Amir
<br />Abdollahl CSG
<br />EIT CONSULTANTS
<br />Associate Engineer
<br />LICENSES and
<br />Mr. Abdoltahi has over three years of engineeringdesign and construction Inspection
<br />CERTIFICATES
<br />experience, His design background' includes a variety of public works projects involving
<br />Engineer in Training
<br />pavement rehabilitation, grading, drainage system Improvements, estimates, and
<br />State of California
<br />Standard Detail Rovistons. He Is knowledgeable in AutoCAD Civil 5D.
<br />RELEVANT EXPERIENCE
<br />EDUCATION
<br />Oa<halor atSsiBna;'Elnt F114414682016
<br />17 S.treetResurfacin g Project ( City of Stockton, CA
<br />&n Jose St&llarvm,ry
<br />Mr,, Abdoliaht served as a design engineer for the preparation of PS&E document for the
<br />San.pse, rA
<br />pavement rebabllitation project, This pavement rehabilitation project includes hot mix
<br />asphalt mill and fill repiacomertts, pavement base failure. repairs (dlgouts), bilcrosurfocing,
<br />PROFESSIONAL
<br />pavement patch and crack sealing, upgrade ADA -compliant ,milaramp, adjustment to
<br />AFFILIATIONS
<br />existing utility facilities and monwments to proposed finished grade, replacement of
<br />American Society of civil fngineerr (AU)
<br />nicistlnd traffic signal detector loops, trimming of tree roots and canopies, and installation
<br />Toastmasten international
<br />of pave mont markings and striping.
<br />Vitt 1`010r,Uucathn
<br />Various Streets & Roads Improvement Project 1..CIty of MIIIbraa, CA
<br />Mr. AbdollAhi served as a Design Engineer forthis pavement project which involved a major
<br />Cltyarteriai, Millbrae Avenue, and a -residential Street, Magnolle Avenue, The project also
<br />Included pavement coring sample testing, surveying, pavement recommendations report,
<br />traffic handling plans, ADA curb ramp upgrades, traffic signal repair and traffic detours.
<br />MeasureJand. L& Annual PavementRehabilltation2015(City ofOrin da, CA
<br />As Project Engineer, Mr, Abdollahl was responsible for the field assessments, utility
<br />company coordination, development of PS&E documents, and assisted in the preparation
<br />of addendums and bid supporf, The Measure 1 & L project rehabilitated local/residentlal
<br />roads with a PCI value less than 25.1he scope Included identifying various depth of full
<br />depth rehablfitatlon to rehabilitate 23 local roads and two collector roads within the city
<br />of Orinda.
<br />Millbrae Various Streets and Road Preservation City of Millbrae, CA
<br />Mr, Abdollahl assisted In preparing the PS&E design along with the Caltrans Field Review,
<br />Environmental Clearance, Encroachment Permit, Right of way Certification, and Caltrans
<br />E76 documents, The City bad an One Bay Area Grant (DRAG) funded project that required
<br />road pavemontto be rehabilitated along segments of Millbrae Avenue (From EI Camino
<br />Real to Old eayshore Highway) and Magnolia Avenue (Taylor Blvd to La Cruz Avenue),
<br />El Monte Road Preservation Project Town of Los Altos Hills, CA
<br />As Project Engineer, Mr. Abdollahl conducted a series of field assessments regarding
<br />pavement reconstruction limits, road and striped lane dimensions, concrete
<br />Improvements, and ADA compliance needs on projectthat spanned 1.5 miles. Amor also
<br />assisted with the f=ederal Grant Administration process and coordinated with the Caltram
<br />Local Assistance department for the entire span of the project, Developing the Field
<br />Review, Preliminary Environmental Study (PES), E-76 Authorization for Construction, and
<br />Encroachment Permit forms, Amlr was also able to perform quantity takeoffs for all
<br />streets to assist In the development of the engineer's estimate.
<br />Dairy Knolls Stair and Pathway Improvements Town of Tiburon, CA
<br />In this stair and pathway Improvement project, Mr. Abdollahl conducted a topographic
<br />survey to develop the plans and estimate for a pathway with a staircase that connected
<br />an after school daycare to an eIamantaryschool. During this process, Mr, Abdollahl was
<br />asked to design up to three different approaches with a recommended choice for the
<br />staircase and pathway.
<br />
|