Laserfiche WebLink
CSG NOrOSAI. TO SAN TA ANi„ -, <br />MILE CNEPAOJEC�- - -.--- <br />Scope of Services & Schedule a <br />COMPLETE STREET <br />CSG has completed complete street engineering design for several agencies, These projects provide <br />accoanmodations for pedestrians, hicyclists, vehicles, anti Public transportation in a safe and efficient <br />manner. The selection of appropriate surface materiaals must cater to the primary users). Identifying <br />optimized dimensions based on right of wayrestnictions,'budget,, and multi -usability can dictate the design's <br />grading, edge treatments, vertical clearances, and clearing and grubbing requirements, For ADA compliance <br />the design will meet all requirements for tongitudinal and cross slopes, width and height clearances, and the <br />use of detectable warning surfaces at vehicular crossings. Our approach to drainage des#gn Includes analysis <br />of the drainage pattern and modifying the grading as needed, Implemen'tdtian of catch basins and hurled <br />pipe networks to connect to existing storm drain systems. CSG comprehensive design Includes all necessary, <br />signage; striping, lighting, and/or landscaping. providing usable and safe paths and/or tralis for communities <br />N an Important part of CSWs services, <br />street Improvernents <br />CSG staff includes complete streets and active transportation prroject <br />designers.with extensive experience on class 1, 48 and even -the new <br />class 4 bicycle facilitlgs. Some key project components include: <br />• Right of way <br />• Funding(foderalvs, local) <br />• Materials <br />• Shared use facilities <br />• Traffic Signal integration <br />• Signage and chonnelhation <br />• Sepparation (buffer) from vehicles -(both high speed vehicles, <br />and parked vehicles can present hazards) <br />• Crossing locations with vehicles <br />GENERAL PROJECT DESIGN OVERVIEW AND APPROACH <br />CSG has a thorough understanding of the various steps that are involved In delivering a successful bikeway <br />and streetscape project, as outlined in the table below: <br />CSG will week with City staff to deliver a successful, construction -ready project. Project <br />management and design development efforts will Include the following: <br />1. General Project • field investigation <br />Management and • Finalize design concept <br />Design • Project Meetings <br />Development • Preparation of reports and recommendations <br />• ),reparation of plans, specifications, and estimates (ps&E) <br />• Manage project schedule and budget <br />i Bidding/construction support <br />2, pavement our staff is experienced In a variety of street rehabilitation strategies, and will review the <br />following options for applicability on the Mlle one project: <br />