My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:33:41 PM
Creation date
7/20/2018 12:19:13 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS
Contract #
A-2018-159-02
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
6/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 0: Aeoteahmical StudieslkeportsiBoring— Review existing geotechnical report and prepare a comprehensive gaotechnicaf investigation <br />Including adequate borings for proper design of proposed work. Obtain required permits to conduct,gootochnical Investigations and perform <br />applicable lab test to provide Information necessary for a comprehensive design, A draft copy of the geotechnical report will be provided for review <br />and comment. Traffic control in arcordencewith W.A,LC,H, Manual. <br />Sub -Task PoverrrentEvnivatien— Excluded but maybe required for Option B <br />Sud -Task ESA Phase ! — Deferred: Acquisition Services Task <br />Sub -Task k'SA Phase x— Deforrod: Acquisition Services Took, <br />TASK E; Traffic Studyiltaport— Excluded <br />r <br />TASK F: Environmental(CEQA)— pxclusiansforbothOptions. <br />TASK C: Right•of4sy Acquisition and Temporary Construction Easements (TCEs)— Right -of Way acquisition )a excludedrHZ will Incorporate the <br />preferred preciss alignment intothe VIS CADD riles. Plans will be evaluated and TCE's would be provided, if necessay. <br />i <br />TAS K I: Water Quallty Management P►an,fWQMP) <br />Sub -Task Ll — The design will ocsouht for the 50% raffle in MONO O MS4=Parmit, which requires tiaotment for 50%.df added or replaced <br />impervious areas. it will implement green street principles to the maximum extent prapticable. If the underlying tail dots not Infiltrate we <br />anticipate using the parkwayte provide bio -filtration. HZ will prepare a PrehmlharyWQMP at the 30% stage thatidentify potential locations for <br />LID BMPs and their interactions withAhe onsite storm droln network HZ will.develop tht Proliminary WOMP Into a Final WOMP consistent with <br />the County's Technicaf ,Duidance Manual to accompany the finatsubmittal. This will include on ahngmaer's estimate of probable costs inclusive <br />I of material, freight, and malnt rishoeforAheselected BMPs. <br />Sub -Task W00— Deferred: Construction Bid. Task <br />TASK J; Plans, Spechloations, and Estimates (PS&E) - HZ will adhere to city criteria, policies, procedure,; and standards, PS&E includes three <br />milestone deliverables—30%,f1D%, and Final. Each -milestone will commence after HZ has received review comments from the previous milestone <br />submittal. HZ will meet with.the City offer comments have been reviewed to resolve questions. All plan sheets will be prepared at 20 scale unless <br />otherwise approved and noted. <br />'r <br />r $uh-rook AI Weet improvemonts.- HZ will match the precise alignment of the constructed street, Plans will include record information <br />regarding utiIitles, obstructions, and appurtenantdate. <br />Sub-Taek.42lre[Nc Design <br />t StreetSignals— Excluded <br />Channeliration Plan & Details — Plans will be completed to meet California MUTCD standard, signage will be evaluated and updated for proposed <br />tone configuration, <br />Temporary Traffic Control Pians —Deferred: Construction Bid Task <br />Sub-Taskl$ Verm grata Design- Drainage improvement plans will be prepared at the different mllastones. Backbone storm drain profiles will <br />be provided along with the 30% submittal, Profiles for lateral storm drains and storm drain detail sheets will be provided at the 60% and final <br />submittals. <br />Sud-reskd.4 Wall Design— Design of masonry wall height as specified by sound report or City but not to exceed 12 foot <br />Sound Report—Provided by City <br />Sud-raskl.SStreatlighDng&,Electrical Duslga—Typically existing street lights are owned by SCE, If the proposed improvements relocate more <br />than three street lights the proposed lights will be owned by the City of Santa Ana, Street lighting design standards will be coordinated with the <br />City of Santa Ana prior to commencing the design. The design will be per City of Santa Ana lighting standards and considerotlon will be given <br />t. to salvaging the existing light fixtures. <br />Sud-laskJ.B landscapingand Irrigation Design— Conceptual landscape and irrigation plans will be prepared in conformance with City of Santa <br />Ana standards. Our landscape designers will work closely with ourenginsers to pian, design, and coordinate gateway features, public art, traffic, <br />and pedestrian lighting, signage, and site amenities. Our team will coordinate with the City to responsibly design landscape and irrigation <br />systems. Planting and irrigation will be mindful of water conservation standards, <br />a <br />MUl l EODLIL 1[ S City of Santa Ana Civil Engineering Services: RFP 17-083 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.