ay_pfSanta Ana
<br />.__.__._
<br />Tyrone Peter, PE
<br />,
<br />Project Manager,
<br />11.1
<br />Profile Summary
<br />Education: BS, Engineering and Civil Engineering, Tamil Nadu College of Engineering
<br />r"
<br />Civil Engineering, Murugappa Polytechnic
<br />�-
<br />Registration. Civil Engineer, California No, 81888
<br />Affiliations: American Public Works Associatlon
<br />American Society of Civil Engineers
<br />I
<br />,
<br />Experience: 11 Years
<br />ble for overall project management and oversight required for the corridor improvements from Alameda
<br />Mr, Tyrone Peter Is an accomplished civil engineer for multi-discipllne and multi -agency infrastructure pro.
<br />L
<br />jeots and is known for providing innovative, quality engineering services to ensure project delivery within
<br />budget and schedule. As the project manager for the City's On Call Engineering Services project, with quail -
<br />1.1
<br />fled staff and resources, he will be responsible for successful project delivery,
<br />0
<br />Mr. Peter's 11 plus years of experience managing and designing all types of public works projects provide a
<br />I
<br />solid foundation to understand what Is needed to deliver a successful project and make him the perfect fit
<br />for overseeing the entire project as well as specific civil engineering tasks His comprehensive experience
<br />includes design of state highway, now street, street widening, street realignment, pavement rehabilltation,
<br />" I
<br />light rail and railroad, grade separation, flood control facility, water, and sewer projects. Mr. Peter has super-
<br />vised feasibility study, project study report, project report, construction document preparation as well as
<br />L
<br />grade certification Issuance, construction administration, and construction inspection,
<br />Relevant project Experlonce
<br />ry
<br />Emerald Bay Main Gate Safety Improvements, Emerald Bay Service District, Laguna Beach, Callfor-
<br />"-•'
<br />necessary reports, specifications, and estimates documentation, Performance of these responslbili-
<br />plans,
<br />tles required expertise and knowledge In street, traffic, drainage, structural, and pavement design, ADA
<br />11.1
<br />standards, public outreach, pedestrian safety, and water quality. Wllldan provided civil and traffic engineer-
<br />ing design and other appurtenant services for safety improvements at the main gate entrance. Improve-
<br />r"
<br />ments Involved road widening, guardhouse relocation and reconstruction; grading to accommodate the
<br />�•�
<br />roadway widening and landscaping; installing upgraded lighting, ADA-compilant curbs and ramps, and ro-
<br />talning and monument walls; widening the right•turn pocket and Installing a median; and installing street
<br />striping and signage within Caltrans' right-of-way.
<br />I
<br />,
<br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Project Manager responsi-
<br />ble for overall project management and oversight required for the corridor improvements from Alameda
<br />Street to Hunt Avenue. Performance of these responsibilities required expertise and knowledge in streat
<br />10,
<br />and pavement design, ADA standards, public outreach, environmental documentation, Green Street design,
<br />and watershed management planning. The Improvements Involved increasing traffic capacity by reconfigur-
<br />1.1
<br />Ing the roadway from flour to six lanes; pavement rehabilitation; landscape and hardscape medians; median
<br />0
<br />lighting; sidewalk, curb and gutter, and driveway approach reconstruction; ADA-compilant ramps; parkway
<br />trees; artistic elements, corridor entrance monument; bus shelter and bus turnouts; and traffic signal modifi-
<br />cations, Services provided Included civil, traffic, pavement, and drainage engineering; landscape architso
<br />tura, survey and right-of-way engineering; and utillty relocation.
<br />" I
<br />Orange Line Extension, Brutoco Engineering & Construction, Inc./Los Angeles County Metropolitan
<br />Transportation Authority, Los Angeles, California, Civil Engineering Task Loader responsible for provld-
<br />Ing and overseeing all civil improvement design required for the design/bulld of the MOL extension from the
<br />Chatsworth Station to Canoga Station in the San Fernando Valley along Canoga Avenue, Performance of
<br />n
<br />these responsibilities required expertise and knowledge In Intersection design, bike lanes, ADA standards,
<br />street geometric design, light-rail standards, parking lot and roadside safety design. Wllldan prepared plans,
<br />specifications, and estimate for street widening, raised landscaped medians, Irrigation system, ADA access
<br />curb ramps, bicycle paths, park-and-ride and parking lot facilities, traffic signal modifications, communlca-
<br />tlon conduits, and signing and striping. Three stations were constructed or reconstructed,
<br />u.0
<br />19Comprehensive. Innovative. Trusted, Proposal for On-call Engineering,
<br />RFP No. 17.083
<br />a�
<br />
|