Laserfiche WebLink
NTETRATECH <br />Man Hong (Eric) Yuen, PE, SE <br />Structural Design <br />Mr. Yuen has over eight years of experience in the design, <br />educatlon: <br />analysis and detailing in structural engineering. He is <br />S.S., civil Engineering; <br />knowledgeable In reinforced concrete, masonry, structural steel <br />Callfornla State Polytechnic <br />and wood frame design, and construction for a variety of building <br />university, Pomona, 2007 <br />and infrastructure projects including reservoirs, water/wastewater <br />Registrations/Certifications: <br />treatment facilities, as well as seismic retrofit of existing <br />Profassionai Engineer. Colifornia <br />structures, <br />2009, No, 75983 <br />EXPERIENCE <br />Structural engineer, California <br />2014, No. $177 <br />Equipping of Wells 1-16, 1.17, and 1.10, Chino Basin Deselter <br />Col CES Safety Assessment <br />Authority, Chino, CA — Tatra Tech Is providing design and <br />Program Evaluator Tralnirig <br />construction engineering services for the equipping of three new <br />wells at three separate sites. The scope of the structural design <br />Professional Affiliations: <br />includes foundations for prefabricaated electrical enclosures, surge <br />American institute of steel <br />construction <br />tank, well pedestals, pipe'racks and supports. Services include <br />conceptual design, permitting assistance, final design, bid <br />Field Safety Cortificatioiis: <br />assistance, and construction assistance. Mr. Yuen served as the <br />Fail Protection (Ladders; <br />structural designer on this project, <br />Scaffolding, Aerial Lifts) <br />Design -Build -Build of Wells 21 and 22 Desalter, Irvine Water <br />0912010 <br />District, Irvine, CA— Mr. Yuen served as Structural Design <br />N's Protection Training <br />Engineer for this design -build project. This project is a membrane <br />Respiratory Protection Training <br />water treatment plant that consists of a buried rectangular <br />Confined Space Training <br />(1/2015) <br />concrete wet well, a concrete tilt -up process building and <br />numerous concrete mat foundations. Pascal & Ludwig is our <br />office: <br />Design -Build Partner and also the prime contractor on the project. <br />San Dimas, California <br />Tetra Tech will work under Pascal & Ludwig through a <br />subcontractor agreement, <br />Years of Experience: <br />Rancho Del Rey Wellhead Treatment Facility, Otay Water Light <br />District Chula Vista, CA — Mr, Yuen served as Structural Design Years with Tetra Tech: <br />Engineer for the design of a 5,100 square foot masonry building, Eight <br />with a steel truss framed roof, which houses a well head, RO <br />treatment facility, disinfection equipment, conventionally <br />reinforced concrete clearwell pump station, control room, office <br />and storage area. The design of the building balances the functional water production <br />requirements with the aesthetic, architectural design of the exterior of the building, which was <br />critical for compliance with local planning agency requirements. <br />Burris Pump Station, Orange County Water District (OCWD), Anaheim, CA — Design <br />Engineer for the replacement of an existing pumping facility at the Burris Pump Station location. <br />Mr. Yuen was involved in the comprehensive design of the 0.8 MG buried circular wet well, The <br />new facility will allow OCWD to transfer up to 200 cubic feet per second from the Santa Ana <br />River, which will be and utilized for groundwater recharge to the Santiago Basins, Mr. Yuen also <br />reviews shop drawings and responds to RFIs during the ongoing construction phase of this <br />project, <br />Page 7 <br />