--City of.Sa0a Ana
<br />David Knell, PLS
<br />Survey and Right -of -Way Engineering Task Leader.
<br />e
<br />Profile summary
<br />Education: BS, Cartography, Boston University, Boston
<br />Civil Engineering and Land Surveying Classes, California State University, Long Beach_
<br />Registration- Land Surveyor, California No, 6301
<br />Affiliations. California Land Surveyors Association
<br />i
<br />Southern California Experts & Consultants
<br />'J,
<br />Experience; 41 Years
<br />Mr. David Knell has been involved in preparing and checking numerous parcel maps and tract maps, ALTA
<br />-
<br />surveys, reoords-of-survey, lot line adjustments, parcel map waivers, ceetifloates of compliance, and bound-
<br />ary determination. He is responsible for preparing legal descriptions and sketohes for a wide range of ease-
<br />ments Involving utilities, air space reservations, and construction projects. Mr. Knell works with major utlll-
<br />4,
<br />ties and title companies in determining easements and correcting defective legal descriptions. His experi.
<br />i
<br />ence includes supervising field crews, overseeing an office staff dealing with various survey projects, and
<br />r.1
<br />extensive experience with local, state, and federal agencies.
<br />L
<br />Relevant project Experience
<br />tri
<br />Emerald Bay Main Gate Safety improvements, Emerald Bay Service District, Laguna Beach, Callfol-
<br />nia. Survey and Right -of -Way Engineering Task Leader responsible for oversight of all office and field sur-,
<br />veyearvices and preparing necessary right-of-way engineering documentation. Wilidan provided civil and
<br />�d
<br />traffic engineering design and other appurtenant services for safety improvements at the main gate en-
<br />f' ti
<br />trance, Improvements Involved road widening, guardhouse relocation and reconstruction; grading to accom-
<br />b,
<br />ramps, and retaining and monument walls; widening the right4urn pocket and installing a median; and In- 1-1
<br />stalling street striping and signage within Caltrans' right-of-way. w
<br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Survey Task Leader re-
<br />sponsible for providing and overseeing all mapping and right-of-way engineering required for the corridor
<br />Improvements from Alameda Street to Hunt Avenue. The Improvements involved roadway widening from
<br />e
<br />four to six lanes; pavement rehabilitation; landscape and hardscape medians; median lighting; sidewalk,
<br />curb and gutter, and driveway approach reconstruction; ADA -compliant ramps; parkway trees; artiatto ele-
<br />ments, corridor entrance monument; bus shelter and bus turnouts; and traffic signal modiflcatlons. Services
<br />provided Included civil, traffic, pavement, and drainage engineering; landscape architecture, survey and
<br />right-of-way engineering; and utility relocation.
<br />i
<br />Orange Line Extension, Brutoco Engineering & Construction, Inc./Los Angeles County Metropolitan
<br />'J,
<br />Transportation Authority, Los Angeles, California. Survey Task Leader responsible for providing and
<br />overseeing all mapping and right-of-way engineering required for the design/bulld of the MOL extension
<br />from the Chatsworth Station to Canoga Station In the San Fernando Valley along Canoga Avenue. Willden
<br />prepared pians, specifications, and estimate for street widening, raised landscaped medians; Irrigation sys-
<br />tem, ADA access curb ramps, bicycle paths, park-and-ride and parking lot facilities, traffic signal modifioa-
<br />flons, communication conduits, and signing and striping.
<br />i
<br />Los Alamitos Boulevard Median Improvements, City of Los Alamitos, California, Survey Task Leader
<br />responsible for providing and overseeing all mapping and right-of-way engineering required for the Improve-
<br />' �
<br />ments between Cerritos Avenue and Katella Avenue. Improvements involved raised median, pavement de-
<br />tri
<br />lineation, landscape and Irrigation Improvements, street lighting and traffic signal Improvements at Intersec-
<br />tions with Fiorista Street and Sausalito Street. There was also minor traffic signal modification at intersec-
<br />tions with Katella Avenue and Cerritos Avenue,
<br />�d
<br />'A
<br />Wi
<br />Comprehenslye. Innovative. trusted, Proposal for On -Call Engineering, 9-°
<br />RFP No. 17-083 41
<br />
|