Cit of Santa Ana <br />direction for improved vehicular Ingress and egress, The slope will be graded and recompacted to acoom- <br />modate the roadway widening — extending the top of the adjacent slope and extending the toe of the slope <br />by 28 feet into Swanson Park. <br />Placentia MetroLlnk Station Phases I and 11 <br />Orange County Transportation Authority <br />Client Contact: i.ora Cross, Prafact Manager <br />550 South Main Street <br />(714) 560.5768 <br />Orange, CA 92868 <br />Project Dates: 2012 to 2017 (design completed, • con <br />Wlhdan prepared plans, specifications, and estimates <br />struction ongoing) <br />Pr%ctTenm: Tyrone Peter, David Knell, <br />For a MetroLlnk commuter rail station in the Cit of <br />City <br />Placentia, The station Is located on tracks owned by <br />Rahimlan, John Hidalgo, Alexis Escobar, <br />axisMohEs <br />the BNSP Railway east of State Route 57 at the <br />Ross Khlabani, Ray Wellington, Kenneth <br />Krieger, Randy Shadowen, Bernardo <br />northeast corner of Melrose Street and Crowther Av- <br />Reyes, Susana Barrlentos, Bryan Ngu- <br />enue, The project site involved approximately 4.75 <br />yen, Sheila McCracken, Robert Burch, <br />acres to provide a MetroLlnk commuter rail station <br />Chris Stone <br />that meets current and future transit demand and ADA <br />requirements, The project Is expected to foster train <br />ridership growth In the region. The station was planned as part of a key component of transit -oriented devel- <br />opment envisioned in the Westgate Specific Plan for the City of Placentia. The project improvements in- <br />cluded street, railroad track, and pedestrian Improvements; rail platforms; and lighting, signing and striping <br />of four parking facilities for 425 vehicles, <br />Water Well Rehabilitation- Well No 25 <br />! City of South Gate Client ConteobArturo Cervantes, Public Works Director <br />8650 California Avenue (328) 5699512 <br />South pate, CA 90280 Project Dates: 2008.2010 <br />' The City of Southgate rehabilitated its Well No, 25 Project ream, Mike Bustos, Selene Midden <br />due to holes in the existing low carbon steel wire wrap screen, which has limited well production. The holes <br />in the wire wrap screen were in the lower 650' of the 1350' deep well, As a result, the production from the <br />lower 650' of Well No, 25 was only 20% of the overall well production, <br />The City desired to fill the lower 650' of the well with concrete slurry to ellminate the zones with holes in the <br />wire wrap screen. The City raquired a hydrogeologist to ravlew, evaluate, and assess the proposed rehabil- <br />Itation program, based on the Information provided by the City, including, but not limited to, well completion <br />reports, well geophysical logs, well Inspection videos, hydraulic efflclency tests, and water quality test re- <br />sults. <br />After review and assessment of the existing well conditions, a summary report was prepared and provided <br />to the City discussing the risks and benefits associated with alternative rehabilitation procedures. Plans and <br />j specifications for well rehabilitation were prepared based on the City's dirsotion resulting from review of the <br />hydrogeologist's summary report. After well rehabilitation was completed, a test pump was conducted to <br />determine the maximum output of the well. <br />Proposal for On -Call Engineering, 27 <br />Compehenslve.Innovative.7rusted. <br />_j •� � RFP No, 17A83 <br />