City Engineer I City of City of Half Moon Bay, CA
<br />Mr. Abbassl was responsible for complex and technical tasks related to capital
<br />Infrastructure, utilities, traffic studies and. management, land development and other
<br />publlc works�relatod projects and progrems ensuringcompilance with all codes and
<br />regulations. His work included managing consultants for storm drain and sewer master
<br />plans as welt as design consultants for the Capital Improvement Projects. Cinder hls
<br />supervision, the City developed a comprehensive and robust 5•yeor capital program with
<br />a budget of $85 million. It Included a $22 million new Net Zero and LEEtD certified library
<br />as well as $9.5 million Highway 1 "safety and Operational Improvements" projects. Mr.
<br />Abbassi assisted the City with its Solid Waste contract as well managing activities with the
<br />JPA for the Wastewater Treatment Facility and pumping plants throughout the City. He
<br />also represented the City of Half Boon Bay In county -wide efforts to study and resolve
<br />Sea Level Rise (SLR) related issues and protect the City's vulnerable assets.
<br />Peykan
<br />CSI
<br />Abbassi PE,LEEDAP '^
<br />Ot3N8UlTRNTa
<br />Principal Engineer Nftwoor
<br />LICENSES and
<br />Mr, Abbassi Is an experienced executive level leader for large programs in pubec Works,
<br />CERTiFICATIONS
<br />Transportation, Development and Municipal Engineering. Through creation of team
<br />Profossional Cull Engineer
<br />environment and project ownership atmosphere he achieved outcomes above and
<br />State ofcaiiforriia
<br />beyond the expected, performance levels. He consistently developed cohesive
<br />161996
<br />management teams, established and monitored short range and long-range goals,
<br />IIIA AP Cenifi ote,
<br />budgets, and schedules, Mr. Abbassi has worked with regulatory agencies such as Army
<br />United. Stales Green'Duikinp Council
<br />Corps of Engineers, California Coastal Commisston, arid'California IDoportmemof Fish and
<br />Project tlanagement certiGate,
<br />Game, and has angoged with development firms to reach common grounds.
<br />Dorm ofgngitairing,
<br />SAMPLE PROJECTS
<br />Ckf" aa"lot"
<br />Chief Development Officer I North County Transit District (NCTD)
<br />Certificate in EUqulve Negotiation,
<br />Me. Abbassi was responsible fordirecting and'.marragingthe activities of the Development
<br />Harriss Inshore
<br />Services {Division (DSD) comprised of Englneering,and Capital Programs,, Facility, Real
<br />Estate, Maintenance of Way Departments and Signals and systems including Positive Train.
<br />EDUCAT16N
<br />Control, The Engineering department performed the oversight of the work performed by
<br />NS (MI 41neering,
<br />SANDAL (sop Plego Assodatlon of Governments) on LQS9AN Corridor€apaolty
<br />University of SaUlitem Calitonna
<br />enhancement (double tracking the railroad right of way) and the replacement of 22
<br />DS rigrngineering,
<br />bridges In the 60 miles of right of way;
<br />UnivaskyofSO01IMMcalifomia
<br />private Development plan CheckingGroupl Voest Los Angeles District Office,
<br />City of Los Angeles, CA
<br />Me. Abbas$[ helped establish Public Works Improvement Requirements and Conditions for
<br />subdivision and Land Use projects,,these'included street, storm drain, sanitary sewer,
<br />grading, erosion control and review of Environmental Impact Report (EIR), preparation
<br />and review of construction bonds documents for improvements in conjunction with
<br />private development proje6ts, Led and directed the group responsible for the issuance of
<br />over 900 private development projects' plarrtheck permlts and construction permits with
<br />a total construction cost of $120M. Had oversight of the Mapping and Records Group;
<br />which Included -the record maps of the district and all the improvements, which were
<br />updated continuously, the public counter activities, such as house cormectioh locations,
<br />address verification, utili0as location, least description, and the Issuance of A -permits,
<br />Excavation permits, Utility permits, and Sewer connection permits.
<br />City Engineer I City of City of Half Moon Bay, CA
<br />Mr. Abbassl was responsible for complex and technical tasks related to capital
<br />Infrastructure, utilities, traffic studies and. management, land development and other
<br />publlc works�relatod projects and progrems ensuringcompilance with all codes and
<br />regulations. His work included managing consultants for storm drain and sewer master
<br />plans as welt as design consultants for the Capital Improvement Projects. Cinder hls
<br />supervision, the City developed a comprehensive and robust 5•yeor capital program with
<br />a budget of $85 million. It Included a $22 million new Net Zero and LEEtD certified library
<br />as well as $9.5 million Highway 1 "safety and Operational Improvements" projects. Mr.
<br />Abbassi assisted the City with its Solid Waste contract as well managing activities with the
<br />JPA for the Wastewater Treatment Facility and pumping plants throughout the City. He
<br />also represented the City of Half Boon Bay In county -wide efforts to study and resolve
<br />Sea Level Rise (SLR) related issues and protect the City's vulnerable assets.
<br />
|