My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:33:41 PM
Creation date
7/20/2018 12:19:13 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS
Contract #
A-2018-159-02
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
6/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Huitt-Zollars was retained by Orange County Public Works to prepare Letter of Design <br />Recommendations (LODR) and final construction plans, specifications and estimates <br />for the improvement of the Oso Parkway I Antonio Parkway intersection in South Orange <br />County. The $2 million project's purpose was to improve the capacity of this intersection <br />to accommodate Increased traffic resulting from continued new residential development <br />throughout the region. Capacity improvements at the intersection were as follows: <br />Antonio Parkway: Addition of a fourth southbound thru lane and a third northbound <br />left -turn lane onto Oso Parkway <br />Oso Parkway, Addition of a fourth eastbound thru lane <br />• • t. • M i ♦. 4 <br />RELEVANT DESIGN COMPONENTS: <br />• Street Improvements <br />Sewer, Domestic Water <br />• Reclaimed Water <br /># Storm Drain <br />• Flood control <br />• Mulitple Parking Lots <br />Landscaping <br />• Water4uatity <br />Vehicular&DisahledA <br />Oxnard Village is an approximately 60 -acre privately funded re development project <br />located at the westerly gateway to the City of Oxnard, along the 101 Freeway. The <br />under-utilized site contained 1950's era motel, mobile home park, retaiikommercial <br />and light manufacturing uses. This mixed use project will ultimately include 1,500 <br />residential units with row -houses, podium stacked flats, live -work units and luxuryhigh <br />rise condominiums and luxury hotels. Four parking lots have already been designed <br />which included aesthetic, decorative lighting, water quality, space, enhanced paving, <br />vehicular, pedestrian and disabled access, as well as drainage challenges. In each <br />case, both a functional and aesthetically pleasing built environment resulted. The <br />project is ongoing and will continue development while serving the City of Oxnard for <br />many decades into the future. <br />City of Santa Ana Civil Engineering Services: RFP 17-083 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.