Laserfiche WebLink
Sub-1#sk 17 Ary UNbtks — Undergrounding exlstlog powerlines Is possible If SCE accepts proposed switch locations. As described in the <br />approach coordination with SCE would occur in two phases, Our current scope Is limited to street design. HZ will coordinate with third party <br />purveyors to find feasible alignments for dry utility. The proposed alignment would be incorporated Into a conflict exhibit for evaluation. The <br />coordination is limited to the street improvement design period. <br />Sub -Task J.0Speclficallons— HZ will utilize City of Santa Ana standard bid specifications and%or the latest edition of the Standard Specifications <br />for Public Works Construction and edit them to fit the project requirements. <br />Sub-laskl0 Estimates ofProbable Gast— HZ will prepare estimates of probable cost forthe proposed Improvements. <br />Sub-rask11OMANY Plans - HZ wlII prepare utility plans this includes an option for potholes to Investigate existing utilly size and depth. Furthar <br />Investigation will be necessary where record information is unreliable and thought to cause a conflict with proposed improvements. Existing <br />manholes will be dipped where possible to verify inverts and pipe size. Notices will be cont to impacted utility companies and every effort will be <br />made to resolve conflicts priorto 60% submittal, <br />Sub-lask).11 Disposition Plans— Removals are limited to infrastructure within project limits <br />Suh-lask112 Mar Wall DebabiRtatlon Plan <br />Sub-laskJ. 12Of1s1to Improvement Plans- Excluded <br />Option A: Typical Street Improvement set will Include: <br />1. Title Sheet <br />2, Index Sheet <br />3, Disposition Plan <br />4. Street Plans (If Required) <br />5. Utility Improvement Plans (2 sheets) <br />6. Water Well Rehabilitation Plan <br />7, Details and typical Cross Sections <br />TASK K: Construction Administration Services (Optional) <br />Option U: Typical Street Improvement set wall include: <br />1. <br />Title Shout <br />9, Signing & Striping Details <br />2, <br />Index Sheet <br />10, Sound Wall Plan - (3 sheets) <br />3, <br />Disposition Plan <br />11, Sound Wall Details <br />4. <br />Street Improvement Plans (5 <br />12. Streatlight Plan (3 sheets <br />sheets) <br />double stocked) <br />5. <br />Details & Typical Cross <br />13, Streetlight Details <br />Sections <br />14. Landscape & Irrigation Plan (3 <br />6. <br />Storm Drain Improvements — (2 <br />sheets -double stacked) <br />sheets) <br />15, Landscape & irrigation Details <br />7. <br />Drainage Details <br />8, <br />Signing & Striping Plans (3 <br />sheets -double stacked) <br />Soh�lask X I Did Support— HZ will be available to attend the pre-bid meeting, Our team will review contractor's RFis if requested by the City <br />duringtho biddyphoss� <br />Sob-lask12Coostrualion Support— HZ will participate in construction meetings if necessary. HZ will review su4raittals and shop drawings <br />required to support the construction contract, Reviews will be completed within 10 working days of receipt, Contractor charge orders will be <br />completed within two working days of receipt. HZ will be available as requested bythe Cityto resolve discrepancies in contract documents. HZ <br />will furnish necessary revisions to documents due to errors and/or omission at no cast. <br />Sub -cask R3 Record Drawings —The contractor shall provide as-hulK redlines, HZ will revise approved plans per contractor comments to <br />produce record drawings. <br />SoMask MProloot Close -Out- HZ will assist In the development of the project punch list as related to the construntion package prepared by <br />ourteam. <br />HUHT-ODLM City of Santa Ana Civil Engineering Services: RFP 17-08$ 18 <br />U <br />