Michael
<br />Fisher CSG
<br />PE,QSD/P
<br />Principal Engineer CONSULTANTS
<br />LICENSES and
<br />Mr. Fisher is a civil engineer with over 25 years of experience in civil/roadway design,
<br />CERTIFICATIONS
<br />drainage design, traffic engineering, specification writing, engineering report writing and
<br />Proftedinal civrl fuldneer
<br />project management, tie has managed teams of engineers, working to deliver over a
<br />State of Califamia
<br />dozen projects ranging In size from $$20,000 to $22,000,000 with project status ranging
<br />( LS6S30
<br />from project inlilardoh/feasipllity/study phase to approval/environmental phase to final
<br />Qualified SVP pevataper/P aghloner
<br />design and construction. Mr. Fisher has extensive experience working on roadway design,
<br />IS66S
<br />Including Intersectioh and median projects. His design work includes horizontal and
<br />vertical geometric layout, utility coordination, traffic signal deslgN.signing and striping
<br />EDUCATION
<br />design and drainage design. His projects have Incorporated current LID design practices
<br />Ilalidde of Winta, fivll tnglneoring,
<br />including blofiltration, infiltration, and detention basins.
<br />San Jose Is3te university
<br />jsanjest, ek
<br />REL.EVAINTEXPERIENCE
<br />PROPESSIO14AL
<br />SunoyyalePavementRehabilitationa0l7ICity of Sunnyvale, CA
<br />AFFILIATIONS
<br />Mr, Fisherserved as the Project Manager for thls annual street pavamant rehabilitation
<br />South pay TransforrAlins Ofiees assodieibn
<br />proj6et. The scope Involved the rehabilitation of 2 streets in the city of Sunnyvale; Work
<br />(Satoq Asst President
<br />included the design of grind and HMA overlay, digisuts, utility adjustments, curb ramps,
<br />Toastmasters International
<br />cbhOetestdaWalk, curb, gutter and driveway replacament,<and striping plans,
<br />dob:tl66U671
<br />Fair Oaks Blkewayand5treetscapeI City of Sunnyvale, CA
<br />Mr. Fisher served as the Project Manager for the design of Class 2 Bicycle Lanes on Fair
<br />Oaks Avenue between Old San Francisco Road to Evelyn Road, Woe Avenue to Arques.
<br />Avenue, and Wolfe Road to Ahwanae Avenue, Key project elements Included
<br />reconfiguring the roadway, roadway resurfacing, addition of green bike lanes,
<br />Modifications to the existing concrete median Islands, modification of parking, and
<br />Installation of related signage. Mr. fisher led public outreach meetings to keep the
<br />residents Informed of the project,
<br />First Street and City Alley Resurfacing Project I.City of Los Altos, CA
<br />Mr. Fisher served as the Project Manager for these two resurfacing projects, which
<br />Involve rehabilitation of 20 city alieyways as well as First Street between West Edith
<br />Avenue and State Street, He oversaw preparation of the:project PS&E package, Basis of
<br />Design Report, and coordinated with utility owners for adjustments of their facilities.
<br />JuniperoSerra atKing Boulevard Intersection Improvements ICIty of South s a n
<br />Francisco, CA
<br />Mr. Fisher served as the Project Manager for this bicycle and pedestrian friendly traffic
<br />signal upgrade project. The project goal was to Improve mobility for all modes, andbrings
<br />the intersection up to current standards for bicyclists, pedestrians, and ADA access.
<br />Project included preliminary design, community outreach, agency -coordination Including
<br />Caltrans, The project scope Included redesign of the existing medians and rlght•turo
<br />Islands to Improve intersection geometry and provide ADA compliance, replacement of
<br />the existing traffic signals located In the median with most arm signals to Improve
<br />visibility, addition of a speed feedback sign on southbound luniporo Serra, and extension
<br />of existing bike lanes along Junipero Serra Boulevard through the icing Drive intersection
<br />to improve bicycle safety.
<br />W. Edith and University Crosswalk improvements j City of Las A)tos, CA
<br />Mr, Fisher served as the Project Manager for the design of traffic calming elements to
<br />allow for safe visible crossing of Edith Avenue. The design also Included the Installation of
<br />crosswalk signs and In -ground warning lights.
<br />
|