Laserfiche WebLink
ay_pfSanta Ana <br />.__.__._ <br />Tyrone Peter, PE <br />, <br />Project Manager, <br />11.1 <br />Profile Summary <br />Education: BS, Engineering and Civil Engineering, Tamil Nadu College of Engineering <br />r" <br />Civil Engineering, Murugappa Polytechnic <br />�- <br />Registration. Civil Engineer, California No, 81888 <br />Affiliations: American Public Works Associatlon <br />American Society of Civil Engineers <br />I <br />, <br />Experience: 11 Years <br />ble for overall project management and oversight required for the corridor improvements from Alameda <br />Mr, Tyrone Peter Is an accomplished civil engineer for multi-discipllne and multi -agency infrastructure pro. <br />L <br />jeots and is known for providing innovative, quality engineering services to ensure project delivery within <br />budget and schedule. As the project manager for the City's On Call Engineering Services project, with quail - <br />1.1 <br />fled staff and resources, he will be responsible for successful project delivery, <br />0 <br />Mr. Peter's 11 plus years of experience managing and designing all types of public works projects provide a <br />I <br />solid foundation to understand what Is needed to deliver a successful project and make him the perfect fit <br />for overseeing the entire project as well as specific civil engineering tasks His comprehensive experience <br />includes design of state highway, now street, street widening, street realignment, pavement rehabilltation, <br />" I <br />light rail and railroad, grade separation, flood control facility, water, and sewer projects. Mr. Peter has super- <br />vised feasibility study, project study report, project report, construction document preparation as well as <br />L <br />grade certification Issuance, construction administration, and construction inspection, <br />Relevant project Experlonce <br />ry <br />Emerald Bay Main Gate Safety Improvements, Emerald Bay Service District, Laguna Beach, Callfor- <br />"-•' <br />necessary reports, specifications, and estimates documentation, Performance of these responslbili- <br />plans, <br />tles required expertise and knowledge In street, traffic, drainage, structural, and pavement design, ADA <br />11.1 <br />standards, public outreach, pedestrian safety, and water quality. Wllldan provided civil and traffic engineer- <br />ing design and other appurtenant services for safety improvements at the main gate entrance. Improve- <br />r" <br />ments Involved road widening, guardhouse relocation and reconstruction; grading to accommodate the <br />�•� <br />roadway widening and landscaping; installing upgraded lighting, ADA-compilant curbs and ramps, and ro- <br />talning and monument walls; widening the right•turn pocket and Installing a median; and installing street <br />striping and signage within Caltrans' right-of-way. <br />I <br />, <br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Project Manager responsi- <br />ble for overall project management and oversight required for the corridor improvements from Alameda <br />Street to Hunt Avenue. Performance of these responsibilities required expertise and knowledge in streat <br />10, <br />and pavement design, ADA standards, public outreach, environmental documentation, Green Street design, <br />and watershed management planning. The Improvements Involved increasing traffic capacity by reconfigur- <br />1.1 <br />Ing the roadway from flour to six lanes; pavement rehabilitation; landscape and hardscape medians; median <br />0 <br />lighting; sidewalk, curb and gutter, and driveway approach reconstruction; ADA-compilant ramps; parkway <br />trees; artistic elements, corridor entrance monument; bus shelter and bus turnouts; and traffic signal modifi- <br />cations, Services provided Included civil, traffic, pavement, and drainage engineering; landscape architso <br />tura, survey and right-of-way engineering; and utillty relocation. <br />" I <br />Orange Line Extension, Brutoco Engineering & Construction, Inc./Los Angeles County Metropolitan <br />Transportation Authority, Los Angeles, California, Civil Engineering Task Loader responsible for provld- <br />Ing and overseeing all civil improvement design required for the design/bulld of the MOL extension from the <br />Chatsworth Station to Canoga Station in the San Fernando Valley along Canoga Avenue, Performance of <br />n <br />these responsibilities required expertise and knowledge In Intersection design, bike lanes, ADA standards, <br />street geometric design, light-rail standards, parking lot and roadside safety design. Wllldan prepared plans, <br />specifications, and estimate for street widening, raised landscaped medians, Irrigation system, ADA access <br />curb ramps, bicycle paths, park-and-ride and parking lot facilities, traffic signal modifications, communlca- <br />tlon conduits, and signing and striping. Three stations were constructed or reconstructed, <br />u.0 <br />19Comprehensive. Innovative. Trusted, Proposal for On-call Engineering, <br />RFP No. 17.083 <br />a� <br />