Laserfiche WebLink
" We will design the project In accordance with your schedule. This begins with development of a detailed schedule that includes critical <br />path, agency review times, and milestones. Progress will be reviewed during our design meetings. <br />u We will design a project that is within your budget. We will develop a project budget that includes contingency, probable construction cost, <br />and consultant fees. The probable construction cost will be prepared using current unit prices and submitted for review. <br />» We strive to minimize non -client initiated change orders during construction, Our QA/QC procedure implements a constructability <br />reviewer. It helps us foresee and resolve potential issues before the bidding phase. <br />Our PM will establish the framework and ensure that we capture your expectations for quality prior to publishing our plan. <br />Existing Utility Inventory- Every project presents its own special design challenges. The most frequent challenge related to existing utilities <br />we would expect in the City of Santa Ana. Is that improvement to utilities located in developed areas will generally affect or be affected by other <br />utilities. Through experience we have learned that existing records may be non-existent, inaccurate, or lack information. This is why all projects <br />require an effective existing utility locating approach. A precise utility inventory will: <br />w Equal a high quality design <br />Avoid conflicts during construction <br />u Prevent utility Interruptions <br />n Promote public safety <br />n Avoid construction change orders <br />N Prevent construction delays <br />With HZ, utilities will be located, verified, and compiled Into a VIII CADD file using a "Pour Tier Approach." <br />Environmental Assessment—Our assumption for both project options is that the work limits are within areas with existing infrastructure, Small <br />Improvements of this nature typically qualify for environmental exclusions but if the work requires a negative declaration. Our fust step would be to <br />research existing environmental filing(s), There after our consultant and civil team would assist the Cityof Santa Ana with supporting studies and <br />documentation to comply with CEQA and/or NEPA. We have assumed exclusions have been filed for both options A and a. <br />Topography- HZ is leading the industry with fixed wing aerial drone surveying. The new technology has a perfect platform in topography. With <br />on board RTK the data will generate an accuracy that matches conventional aerial photography but a picture quality that is unmatched, it allows <br />for quicker delivery and data control at a competitive fee. The data would be supplemented with afield survey(s) and tied to the most appropriate <br />datum, HZ will acquire necessary permits to perform aerial surveys via drones. Our survey department would also provide legal descriptions, it <br />required. Providing plans, specifications, and estimates (PS&E) for engineering projects Is the backbone of our Irvine branch. We are familiar with <br />local, state, and federal codes and regulations. This ensures that the design is in conformance with established guidelines. We are also experience <br />with preparation of special provisions. We have been serving Southern California for over 30 years this Includes projects with the City of Santa Ana. <br />We are familiar with the City's criteria for acceptance of plans. <br />Encroachment—Potential encroachments would be identified in the proposal stage. The work to coordinate, design, provide temporary easements, <br />etc. would be Included in the fee proposal. Our goal during design is to make every attempt possible to avoid impact to adjacent properties but it <br />Is not always possible. With options A and B we have assumed that all work will fall within City controlled property and that encroachment is not <br />necessary. <br />Water Well Expertise — Our proposed project team has a history of successfully delivering water well design services. Our Bakersfield National <br />Cemetery Project constructed a water well for domestic and irrigation use. Our proposed PM, Mr, Hernandez, rehabilitated several water wells that <br />were used for construction water. The some water wells were later used to teed a cooling system for the Mojave Solar Project. <br />HUITT-A)LlARS City of Santa Ana Civil Engineering Services: RFP 17-083 0 <br />