Laserfiche WebLink
City of Santa Ana <br />Mohean Rahimlan, PE, GE <br />Material Testing Engineer <br />Profile Summary <br />Education: MS, Civil Enginsering, Tehran University, Tehran <br />Registration: Civil Engineer, California, No. 73398 <br />Geotechnloal Engineer, California, No, 3059 <br />Experience: 29 Years <br />Mr, Mohsen Rahimlan possesses expertise in geotsohnioal and material engineering, testing, Investiga- <br />tion, design, and construction and has lent that expertise to a wide spectrum of pubilo works projects. Mr, <br />Rahlmlan has substantial experience In conducting and managing geotechnlcal and material testing and <br />Inspection services during construction. He has performed diversified geotechnioal assignments, including <br />pavement design, shallow and deep foundation design, settlement evaluations, liquefaction studies, and <br />i slope stability analyses. Mr. Rahimlan experience Includes geotechnical, civil, and structural design and <br />construction management. <br />! Relevant Project Experience <br />Emerald Bay Main Gate Safety Improvements, Emerald Say Service district, Laguna Beach) Callfcr• <br />nla, Geotechnical Engineer responsible for quality assurance materials testing. Wllldan provided civil and <br />traffic engineering design and other appurtenant services for safety Improvements at the main gate en- <br />trance. Improvements involved road widening, guardhouse relocation and reconstruction; grading to accom- <br />modate the roadway widening and landscaping; installing upgraded lighting, ADA -compliant curbs and <br />i ramps, and retaining and monument walls; widening the right -turn pocket and Installing a medlen; and in- <br />stalling street striping and signage within Caltrans' right-of-way, <br />Placentia Metrolink Station Phase I and 11, Orange County Transportation Authority, Orange County, <br />California, Geotechnloal Engineer responsible for quallty assurance materials testing required for infra- <br />structure Improvements for the now station, The project site involved approximately 4.75 acres to provide at <br />Metrolink commuter rail station that meets current and future transit demand and ADA requirements. The <br />i project goal fostered train ridership growth In the region, The station was planned as part of a key compo- <br />nent of transit -oriented devefopment envisioned In the Westgate Specific Plan for the City of Placentia, The <br />project Improvements Included street, railroad track, and pedestrian Improvements; rail platforms; and light- <br />ing, signing and striping of four parking facilities for 425 vehicles, <br />Orange Line Extension, Brutoco Engineering & Construction, InoJLos Angeles County Metropolitan <br />Transportation Authority, Los Angeles, California. Geotechnical Engineer responsible for quality assur- <br />ance materials testing required for the design/build of the MCL extension from the Chatsworth Station to <br />Canoga Station In the San Fernando Valley along Canoga Avenue, Willdan prepared plans, specifications, <br />and estimate for street widening, raised landscaped medians, irrigation system, ADA access curb ramps, <br />r bicycle paths, park-and-ride and parking lot facilities, traffic signal modifloations, communication conduits, <br />and signing and striping. <br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Geotechnical Engineer <br />responsible for quality assurance materials testing required for the corridor Improvements from Alameda <br />Street to Hunt Avenue. The Improvements involved roadway widening from four to six lanes; pavement re- <br />habilitation; landscape and hardscape medians; median lighting; sidewalk, curb and gutter, and driveway <br />i approach reconstruction; ADA -compliant ramps; parkway trees; artistic elements, corridor entrance monu- <br />ment; bus shelter and bus turnouts; and traffic signal modifications. Services provided Included civil, traffic, <br />pavement, and drainage engineering; landscape architecture, survey and right-of-way engineering; and utib <br />I <br />ity relocation. <br />i <br />.- "LZ Proposal for On -Call Engineering 11 <br />�h � Comprehensive. Innovative, Trusted. Rpp No T 083 <br />