TETRATECH Kyle Bohn, PE
<br />Design Engineer
<br />}
<br />C
<br />6 i;
<br />C
<br />demolition of an existing warehouse to aocommodate the footprint of the new well, installation of
<br />a CMU block control building and sodium hypochiorlte building, 12.5% sodium hypochlorite
<br />disinfection facility, sound enclosure around the well head as well as site and landscapingv
<br />improvements.
<br />j
<br />SA-4 and SA-6 Vault Relocations, City of Santa Ana, Santa Ana, CA — Design Engineer for
<br />a
<br />the design and construction phases of two pressure reducing valve vaults. The project included
<br />1
<br />the design of steel and ductile iron yard piping and connections to the existing City system,
<br />pressure reducing valves, and concrete vaults.
<br />Y,
<br />Trunk Line Sewer Deconstruction, City of San Juan Capistrano, San Juan Capistrano, CA
<br />'t
<br />a Design Engineer for design to replace approximately 450 linear feet of deficient 24-inch•
<br />sewer, The design included removing an existing abandoned 30-inch sewer and constructing a
<br />new 27,mch PVC sewer in its place. Project included permitting through the City of Dana Point
<br />and coordination with SOCWA,
<br />' t
<br />San Lorenzo Sewage Lift Station, City of Santa Ana, Santa Ana, CA - Design Engineer for
<br />.f
<br />the preparation of plans, specifications and cost estimates to construct a new sewer lift station
<br />I'
<br />on San Lorenzo Avenue within the City pf Santa Ana, The Improvements included a weft well,
<br />dry well, three variable frequency drive pumps, aboveground CMU block control room,
<br />.f
<br />emergency generator, hardscape and landscape Improvements and approximately 1,$00 linear
<br />G
<br />feet of new sewer main.
<br />Gisler-Redhili Trunk Improvements, Reach B, Orange County Sanitation District; Tustin,
<br />` E
<br />CA — Design Engineer for the replacement of 21- and 24-inch sewer mains in the Gisler-Redhill
<br />Trunk Improvements, Reach B to be replaced with 24• to 36-inch pipelines. The project
<br />b
<br />traversed through the cities of Tustin, Santa Ana and Irvine. Scope of services included
<br />preliminary design, final design, and construction administration,
<br />Western Avenue Sewer Project, City of Buena Park, Buena Park, CA -- Design Engineer for
<br />the preparation of plans, specifications and cost estimates for construction of 1,7DD linear feet of
<br />t
<br />a 15-Inch VCP relief sewer in Western Avenue.
<br />36-Inch Transmission Main Replacement, City of Anaheim, Anaheim, CA — Design
<br />Engineer for the preparation of the plans, specifications, cost estimates and construction
<br />services for the construction of 700 linear feet of X-Inch steel pipeline.
<br />Ohio Street and Oriente Drive Pipeline Replacement, Yorba Linda Water District, Yorba
<br />Linda, CA-- Design Engineer for approximately 3,000 feet of 16-inch ductile iron and 1,000 feet
<br />of PVC water main to replace existing cast iron water mains within the City of Yorba Linda. The
<br />project included the replacement of existing water services, fire hydrants and the up -sizing of
<br />the existing main.
<br />SA-3 Vault, City of Santa Ana, Santa Ana, CA — Design Engineer for the design and
<br />construction phases of a pressure reducing valve vault. The project included steel yard piping
<br />and connections to the existing city system, a pressure reducing valve, and a concrete vault.
<br />
|