Laserfiche WebLink
Huitt-Zollars was retained by Orange County Public Works to prepare Letter of Design <br />Recommendations (LODR) and final construction plans, specifications and estimates <br />for the improvement of the Oso Parkway I Antonio Parkway intersection in South Orange <br />County. The $2 million project's purpose was to improve the capacity of this intersection <br />to accommodate Increased traffic resulting from continued new residential development <br />throughout the region. Capacity improvements at the intersection were as follows: <br />Antonio Parkway: Addition of a fourth southbound thru lane and a third northbound <br />left -turn lane onto Oso Parkway <br />Oso Parkway, Addition of a fourth eastbound thru lane <br />• • t. • M i ♦. 4 <br />RELEVANT DESIGN COMPONENTS: <br />• Street Improvements <br />Sewer, Domestic Water <br />• Reclaimed Water <br /># Storm Drain <br />• Flood control <br />• Mulitple Parking Lots <br />Landscaping <br />• Water4uatity <br />Vehicular&DisahledA <br />Oxnard Village is an approximately 60 -acre privately funded re development project <br />located at the westerly gateway to the City of Oxnard, along the 101 Freeway. The <br />under-utilized site contained 1950's era motel, mobile home park, retaiikommercial <br />and light manufacturing uses. This mixed use project will ultimately include 1,500 <br />residential units with row -houses, podium stacked flats, live -work units and luxuryhigh <br />rise condominiums and luxury hotels. Four parking lots have already been designed <br />which included aesthetic, decorative lighting, water quality, space, enhanced paving, <br />vehicular, pedestrian and disabled access, as well as drainage challenges. In each <br />case, both a functional and aesthetically pleasing built environment resulted. The <br />project is ongoing and will continue development while serving the City of Oxnard for <br />many decades into the future. <br />City of Santa Ana Civil Engineering Services: RFP 17-083 13 <br />