Laserfiche WebLink
C!!y of Sante AnaWory <br />r' <br />John hidalgo, RLA <br />Landscape Architecture Task Leader <br />Profile Summary <br />Education; BS, Landscape Architecture, California State Polytechnic University, Pomona <br />p" <br />European Study Tour, California Polytechnio State University, School of Architecture, Pomona <br />., <br />Registration: Landscape Architect, California No. 35511 <br />Licensed Contractor, California C-27 No. 713813 <br />j <br />Affllfationsp American Society of Landscape Architects <br />California Parke and Recreation Society <br />�• <br />California Landscape Contractors Association <br />a• <br />Experience: 24 Years <br />, <br />Mr. John Hidalgo possesses in-depth expertise in landscape architecture design development, preparation c1 <br />of plans and specifications, plan reviews, and construction observation. Mr. Hidalgo is familiar with various Lj <br />local, state, and federal codes, regulations, procedures, and standards relating to construction, safety, park <br />and facility planning, and other landscape and Irrigatlon amenities. He has successfully completed projects <br />In compliance with these various standards. Mr. Hidalgo has experience representing project owners during <br />the plan review process, He possesses comprehensive experience In both fleld observation and construc- <br />tion, Mr. Hidalgo responsibilities Include managing park and street beautification design, low -Impact devel- F" <br />opments, plan reviews, and construction observation, <br />Relevant Project Experience <br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Landscape Architecture <br />Task Leader responsible for providing and overseeing all landscape and Irrigation design required for the <br />expertise and knowledge In current landscape design Ideas for drought -adaptive landscape and Irrigation <br />r' <br />technology, The improvements involved roadway widening from four to six lanes; pavement rehabilitation; <br />landscape and hardsoape medians; median lighting; sidewalk, curb and gutter, and driveway approach re- <br />construction; ADA.00mpllant ramps; parkway trees; artistic elements, oorridor entrance monument; bus <br />shelter and bus turnouts; and traffic signal modifications. Services provided included civil, traffic, pavement, <br />and drainage engineering; landscape architecture, survey and right-of-way engineering; and utility reloca- <br />Li <br />tion. <br />Orange Line Extension, Brutoco Engineering & Construction, Inc./Los Angeles County Metropolitan <br />j <br />Transportation Authority, Los Angeles, California. Landscape Architecture Task Leader responsible for <br />providing and overseeing all landscapq and irrigation design required for the deslgn/bulld of the MOL exten- <br />�• <br />slon from the Chatsworth Station to Canoga Station in the San Fernando Valley along Canoga Avenue, Per- <br />a• <br />formance of these responsibilities required expertise and knowledge In working with the City of Los Angeles <br />and the Metropolitan Transportation Authority guidelines and procedures. Willdan prepared plans, specifics- <br />„q <br />tions, and estimate for street widening, raised landscaped medians, Irrigation system, ADA access our b <br />ramps, bicycle paths, park-and-ride and parking lot facilities, traffic signal modifications, communication <br />J <br />conduits, and signing and striping, <br />Los Alamitos Boulevard Median Improvements, City of Los Alamitos, California. Landscape Architso- <br />..h <br />4 <br />ture Task Leader responsible for providing and overseeing all landscape and Irrigatlon design — along with <br />Illustrative graphic concept presentations to the City Council — required for the improvements between Card? <br />tos Avenue and Katella Avenue, Performance of these responsibilities required expertise and knowledge in <br />graphic design and photographic view simulations of before -and -after scenarios. Improvements involved <br />raised median, pavement delineation, landscape and irrigation improvements, street lighting and traffic sig- <br />v <br />nal improvements at Intersections with Florists Street and Sausalito Street, <br />irC:omprehensive•Innovative. Trusted. <br />ProposalforOrnCallEnglneeYing, <br />RrP No, 17.083 J <br />