Laserfiche WebLink
--City of.Sa0a Ana <br />David Knell, PLS <br />Survey and Right -of -Way Engineering Task Leader. <br />e <br />Profile summary <br />Education: BS, Cartography, Boston University, Boston <br />Civil Engineering and Land Surveying Classes, California State University, Long Beach_ <br />Registration- Land Surveyor, California No, 6301 <br />Affiliations. California Land Surveyors Association <br />i <br />Southern California Experts & Consultants <br />'J, <br />Experience; 41 Years <br />Mr. David Knell has been involved in preparing and checking numerous parcel maps and tract maps, ALTA <br />- <br />surveys, reoords-of-survey, lot line adjustments, parcel map waivers, ceetifloates of compliance, and bound- <br />ary determination. He is responsible for preparing legal descriptions and sketohes for a wide range of ease- <br />ments Involving utilities, air space reservations, and construction projects. Mr. Knell works with major utlll- <br />4, <br />ties and title companies in determining easements and correcting defective legal descriptions. His experi. <br />i <br />ence includes supervising field crews, overseeing an office staff dealing with various survey projects, and <br />r.1 <br />extensive experience with local, state, and federal agencies. <br />L <br />Relevant project Experience <br />tri <br />Emerald Bay Main Gate Safety improvements, Emerald Bay Service District, Laguna Beach, Callfol- <br />nia. Survey and Right -of -Way Engineering Task Leader responsible for oversight of all office and field sur-, <br />veyearvices and preparing necessary right-of-way engineering documentation. Wilidan provided civil and <br />�d <br />traffic engineering design and other appurtenant services for safety improvements at the main gate en- <br />f' ti <br />trance, Improvements Involved road widening, guardhouse relocation and reconstruction; grading to accom- <br />b, <br />ramps, and retaining and monument walls; widening the right4urn pocket and installing a median; and In- 1-1 <br />stalling street striping and signage within Caltrans' right-of-way. w <br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Survey Task Leader re- <br />sponsible for providing and overseeing all mapping and right-of-way engineering required for the corridor <br />Improvements from Alameda Street to Hunt Avenue. The Improvements involved roadway widening from <br />e <br />four to six lanes; pavement rehabilitation; landscape and hardscape medians; median lighting; sidewalk, <br />curb and gutter, and driveway approach reconstruction; ADA -compliant ramps; parkway trees; artiatto ele- <br />ments, corridor entrance monument; bus shelter and bus turnouts; and traffic signal modiflcatlons. Services <br />provided Included civil, traffic, pavement, and drainage engineering; landscape architecture, survey and <br />right-of-way engineering; and utility relocation. <br />i <br />Orange Line Extension, Brutoco Engineering & Construction, Inc./Los Angeles County Metropolitan <br />'J, <br />Transportation Authority, Los Angeles, California. Survey Task Leader responsible for providing and <br />overseeing all mapping and right-of-way engineering required for the design/bulld of the MOL extension <br />from the Chatsworth Station to Canoga Station In the San Fernando Valley along Canoga Avenue. Willden <br />prepared pians, specifications, and estimate for street widening, raised landscaped medians; Irrigation sys- <br />tem, ADA access curb ramps, bicycle paths, park-and-ride and parking lot facilities, traffic signal modifioa- <br />flons, communication conduits, and signing and striping. <br />i <br />Los Alamitos Boulevard Median Improvements, City of Los Alamitos, California, Survey Task Leader <br />responsible for providing and overseeing all mapping and right-of-way engineering required for the Improve- <br />' � <br />ments between Cerritos Avenue and Katella Avenue. Improvements involved raised median, pavement de- <br />tri <br />lineation, landscape and Irrigation Improvements, street lighting and traffic signal Improvements at Intersec- <br />tions with Fiorista Street and Sausalito Street. There was also minor traffic signal modification at intersec- <br />tions with Katella Avenue and Cerritos Avenue, <br />�d <br />'A <br />Wi <br />Comprehenslye. Innovative. trusted, Proposal for On -Call Engineering, 9-° <br />RFP No. 17-083 41 <br />