Laserfiche WebLink
TETRATECH Kyle Bohn, PE <br />Design Engineer <br />} <br />C <br />6 i; <br />C <br />demolition of an existing warehouse to aocommodate the footprint of the new well, installation of <br />a CMU block control building and sodium hypochiorlte building, 12.5% sodium hypochlorite <br />disinfection facility, sound enclosure around the well head as well as site and landscapingv <br />improvements. <br />j <br />SA-4 and SA-6 Vault Relocations, City of Santa Ana, Santa Ana, CA — Design Engineer for <br />a <br />the design and construction phases of two pressure reducing valve vaults. The project included <br />1 <br />the design of steel and ductile iron yard piping and connections to the existing City system, <br />pressure reducing valves, and concrete vaults. <br />Y, <br />Trunk Line Sewer Deconstruction, City of San Juan Capistrano, San Juan Capistrano, CA <br />'t <br />a Design Engineer for design to replace approximately 450 linear feet of deficient 24-inch• <br />sewer, The design included removing an existing abandoned 30-inch sewer and constructing a <br />new 27,mch PVC sewer in its place. Project included permitting through the City of Dana Point <br />and coordination with SOCWA, <br />' t <br />San Lorenzo Sewage Lift Station, City of Santa Ana, Santa Ana, CA - Design Engineer for <br />.f <br />the preparation of plans, specifications and cost estimates to construct a new sewer lift station <br />I' <br />on San Lorenzo Avenue within the City pf Santa Ana, The Improvements included a weft well, <br />dry well, three variable frequency drive pumps, aboveground CMU block control room, <br />.f <br />emergency generator, hardscape and landscape Improvements and approximately 1,$00 linear <br />G <br />feet of new sewer main. <br />Gisler-Redhili Trunk Improvements, Reach B, Orange County Sanitation District; Tustin, <br />` E <br />CA — Design Engineer for the replacement of 21- and 24-inch sewer mains in the Gisler-Redhill <br />Trunk Improvements, Reach B to be replaced with 24• to 36-inch pipelines. The project <br />b <br />traversed through the cities of Tustin, Santa Ana and Irvine. Scope of services included <br />preliminary design, final design, and construction administration, <br />Western Avenue Sewer Project, City of Buena Park, Buena Park, CA -- Design Engineer for <br />the preparation of plans, specifications and cost estimates for construction of 1,7DD linear feet of <br />t <br />a 15-Inch VCP relief sewer in Western Avenue. <br />36-Inch Transmission Main Replacement, City of Anaheim, Anaheim, CA — Design <br />Engineer for the preparation of the plans, specifications, cost estimates and construction <br />services for the construction of 700 linear feet of X-Inch steel pipeline. <br />Ohio Street and Oriente Drive Pipeline Replacement, Yorba Linda Water District, Yorba <br />Linda, CA-- Design Engineer for approximately 3,000 feet of 16-inch ductile iron and 1,000 feet <br />of PVC water main to replace existing cast iron water mains within the City of Yorba Linda. The <br />project included the replacement of existing water services, fire hydrants and the up -sizing of <br />the existing main. <br />SA-3 Vault, City of Santa Ana, Santa Ana, CA — Design Engineer for the design and <br />construction phases of a pressure reducing valve vault. The project included steel yard piping <br />and connections to the existing city system, a pressure reducing valve, and a concrete vault. <br />