NTETRATECH
<br />Man Hong (Eric) Yuen, PE, SE
<br />Structural Design
<br />Mr. Yuen has over eight years of experience in the design,
<br />educatlon:
<br />analysis and detailing in structural engineering. He is
<br />S.S., civil Engineering;
<br />knowledgeable In reinforced concrete, masonry, structural steel
<br />Callfornla State Polytechnic
<br />and wood frame design, and construction for a variety of building
<br />university, Pomona, 2007
<br />and infrastructure projects including reservoirs, water/wastewater
<br />Registrations/Certifications:
<br />treatment facilities, as well as seismic retrofit of existing
<br />Profassionai Engineer. Colifornia
<br />structures,
<br />2009, No, 75983
<br />EXPERIENCE
<br />Structural engineer, California
<br />2014, No. $177
<br />Equipping of Wells 1-16, 1.17, and 1.10, Chino Basin Deselter
<br />Col CES Safety Assessment
<br />Authority, Chino, CA — Tatra Tech Is providing design and
<br />Program Evaluator Tralnirig
<br />construction engineering services for the equipping of three new
<br />wells at three separate sites. The scope of the structural design
<br />Professional Affiliations:
<br />includes foundations for prefabricaated electrical enclosures, surge
<br />American institute of steel
<br />construction
<br />tank, well pedestals, pipe'racks and supports. Services include
<br />conceptual design, permitting assistance, final design, bid
<br />Field Safety Cortificatioiis:
<br />assistance, and construction assistance. Mr. Yuen served as the
<br />Fail Protection (Ladders;
<br />structural designer on this project,
<br />Scaffolding, Aerial Lifts)
<br />Design -Build -Build of Wells 21 and 22 Desalter, Irvine Water
<br />0912010
<br />District, Irvine, CA— Mr. Yuen served as Structural Design
<br />N's Protection Training
<br />Engineer for this design -build project. This project is a membrane
<br />Respiratory Protection Training
<br />water treatment plant that consists of a buried rectangular
<br />Confined Space Training
<br />(1/2015)
<br />concrete wet well, a concrete tilt -up process building and
<br />numerous concrete mat foundations. Pascal & Ludwig is our
<br />office:
<br />Design -Build Partner and also the prime contractor on the project.
<br />San Dimas, California
<br />Tetra Tech will work under Pascal & Ludwig through a
<br />subcontractor agreement,
<br />Years of Experience:
<br />Rancho Del Rey Wellhead Treatment Facility, Otay Water Light
<br />District Chula Vista, CA — Mr, Yuen served as Structural Design Years with Tetra Tech:
<br />Engineer for the design of a 5,100 square foot masonry building, Eight
<br />with a steel truss framed roof, which houses a well head, RO
<br />treatment facility, disinfection equipment, conventionally
<br />reinforced concrete clearwell pump station, control room, office
<br />and storage area. The design of the building balances the functional water production
<br />requirements with the aesthetic, architectural design of the exterior of the building, which was
<br />critical for compliance with local planning agency requirements.
<br />Burris Pump Station, Orange County Water District (OCWD), Anaheim, CA — Design
<br />Engineer for the replacement of an existing pumping facility at the Burris Pump Station location.
<br />Mr. Yuen was involved in the comprehensive design of the 0.8 MG buried circular wet well, The
<br />new facility will allow OCWD to transfer up to 200 cubic feet per second from the Santa Ana
<br />River, which will be and utilized for groundwater recharge to the Santiago Basins, Mr. Yuen also
<br />reviews shop drawings and responds to RFIs during the ongoing construction phase of this
<br />project,
<br />Page 7
<br />
|