My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY-HORN (2)
Clerk
>
Contracts / Agreements
>
K
>
KIMLEY-HORN (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2021 4:01:57 PM
Creation date
7/20/2018 12:19:18 PM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY-HORN
Contract #
A-2018-160-01
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
4/1/2022
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br />Task 13: Storm Main Plans (ption <br />..............O...B)............... ... ........ <br />We will prepare storm drain plans showing proposed catch basins and lateral connections to the existing main tines,l <br />Catch basin sizing, Inlet dimensions, and laterals pips sizes will be determined as. part of Task 4 Potential conflicts with <br />s' <br />existing utilities will be shown on profiles with approximate location of utilities, per the utility agencies readily available <br />* <br />record drawings. Storm drain plans will be- pre pared at a scale of 1" = 2V horizontal and 1"= 4' vertical for profiles, <br />Detiverabies: A, 601, and Final Plana, elaCtronlc f7es In Micrbstatiprr VBtand )PDl= (fnal plans. wt)ibe sealed end <br />signed), and responses to previous reylew comments from the City, <br />k <br />Task 14: Street Light and Electrical flans (Option B) <br />;r <br />t <br />i(imisy Horn will prepare street light plans for the project Plans will Incorporate street lighting along both aides of the <br />street. We will conduct voltage drop calculations to datermine the wiring sizes. Part of this task will include coordination <br />f' <br />With Southern California Edison to determine haw and existing service points. We will provide a.phototnsfrto analysis to <br />determine requirsd Illumination for the corridor. <br />Dellverables, 00%, 60%, and Final Plans,, electronic files In Microstation 1/81 and PDF (final plans will be seated and <br />..t <br />signed), and responses to previous review comments from the City. <br />Task 75: Traffic Signal Plans (OptionB) <br />,n <br />.................... ...... ........................ . ......... ......... <br />1Ne wfli prepare traffic signal plans to incorpotato the new improvements along project area, Installation of closed-circuit <br />..d <br />television (CCTV), vldso detectioh, conduits, and cables or modification of e><isting communloation systems is anticipated <br />.t <br />within the project limits and will be shown on the traffic signal plans. Plans will show the connection to Soon signalized <br />k' k <br />Interseetioitinits the project limits. Pull box details and modification of conduit swoops for the signal Interconnect are <br />� <br />included, The traffic signal modifioation plan will be prepared In accordance with current City and Caltrans standards and <br />i <br />will be prepared at a scale of 1'. = 20'. <br />Dellverables; 20%, 60%, and Final Plans, electronic files in Mlorostation V81 and PDF (final plans will be sealed and <br />,u S <br />signed), and responses to previous review comments from the City. <br />s' <br />Task i6: Specifications (OptionsAand B) <br />Kimley Horn will prepare technical specifications based upon the boiler plate supplied by the City. Bid items will be <br />s <br />described as reasonably required in the General Provisions and will be included in the Contractor's bid list. References for <br />the technical provisions to the City's Standards. and Standard Specifications for Public Works Construction (Greenbook), <br />Caltrans, or outer appropriate specifications will be shown, <br />DeAverables: 80%, 60%, and Final Specifications, electronic files in PDF and word format (final speclHcatlons will be <br />sealed and signed), and responses to previous review comments from the City. <br />?, <br />Task IT Opinion of Probable Construction Cost (Options A and B) <br />.............. ....... ................................................. ..:................... ............ ....... .... ... ...... ............. ............. ............. <br />! <br />p <br />KlmleyHom will prepare an Opinlon.of Probable Construction Costs (Eatimata) based on quantities, for comparison to <br />project budget and assist during the Contractor's bidding process. Unit prices will be derived from readily available current <br />bid Information based on similar projects within the area. Backup will be generated for lump sum items. Contingencies will <br />be shown, as agreed upon with City staff. <br />; <br />Dalfvarablesr M, 60%, and Final Estimates, electronic files in PDF, <br />h <br />� e <br />Kimley»)Horn 18 rROC770 ,,171CitpatSantaAna <br />
The URL can be used to link to this page
Your browser does not support the video tag.