Laserfiche WebLink
City of Santa Ana <br />Los Alamitos Boulevard Median Improvements, City of Los Alamitos, California. Project Manager re- <br />sponslble for overall project management and oversight required for the improvements between Cerritos <br />I Avenue and Katella Avenue. Performance of these responsibilities required expertise and knowledge in <br />street improvement, pavement rehabilitation, public outreach, slgning and striping, street lights, and planting <br />and Irrigation, improvements involved raised median, pavement delineation, landscape and irrigation im- <br />provements, street lighting and traffic signal Improvements at Intersections with <br />Florlsta Street and Sausalito Street. There was minor trafflo signal modification at intersections with Katella <br />Avenue and Cerritos Avenue. <br />Placentia Metrolink Statfon Phase I and If, Orange County Transportation Authority, Orange County, <br />California. Project Manager responsible for providing and overseeing all civil Improvement design required <br />for Infrastructure Improvements for the new station. The project site Involved approximately 4.75 acres to <br />provide a MetroUnk commuter rail station that meets currant and future transit demand and ADA require- <br />ments, The project goal fostered train ridership growth in the reglon, The station was planned as part of a <br />key component of translt-oriented development envisioned In the Westgate Specific Plan for the City of Pla• <br />i centia. The project Improvements included street, railroad track, and pedestrian Improvements; rail plat- <br />forms; and lighting, signing and striping of four parking facilltles for 425 vehicles, <br />Downs Street Widening, City of Ridgecrest, California. Civil Engineering Task Leader responsible for <br />providing and overseeing all civil improvement design required for the widening Improvements. Perfor- <br />manoe of these responsibilities required expertise and knowledge In alternative pavement design, bene- <br />fit/cost analysis, right-of-way engineering, street design, and utility coordination. The project Includes env!- <br />! ronmental compliance, right-of-way research, and design. The project limits are Upjohn Avenue and Ridge - <br />crest Boulevard, Improvements Include street widening and now curb, gutter, curb ramps, and sidewalks. <br />The preliminary engineering services include utility research, right-of-way research, field Investigations, solls <br />testing, and ground survey. <br />Street Improvements Phase 11, City of Los Alamitos, California. Project Manager responsible for overall <br />project management and oversight required for resurfacing of the following projects in the Phase II city-wide <br />program: <br />■ Via EI Mercado Street Improvements <br />■ Old Town West Improvements (Chestnut Street, Walnut Street, Fforista Street) <br />■ Commercial Street improvements (Cerritos Avenue, Ball Road, Reagan Street, Humboldt Street, Portal <br />Drive, Winners Circle, Los Alamitos Boulevard, Los Vaqueros Circle) <br />j Performance of these responsibilities required expertise and knowledge in pavement rehabllitatlon strate- <br />gies, ADA standards, and signing and striping. Willdan conducted site reconnaissance to observe the pave• <br />ment condition, conducted coring, testing and engineering analysis and summarized the findings In a ge- <br />otechnlcal report. Per the recommendation, the City streets within the project limits wore ground and resur- <br />faced with 2 -Inch thick asphalt -rubber hot mix or removed and replaced with asphalt concrete over aggre- <br />gate base or with joint plain cement concrete, All manhole, water valve, anode, and monitoring well covers <br />within the project limits were adjusted to grade. Curbs and driveways were protected In place, Sidewalks <br />J were Improved and ramps were Improved to current ADA requirements. <br />comprehensive, Innovative. MOW, Proposal for Oo-Call Enginesring, <br />�6 RFP No.17-083 <br />