My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:33:41 PM
Creation date
7/20/2018 12:19:13 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS
Contract #
A-2018-159-02
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
6/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'i1 -i1 (r,{!inePr - IIriII Zoltan <br />Jeanette Guereca is a detail driven engineer with a variety of experience including five years of experience in <br />solid waste and civil engineering, seven months in land development, and two years intern experience with <br />public works road and sidewalk rehabilitation. Guereca has performed pre- and post -construction hydrology <br />analyses by creating hydrology maps and using the rational method. She also has experience conducting <br />hydraulic calculations to size existing and proposed open channels, pipes, and drainage structures. Guereca <br />has been responsible for creating mass grading as well as precise grading designs using advanced civil CAD <br />programs utilizing 3-D surfaces, sections, and profiles to maximize efficiency and productivity of CAD tools. <br />Jeannette also interned with the City of Santa Ana from 2006.2008. <br />RELEVANT PROJECT EXPERIENCE <br />La Pats Ave Gap Closure A Del Rio Extension —Orange County, San Clemente, and San Juan Capistrano, CA <br />Plaza San Clemente — San Clemente, CA <br />Oxnard Village - Oxnard, CA <br />Frank R. Bowerman Landfill— Irvine, CA <br />Tojiguas Partial Final Closure— Goleta, CA <br />Vandenberg Air Force Base — VandenhargAF8, CA <br />Newby Island — Milipitas, CA <br />Kfl(1,HAEL PHILLIPS, PE <br />ft.vd(ology 54 lllvdraulrr.- t'nurri ,:r h!uilt-Lollars <br />Michael Phillips has experience in many aspects of surface water management. He has performed studies, <br />calculations and produced reports on topics such as hydrology, hydraulics, hydromodification, water quality <br />management and BMP design. He Is also familiar with many surface water management software such as <br />HEC -HMS, HEC -RAS, FlowMaster, AES, WSPGW, HY-B and SMS TUFLOW. <br />RELEVANT PROJECT EXPERIENCE <br />The Westerly, 20 Flood Study for FEMA Flood Map Revision— Simi Valley, CA <br />Haven Avenue Storm Drain, 20 Modeling — Ontario, CA <br />Oxnard Village, Interior Drainage Study— Oxnard, CA <br />Hydraulic Report for Pine Avenue Extension — Chino, CA <br />VA Riverside National Cemetery Phase 5 Development — Riverside, CA <br />MR5 "Modena" Development— Rancho Mission Viejo, CA <br />HUFTTMLM City of Santa Ana Civil Engineering Services: RFP 17-083 <br />
The URL can be used to link to this page
Your browser does not support the video tag.