Laserfiche WebLink
City of Santa Ana <br />Michael Bustos, PE, ENV, SP <br />Water and Sewer Engineer Construction Manager <br />Profile Summary <br />Education: BS, Civil Engineering (Magna Cum Lauds), California Polytechnic State University, San Luis <br />Obispo <br />Caltrans Resident Engineer Academy <br />Registration: Civil Engineer, California No. 73173 <br />Envision Sustainabllity Professional, Institute for Sustainable Infrastructure <br />Afl llatlons: Clty Traffic Engineers <br />American Public Works Association <br />Institute of Transportation Engineers <br />Experience: 16 Years <br />Mr. Michael D, Bustos is responsible for design and construction management of projects such as road. <br />way reconstructions, drainage improvements, pipelines, pavement rehabilitation, street Improvements, and <br />I grading. Mr. Buatos has served as resident engineer for over a dozen federally- and state -funded projects <br />over the last five years. He has gained valuable experience In on-site construction management, offsite <br />construction administration, Inspection, design, and plan checking during his 13 years with Willdan. <br />Relevant Project Experience <br />Trunk Water Replacement, Morongo Band of Mission Indians, Banning, California. Project Engl- <br />neer/Construction Manager. Engineer of Record responsible for preparation of plans, specifications, and <br />estimate for construction of 18 -Inch water main on Porters, Morongo, and Martin Roads, Mr. Bustos also <br />served as Construction Manager during construction, and was responsible for contract administration, mate• <br />rials testing, and public works observation, <br />Firestone/Atlantlo design, City of South Gate, California. Reclaimed Water Design Engineer, Mr, <br />Bustos provided construction phase design support for installation of a 10 -Inch reclaimed water line on Fire- <br />stone Blvd. The project was constructed by the City and maintained by Central Basin Municipal Water Dis- <br />triot, Willdan provided surveying, civil engineering, geotechnical engineering, and utility coordination ser- <br />vices for street improvements on Firestone Boulevard from Dorothy Avenue to Latta Avenue and on Atlantic <br />Avenue from Patata Street to Branyon Avenue. As part of our design services, Willdan provided final civil <br />plans, including street design, storm draln, sewer and water relocation, traffic signal modification and instal- <br />lation, signing and striping, street lighting, contract specifications, and engineer's estimate for widening both <br />Firestone Boulevard and Atlantic Avenue. in addition, Willdan prepared a project report and cost estimates, <br />Including aerial topography and street centerlines; roadway geometrics; hydrology study; sewer study; water <br />study; utility relocation concepts; geotechnical recommendations; turn pocket lengths; landscaping, <br />Rehabilitation of Well No. 25, City of South Gate, California. Project Engineer. Mr. Bustos assisted while <br />managing the hydrogeologlcal sub -consultant: Hopklns Groundwater Consultants, Inc. (Hopkins) In provid- <br />E Ing well rehabilitation consultation services to the City. The well had been out of service for three years due <br />to a sanding problem. When In operation, production from the lower half of the 1,300 feet deep well was <br />providing only 20 percent of the overall well production. Following Initial consultation, Mr. Bustos and Hop- <br />kins prepared a well condition assessment to allow the City to explore their rehabilitation options, then se- <br />lect a method that would possibly allow the City to regain production from -the perforated zones of the exist - <br />Ing casing. Mr. Bustos facilitated well condition assessment and Inspection services during well cleaning <br />and video survey (aided by Hopkins). The completed well review provided the City with an accurate as - <br />easement of the wall's current conditions and recommendations for rehabilitation, Following the well condi- <br />tions review, and at the request of the City, Mr. Bustos and Hopkins prepared specifications for the Clty's <br />r ; preferred rehabilitation method. <br />Comprehensive. ,usted� ProposalrorOn-Gall Engineering, 17 <br />I <br />LOA RP RFP No. ,17.083 <br />