My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:33:41 PM
Creation date
7/20/2018 12:19:13 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS
Contract #
A-2018-159-02
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
6/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Huitt-Zollars was responsible for the Topographic Survey for <br />that portion of Warner Avenue from westerly of Main Street to <br />easterly of Oak Avenue. Work included establishment of horizontal <br />control based on the centerline of Warner Avenue and the <br />establishment of vertical control; tying out the existing centerline <br />monumentation prior to construction and the preparation of Pre - <br />Construction Corner Records to be used during the construction <br />phases of the project by surveyors doing boundary work in the <br />area and for replacement of the monuments that were destroyed <br />during construction; setting and control of aerial targets and <br />photo ID points; flight, photography, and compilation of the aerial <br />topographic mapping; cross-section survey at 25 foot intervals <br />and a detailed design survey of all existing improvements from <br />R/W line to R/W line; and the preparation of a Topographic Map <br />showing the results of the work. <br />• Topographic Surmy <br />t <br />Nuitt-Zollars prepared the design of approximately 6,000 of 12" HDPE highline for recycled watertoassist theWaterdistrict in the transportation <br />of recycled water through the Santa Margarita Water District. Huiit-Zollars also assisted the Santa Margarita Water district in the design and <br />construction of a booster pump station to boost the pressure of the recycled water line through multiple pressure zones. <br />Additionally, Huitt-Zollars worked with Santa Margarita Water District to prepare multiple details to switch pipe materials and underground <br />the highline into a casing and create a crossing of a secondary arterial highway. The design was completed to allow for the maintenance of <br />the pipe without disrupting traffic on the highway. <br />RELEVANT DESIGN COMPONENTS: <br />• Survey <br />• Engineering Estimates <br />• Water Improvements <br />HUITfZJUARS <br />City of Santa Ana Civil Engineering Services: RFP 17-083 14 ., <br />
The URL can be used to link to this page
Your browser does not support the video tag.