />includes the design of the supply pipeline, backfiush pipeline, <br />bridge crossing, two shared facility sites; a monitoring well site, <br />site Improvements, and paving of park access roads and parking <br />lots. <br />Well No, 29 and Elizabeth Reservoir and Booster Pump Station, City of South Gate <br />Design Engineer for the design and construction support for the drilling and equipping of a new <br />2,500 gpm well, sodium hypochlorite facilities, and generator at the well site and a 1,6 steel <br />reservoir, booster pump station consisting of three 125 hp pumps/motors at the reservoir site, <br />and about 5,000 feet of water main replacements within the City of South Gate. The project <br />combined the well drilling and well equipping phases of the work together. <br />Well 78 Replacement, Irvine Ranch Water District, Irvine, CA — Design Engineer for the <br />drilling and equipping of a recycled water well in the City of Irvine. <br />Well No. 27, City of Orange, Orange, CA h- Design Engineerfor the drilling and equipping of <br />Well 27, a new potable water well (930 feet deep). The project involved the partial demolition of <br />an existing warehouse to accommodate the footprint of the new well, installation of a CMU block <br />control building and sodium hypochlorite building,12.5%o sodium hypcchlorito disinfection <br />facility, sound enclosure around the well head back -Lip generator, as well as, site and <br />landscaping improvements. <br />Burris Pump Station, Orange County Water District, Anaheim, CA — Design Engineer for <br />the design of the new Burris Pump Station which consists of four 1,750 horsepower vertical <br />turbine pumps delivering a maximum flow rate of 200 cis to the Santiago Basins from Burris <br />Basin. Work consisted of reviewing the existing Burris Pump Station Evaluation Report, <br />assisting OCWD with selecting a replacement option, performing final design of the selected <br />option and providing bid and construction phase services. The project also included unique <br />designs: 190,000 cubic yards of earthwork to be completed prior to pump station construction, <br />the construction of a 55-foot diameter by 55-foot high circular wet well which was computer and <br />physically modeled during design for flow characteristics, and the construction of a 180,000 <br />gallon surge suppression system. <br />laagc' 7 <br />