NTETRATECH Victor M. Ramirez, PE, SE
<br />Structural Lead
<br />Well 107 Replacement, Irvine Ranch Water District, Irvine, CA — Structural Project Manager
<br />for the Well 107 site, The structures include concrete masonry retaining walls, concrete mat
<br />foundations for electrical cabinets, concrete wellhead pedestals and pipe supports.
<br />Well78 Replacement, Irvine Ranch Water District, Irvine, CA — Structural Project Manager
<br />for a buried reinforced concrete well vault, The vault Is designed for the soil loading and H-20
<br />truck loading with applicable impact factors, The concrete wellhead pedestal is isolated from the
<br />vault structure to allow for differential settlement of the vault relative to the wellhead, without
<br />causing damage to the vault or wellhead.
<br />Equipping of Wells 1.16,1.17, and 1-18, Chino Basin pesalter Authority, Chino, CA — Tetra
<br />Tech is providing design and construction engineering services for the equlpp�ng of three new
<br />wells at three separate sites. The scope of the structural design includes foundations for
<br />prefabricated electrical enclosures, surge tank, well pedestals, pipe rooks and supports.
<br />Services include conceptual design, permitting assistance, final design, bid assistance, and
<br />construction assistance.
<br />Well C-5, City of Cerritos, CA — Mr: Ramirez served as Structural Project Engineer for this .
<br />2,000 square foot well building cn a mat foundation, to mitigate the effects of potential
<br />liquefaction. The facility has nine separate rooms for housing mechanical, electrical, disinfection
<br />and water conditioning equipment, The building also contains rooms for an emergency
<br />generator and HVAC equipment as well as office and restroom spaces, Portions of the walls
<br />and roof at the well are removable. The structural design work scope also Included architectural
<br />services for making the well building match the buildings in the adjacent housing development,
<br />Well No. 27 Treatment Plant, Lakewood, CA — Design and construction phase, services for a
<br />groundwater treatment facility which includes foundations for filter vessel, storage tanks, and
<br />pumping equipment, The design also Includes the structural and architectural design of a 10
<br />foot high masonry screen wall which mirrors several of the architectural features which occur in
<br />the community that surrounds the plant.
<br />Rancho Del Rey Wellhead Treatment Facility, Otay Water District Chula Vista, CA
<br />Project structural Engineer for the design of a 5100 square foot masonry building, with a steel
<br />truss framed root, which houses a well head, RO treatment facility, disinfection equipment,
<br />conventionally reinforced concrete clearwell pump station, control room, office and storage area.
<br />The design of the building balances the functional water produotion requirements with the
<br />aesthetic, architectural design of the exterior of the building, which was critical for compliance
<br />with local planning agency requirements,
<br />Irvine Dosalter Project, Irvine Ranch Water District, Irvine, CA w Structural Project Engineer
<br />for a project which includes a 6,000 square foot tilt -up concrete RO filtration building, several
<br />partially buried cast -in -place concrete clearwell pump stations, a buried cast -in -place concrete
<br />well vault, 270 linear feet of 26 foot high tilt -up concrete free-standing fence wall and several
<br />chemical containment areas with steel framed canopies.