City of Santa Ana
<br />Mohean Rahimlan, PE, GE
<br />Material Testing Engineer
<br />Profile Summary
<br />Education: MS, Civil Enginsering, Tehran University, Tehran
<br />Registration: Civil Engineer, California, No. 73398
<br />Geotechnloal Engineer, California, No, 3059
<br />Experience: 29 Years
<br />Mr, Mohsen Rahimlan possesses expertise in geotsohnioal and material engineering, testing, Investiga-
<br />tion, design, and construction and has lent that expertise to a wide spectrum of pubilo works projects. Mr,
<br />Rahlmlan has substantial experience In conducting and managing geotechnlcal and material testing and
<br />Inspection services during construction. He has performed diversified geotechnioal assignments, including
<br />pavement design, shallow and deep foundation design, settlement evaluations, liquefaction studies, and
<br />i slope stability analyses. Mr. Rahimlan experience Includes geotechnical, civil, and structural design and
<br />construction management.
<br />! Relevant Project Experience
<br />Emerald Bay Main Gate Safety Improvements, Emerald Say Service district, Laguna Beach) Callfcr•
<br />nla, Geotechnical Engineer responsible for quality assurance materials testing. Wllldan provided civil and
<br />traffic engineering design and other appurtenant services for safety Improvements at the main gate en-
<br />trance. Improvements involved road widening, guardhouse relocation and reconstruction; grading to accom-
<br />modate the roadway widening and landscaping; installing upgraded lighting, ADA -compliant curbs and
<br />i ramps, and retaining and monument walls; widening the right -turn pocket and Installing a medlen; and in-
<br />stalling street striping and signage within Caltrans' right-of-way,
<br />Placentia Metrolink Station Phase I and 11, Orange County Transportation Authority, Orange County,
<br />California, Geotechnloal Engineer responsible for quallty assurance materials testing required for infra-
<br />structure Improvements for the now station, The project site involved approximately 4.75 acres to provide at
<br />Metrolink commuter rail station that meets current and future transit demand and ADA requirements. The
<br />i project goal fostered train ridership growth In the region, The station was planned as part of a key compo-
<br />nent of transit -oriented devefopment envisioned In the Westgate Specific Plan for the City of Placentia, The
<br />project Improvements Included street, railroad track, and pedestrian Improvements; rail platforms; and light-
<br />ing, signing and striping of four parking facilities for 425 vehicles,
<br />Orange Line Extension, Brutoco Engineering & Construction, InoJLos Angeles County Metropolitan
<br />Transportation Authority, Los Angeles, California. Geotechnical Engineer responsible for quality assur-
<br />ance materials testing required for the design/build of the MCL extension from the Chatsworth Station to
<br />Canoga Station In the San Fernando Valley along Canoga Avenue, Willdan prepared plans, specifications,
<br />and estimate for street widening, raised landscaped medians, irrigation system, ADA access curb ramps,
<br />r bicycle paths, park-and-ride and parking lot facilities, traffic signal modifloations, communication conduits,
<br />and signing and striping.
<br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Geotechnical Engineer
<br />responsible for quality assurance materials testing required for the corridor Improvements from Alameda
<br />Street to Hunt Avenue. The Improvements involved roadway widening from four to six lanes; pavement re-
<br />habilitation; landscape and hardscape medians; median lighting; sidewalk, curb and gutter, and driveway
<br />i approach reconstruction; ADA -compliant ramps; parkway trees; artistic elements, corridor entrance monu-
<br />ment; bus shelter and bus turnouts; and traffic signal modifications. Services provided Included civil, traffic,
<br />pavement, and drainage engineering; landscape architecture, survey and right-of-way engineering; and utib
<br />I
<br />ity relocation.
<br />i
<br />.- "LZ Proposal for On -Call Engineering 11
<br />�h � Comprehensive. Innovative, Trusted. Rpp No T 083
<br />
|