Laserfiche WebLink
Task 18: Potholing (Options A and 8) <br />.. <br />Our team will provide vacuum excavation potholes to positively identify utilities whore conflicts may exist. This task entails <br />potholes with a depth of up to 16 feet. Potholing Information will be used to identify potential conflicts with traffic signal <br />footings, new catch basins, wall footings, and water quality devices, <br />Ddllveradles: Potholing report <br />Task 99: Bid Phase Support (Options Aand B) <br />Kimsey -Horn will prpvlda support.during the Bid phase by rasponding in welting to Requests far information (RFj)l <br />clarifications; Our team will assist the City In the Issuance of addenda to the bid package which consists of making design <br />changes determined necessary to address clarifications: <br />Deiivarables: Responses la RFls,.deson revislon. <br />Task 20: Construction Support (Options A and B) <br />................. ..................... .................... .... ............. ............ ,......:...,................. ............,................................. <br />Ki rnleyHom will Assist the City during the construction phase by responding to the Contractop's RFIs, preparing addenda, <br />and providing clarifications, This task Includes reviewing the Contractors change orders and changed conditions In the <br />field. We will prepare record drawings by updating the approved design drawings based on one set of redline markups <br />provided by the Contractor or City staff. The purpose of the record drawings is to create a deliverable that will representthe <br />built condition for the'Clty's records, as recorded by the Contractor Independent verification is not Included in this scope. <br />Deliverables: Record Drawings: One hardcopy and one electronic (E'DF format and Mlcrosfation V81). <br />Schedule <br />The draft schedule on the following page contains the tasks outlined within the scope of work, as well as necessary <br />agency review periods. Relationships are assigned to each task representing a logical progression and allowing easy <br />Identification of tasks that could constrain the project. Note that task durations and agency review periods are realistic <br />based on our recent experience on similar projects. Our Intent is to review this draft target schedule with you at the <br />kickoff meeting for each project, make any desired adjustments, and track as a progress schedule during the project by <br />providing updates on a monthly basis, <br />3. FEE PROPOSAL <br />See separate sealed envelope for our hourly rate schedules, <br />City or Santa ano I TRO077025.17 10 Kimley * HOrn <br />