Laserfiche WebLink
CSG Pa0pn5ALTO SANTA ANA <br />MILE ONE PROncr <br />90°%u Plans and estimate <br />CSG will provide plans and an estimate of the selected option for each street segment, based on comments <br />received from the City and from project stakeholders at the first public meeting. <br />It is antieipoted:that ;plans will be prepared at V=40' scale, with two segments of approximately 1000 feet of <br />roadway per plan sheet. <br />Tine M submittal plans are expected to consist of the following sheets; <br />Task Aeliverablesr <br />• Two (2) 24"K.?rhard copies and three (3) half size hardcoples of the plans <br />• One (1) Co with digital copies of all documents in PDF and nativeformat <br />• Cut sheets Pr equipment/.appurtenances, as needed <br />• Dpcume)ttatlan Of Outreach with utilftY owners with facUltles to be adjusted to grade <br />• Prq)ectSchedukoUpdate <br />ok 30% Construction Cost Estimate <br />• TobleofCohtentsforTechnlcalSpeciflcotlons <br />60% Plans, $peel (I cati,ons, and Estlma.te <br />CSG will provide plans and an estimate at the 60% level, revised per comments received from the City and <br />project stakeholders on the 30% Plans and Estimate. The plans will provide sufficient detail to construct the <br />proposed improvements, itis anticipated that all major project Issues will be resolved prior this submittal <br />stage, following the results of the two public meetings and City review periods, <br />CSG will also provide technical specifications/special provisions. The special provisions will be prepared in CSI <br />format and in accordance with applicable City standards. <br />Tusk Delive'radlesi <br />• Two (2) 24"46" hard copies and four (4) half size hardcoples of the plans <br />• One (1) CD with digital coples of all documents in PDF and native format <br />• Technical ProvislonsJSpectfications In CS[format <br />• Project Schedule update <br />• 60% Construction Cost Estimate <br />• Responses to City'scomments on the30%submittal and redlines <br />