ir^
<br />City of.Santa Ana .
<br />Salvador Lopez
<br />Environmental Task Leader„
<br />Profile Summary
<br />Education; BS, Urban and Reglonal Planning, California State Polytechnic University, Pomona
<br />ftperience; 18 Years
<br />7
<br />"
<br />Mr. Salvador Lopez has more than 18 years of planning experience that spans all aspects of planning, In. .
<br />7
<br />cluding current, advance, and environmental planning, as well as active transportation planning and housing
<br />and community development. He is highly experienced at managing muitl-dlsclplinary teams In the develop-
<br />,
<br />ment of policy and long-range planning documents for public agencies.
<br />Relevant Project Experience,
<br />Firestone Boulevard Capacity Enhancement, City of South Gate, California, Environmental Compli-
<br />ance Task Leader responsible for providing and overseeing all environmental services required for the corrl-
<br />{�
<br />dor Improvements from Alameda Street to Hunt Avenue, Performance of these responsibilities requires ex-
<br />1
<br />pertise and knowledge in City and County standards, policies, and procedures; general plan practices; and
<br />7
<br />NEPA/CEQA conformance, The Improvements involved roadway widening from four to six lansa; pavement'
<br />rehabilitation; landscape and hardscaps medians; median lighting; sidewalk, curb and gutter, and driveway
<br />"d
<br />approach reconstruction; ADA-oompllant ramps; parkway trees; artistic elements, corridor entrance moms.
<br />ment; bus shelter and bus turnouts; and traffic signal modifications. Services provided Included civil, traffic,
<br />pavement, and drainage engineering; landscape architecture, survey and right-of-way engineering; and util-
<br />J
<br />Ity relocation.
<br />Garfield Avenue Corridor Improvements, City of Paramount, California. Environmental Compliance
<br />Task Leader responsible for providing and overseeing all environmental services required for street Im-
<br />modate a third lane in each direction; street resurfacing; two concrete Intersections; concrete sidewalk, curb
<br />ri
<br />and gutter, and driveway approach reconstruction; catch basin construction; streetsoape Improvements for
<br />I-,
<br />raised landscaped medians and modifications to existing medians; two entry monument signs; and traffic
<br />signal modifications at nine locations along the Garfield Avenue corridor. Services included civil, traffic, and
<br />,
<br />drainage engineering; survey and mapping; utility relocation; landscape architecture; and pavement man.
<br />agement.
<br />Lakewood Boulevard Regional Corridor Capacity Enhancement, City of Lakewood. Environmental
<br />Compliance Task Leader responsible for providing and overseeing all environmental services required for
<br />complete street/green street improvements between the north City limits and Del Amo Boulevard. Perfor-
<br />mance of these responsibilitles requires expertise and knowledge In Clty and County standards, policies,
<br />7
<br />and procedures; general plan practices; NEPA/CEQA conformance; complete streets; sustainablllty plan-
<br />ning; and low -impact development standards. Improvements involved street widening and median Improve
<br />"d
<br />mants; Class II bike lanes in both directions; tum lanes; landscape planting and Irrigation; overhead dlstrlbu-
<br />tlon and transmission power undergrounding; sidewalk, curb and gutter, and driveway approach reconstruc-
<br />tlon; street resurfacing; catch basin construction; storm water quality improvements to comply with Green
<br />J
<br />Streets policy; bike lockers, bus shelter, and traffic signal modifications. Services provided'Includs civil, traf-
<br />fic, pavement, drainage, and geoteohnical engineering; landscape architecture, survey and right-of-way am
<br />gineering, and utility coordination and relocation.
<br />.n
<br />:,;J
<br />I
<br />, ' + Proposal for On•Osll Englneering, r,
<br />OOYnprehonalve, innovative. Yrusted, RFP No. V-083
<br />
|