Laserfiche WebLink
Utidty Services — Our project experience offers many projects with sewer, water, and storm drain design. We have also provided dry utilities <br />coordination. We are currentlyworking on projects that install and/or retrofit utilities. <br />Roadway Design Specialists — Our project too m has provided roadway design services for urban, rural, primary, secondary, and major roadways, We <br />are equipped to address all Option B aspects Including; <br />* Conceptual Design Alternatives + Storm Water Management <br />0 Utility mlocations/adjustments * Rehabilitation <br />Parkway Landscaping Final Design ME packages <br />Sound Wall and Retaining Walls * Bike Path <br />Drainage <br />TrioNo Engineering --We offer complete traffic engineering services. HZ has completed hundreds of traffic engineering projects, Our traffic <br />engineering staff are experts In all aspects of traffic engineering and operations. This includes; <br />• Signing and Striping ± Bicycle Safely <br />• Temporary Traffic Control • Parking, access, and circulation <br />School zonas • Traffic Calming Plans <br />Pedestrian Safety <br />TratNe Cmrlrol —Option B would include signing and striping for proposed Improvements, The signing and striping would eonsiderthe proposed <br />bike path, Both project will require temporary traffic control during construction. Temporary traffic control could be deferred to construction phase <br />or it could be included with construction documents. <br />Nydrelogyandhfydraulles Analysis— Option B would include a hydrology and hydraulics analysis that assess drainage improvements. <br />Water 4'uallty Compliance <br />1 WQMP-- In accordance with MS4 Permit Guidelines <br />r SWPPP - Prepares PRDs In accordance with the requirements set forth In the NPOES General Permit for Storm Water Discharges Associated with <br />Construction and Land Disturbance Activities. The SWPPP may also be deferred to the construction phase. <br />Geotochnical Recommendations—Our consultant will provide the required analysis to determine the street section thickness, sub -surface soils <br />classification and condition, evaluate soil properties, provide geotechnical parameters, trench stability requirements, and backfill recommendations. <br />We will coordinate with the City to make sure quality and durability are not compromised. <br />.Estimates— HZ will generate quantity takeoffs and an opinion of probable construction cost for proposed project improvements, Cost estimates <br />shall Include construction, engineering, inspection, administration, right-of-way, and contingency. The estimate shall tie the unit price to a cost <br />index and provide a format that is easily updated or revised, Bid prices from recent city project shall be roviswed to verify unit prices. <br />specifications—HZ will utilizethe City of Santa Ana standard bid specifications and edit them to fit both project requirements. This will include a <br />bid sheet showing the anticlpated project quantities. <br />Construction Admintstrallon Services <br />} t, Bid Support—Assist City with bid documents, attend bid meeting, and provide bid support. <br />i 2, Construction Support—Attend pre -construction meeting, provide ongoing support, and attend construction meetings as required, <br />3. Project Close Out Utilize contractor redlines for as -built plans to prepare record plans in Micro -Station V81 CADD and pdf format. <br />Client Satisfaction — Huitt-Zollers achieves client satisfaction by dedicating a concise and experience team that will deliver on schedule and <br />within budget, A key component is effective communication that begins with listening to the City's ideas, concerns, nod goals. Our status reports <br />summarize discussions, provide follow up action items, and set dates for follow up items. We will create a project work plan that includes that <br />Includes all critical tasks to deliver a design that meats expectations, We will integrate ourselves via meetings, smalls, and conversations so that <br />we become an extension of the City's vision for the project. We will attend community meeting to help gain acceptance. <br />H 11 t l! 1.JLIARS City of Santa Are Civil Engineering Services: RIP 17-083 0 <br />