Laserfiche WebLink
documentation and resource agency permitting, They are experienced In taking a projeetfrom conception to final <br />build>out, and provide environmental compliance services In support of.design and constructleg engineering: Qur <br />team's environmental services include: CEMNBPAdocumentation, groundwater protection, environmental audits, <br />environmental compliance, natural resource investigations, stdrmwater management, and more, <br />Storm Drain Design and Drainage Analysis. Klmley-Hour's drainage engineering services Include the design of <br />canals, detention basins, culvert crossings, water control structures, diversion structures; pump stations, and more. <br />Our engineers have been called upon by numerous public agencies and major agricultural, Industrial, and residential <br />developers to conduct preliminary studies and drainage consultation, prepare storm ator management plans, perform <br />watershed and floodphain analysis, prepare storm drain masterplans; and coordinate permit applications on their behalf. <br />Structural Analysis, Klmley-Horn's structural engineering team provides structural design arid analysis for a range of <br />major retaining structures, parking structures, roadway bridges, pedestrian bridges, to minor footings and foundations for <br />traffic signals, roadway slgn's, and storm drain structures Our structural engineers have extensive ex <br />pertencoworking <br />with public agencies and are familiar with routine plan check processes for multiple agencies. <br />Construction and Bid Support. Our team is equipped with, the latest construction managamentsystems and <br />applications available in the Industry. These toots are scalable and customizable to fitthe City's project needs and budget, <br />and to integrate with theCity's existing standards, From simple, time -tested forms andprocedures, to advanced <br />construction management and web -based systems, our team will deliver small and large projects on -lima and <br />under budget while keeping the City up to date on a "real-time" basis. In addition to our design'taam's experience <br />with design relevant topics, our construction phase personnel can attend pre -construction conferences and regular project <br />meetings, provide review and approval of submittals, as well as other activities necessary to achieve well -coordinated <br />construction projects of proposed Improvements. <br />Approach to Your On -Call <br />Through our five decades of experience working with on -call clients, we have learned valuable lessons that have helped <br />us create a unique approach to meeting our clients' needs, We understand the urgency associated with federally funded, <br />time sensitive, or public safety projects, and we are equipped to alloeate sufficient resources to meet deadlines and the <br />Clty's capital improvement program schedule. Our approach to your on -call tasks entails the following: <br />Project Management --Single Point of Contact: We have widespread expertise, and experience in all facets of <br />municipal projects, I(Imiey-Horn's project manager, Darren Adrian, P.S., will serve as the primary point of contact, and <br />will manage the team through the length of the contract, He has over 27 years of municipal engineering experience and <br />managed several projects, with various cities in California. His experience includes design, planning, and construction of <br />major roadways, transportation facilities, streatscape improvements, and utilities and Is knowledgeable of federal, state, <br />county, and municipal regulations, parren will oversee and review the engineering activities Including engineering design, <br />studies, Investigations, pser review, surveying, subconsultant review, and other related activities. He will be available to <br />City staff for a timely response to service requests, including questions about budgets, invoices, and schedules. <br />Before a project starts, Darren will conduct a project scoping meeting with all respective team members to brainstorm <br />the project Issues. Our team will conduct a project initiation meeting with the appropriate team members to coordinate <br />the project plan including milestones, deliverables, and current project events. Project coordination meetings will be <br />scheduled based on the project duration to make sure the project remains on track. <br />City of Santa Ana I TRoc77025. rr 9 Kim Lny ») Horn <br />