Laserfiche WebLink
Amir <br />Abdollahl CSG <br />EIT CONSULTANTS <br />Associate Engineer <br />LICENSES and <br />Mr. Abdoltahi has over three years of engineeringdesign and construction Inspection <br />CERTIFICATES <br />experience, His design background' includes a variety of public works projects involving <br />Engineer in Training <br />pavement rehabilitation, grading, drainage system Improvements, estimates, and <br />State of California <br />Standard Detail Rovistons. He Is knowledgeable in AutoCAD Civil 5D. <br />RELEVANT EXPERIENCE <br />EDUCATION <br />Oa<halor atSsiBna;'Elnt F114414682016 <br />17 S.treetResurfacin g Project ( City of Stockton, CA <br />&n Jose St&llarvm,ry <br />Mr,, Abdoliaht served as a design engineer for the preparation of PS&E document for the <br />San.pse, rA <br />pavement rebabllitation project, This pavement rehabilitation project includes hot mix <br />asphalt mill and fill repiacomertts, pavement base failure. repairs (dlgouts), bilcrosurfocing, <br />PROFESSIONAL <br />pavement patch and crack sealing, upgrade ADA -compliant ,milaramp, adjustment to <br />AFFILIATIONS <br />existing utility facilities and monwments to proposed finished grade, replacement of <br />American Society of civil fngineerr (AU) <br />nicistlnd traffic signal detector loops, trimming of tree roots and canopies, and installation <br />Toastmasten international <br />of pave mont markings and striping. <br />Vitt 1`010r,Uucathn <br />Various Streets & Roads Improvement Project 1..CIty of MIIIbraa, CA <br />Mr. AbdollAhi served as a Design Engineer forthis pavement project which involved a major <br />Cltyarteriai, Millbrae Avenue, and a -residential Street, Magnolle Avenue, The project also <br />Included pavement coring sample testing, surveying, pavement recommendations report, <br />traffic handling plans, ADA curb ramp upgrades, traffic signal repair and traffic detours. <br />MeasureJand. L& Annual PavementRehabilltation2015(City ofOrin da, CA <br />As Project Engineer, Mr, Abdollahl was responsible for the field assessments, utility <br />company coordination, development of PS&E documents, and assisted in the preparation <br />of addendums and bid supporf, The Measure 1 & L project rehabilitated local/residentlal <br />roads with a PCI value less than 25.1he scope Included identifying various depth of full <br />depth rehablfitatlon to rehabilitate 23 local roads and two collector roads within the city <br />of Orinda. <br />Millbrae Various Streets and Road Preservation City of Millbrae, CA <br />Mr, Abdollahl assisted In preparing the PS&E design along with the Caltrans Field Review, <br />Environmental Clearance, Encroachment Permit, Right of way Certification, and Caltrans <br />E76 documents, The City bad an One Bay Area Grant (DRAG) funded project that required <br />road pavemontto be rehabilitated along segments of Millbrae Avenue (From EI Camino <br />Real to Old eayshore Highway) and Magnolia Avenue (Taylor Blvd to La Cruz Avenue), <br />El Monte Road Preservation Project Town of Los Altos Hills, CA <br />As Project Engineer, Mr. Abdollahl conducted a series of field assessments regarding <br />pavement reconstruction limits, road and striped lane dimensions, concrete <br />Improvements, and ADA compliance needs on projectthat spanned 1.5 miles. Amor also <br />assisted with the f=ederal Grant Administration process and coordinated with the Caltram <br />Local Assistance department for the entire span of the project, Developing the Field <br />Review, Preliminary Environmental Study (PES), E-76 Authorization for Construction, and <br />Encroachment Permit forms, Amlr was also able to perform quantity takeoffs for all <br />streets to assist In the development of the engineer's estimate. <br />Dairy Knolls Stair and Pathway Improvements Town of Tiburon, CA <br />In this stair and pathway Improvement project, Mr. Abdollahl conducted a topographic <br />survey to develop the plans and estimate for a pathway with a staircase that connected <br />an after school daycare to an eIamantaryschool. During this process, Mr, Abdollahl was <br />asked to design up to three different approaches with a recommended choice for the <br />staircase and pathway. <br />