Laserfiche WebLink
Michael <br />Fisher CSG <br />PE,QSD/P <br />Principal Engineer CONSULTANTS <br />LICENSES and <br />Mr. Fisher is a civil engineer with over 25 years of experience in civil/roadway design, <br />CERTIFICATIONS <br />drainage design, traffic engineering, specification writing, engineering report writing and <br />Proftedinal civrl fuldneer <br />project management, tie has managed teams of engineers, working to deliver over a <br />State of Califamia <br />dozen projects ranging In size from $$20,000 to $22,000,000 with project status ranging <br />( LS6S30 <br />from project inlilardoh/feasipllity/study phase to approval/environmental phase to final <br />Qualified SVP pevataper/P aghloner <br />design and construction. Mr. Fisher has extensive experience working on roadway design, <br />IS66S <br />Including Intersectioh and median projects. His design work includes horizontal and <br />vertical geometric layout, utility coordination, traffic signal deslgN.signing and striping <br />EDUCATION <br />design and drainage design. His projects have Incorporated current LID design practices <br />Ilalidde of Winta, fivll tnglneoring, <br />including blofiltration, infiltration, and detention basins. <br />San Jose Is3te university <br />jsanjest, ek <br />REL.EVAINTEXPERIENCE <br />PROPESSIO14AL <br />SunoyyalePavementRehabilitationa0l7ICity of Sunnyvale, CA <br />AFFILIATIONS <br />Mr, Fisherserved as the Project Manager for thls annual street pavamant rehabilitation <br />South pay TransforrAlins Ofiees assodieibn <br />proj6et. The scope Involved the rehabilitation of 2 streets in the city of Sunnyvale; Work <br />(Satoq Asst President <br />included the design of grind and HMA overlay, digisuts, utility adjustments, curb ramps, <br />Toastmasters International <br />cbhOetestdaWalk, curb, gutter and driveway replacament,<and striping plans, <br />dob:tl66U671 <br />Fair Oaks Blkewayand5treetscapeI City of Sunnyvale, CA <br />Mr. Fisher served as the Project Manager for the design of Class 2 Bicycle Lanes on Fair <br />Oaks Avenue between Old San Francisco Road to Evelyn Road, Woe Avenue to Arques. <br />Avenue, and Wolfe Road to Ahwanae Avenue, Key project elements Included <br />reconfiguring the roadway, roadway resurfacing, addition of green bike lanes, <br />Modifications to the existing concrete median Islands, modification of parking, and <br />Installation of related signage. Mr. fisher led public outreach meetings to keep the <br />residents Informed of the project, <br />First Street and City Alley Resurfacing Project I.City of Los Altos, CA <br />Mr. Fisher served as the Project Manager for these two resurfacing projects, which <br />Involve rehabilitation of 20 city alieyways as well as First Street between West Edith <br />Avenue and State Street, He oversaw preparation of the:project PS&E package, Basis of <br />Design Report, and coordinated with utility owners for adjustments of their facilities. <br />JuniperoSerra atKing Boulevard Intersection Improvements ICIty of South s a n <br />Francisco, CA <br />Mr. Fisher served as the Project Manager for this bicycle and pedestrian friendly traffic <br />signal upgrade project. The project goal was to Improve mobility for all modes, andbrings <br />the intersection up to current standards for bicyclists, pedestrians, and ADA access. <br />Project included preliminary design, community outreach, agency -coordination Including <br />Caltrans, The project scope Included redesign of the existing medians and rlght•turo <br />Islands to Improve intersection geometry and provide ADA compliance, replacement of <br />the existing traffic signals located In the median with most arm signals to Improve <br />visibility, addition of a speed feedback sign on southbound luniporo Serra, and extension <br />of existing bike lanes along Junipero Serra Boulevard through the icing Drive intersection <br />to improve bicycle safety. <br />W. Edith and University Crosswalk improvements j City of Las A)tos, CA <br />Mr, Fisher served as the Project Manager for the design of traffic calming elements to <br />allow for safe visible crossing of Edith Avenue. The design also Included the Installation of <br />crosswalk signs and In -ground warning lights. <br />