Laserfiche WebLink
RESUMES <br />Darren Adrian, R.E. <br />PROJECT MANAGER <br />Darren has more than 27 years of professional experience in civil engineering <br />related to planning, design, and construction of transportation facilities. His primary <br />emphasis has been in the areas of roadway planning and final design associated <br />with hiighways and streets Including Interchanges; at -grade intersections; railway grade separations, <br />widening and rehabilitation. He has served as project manager for theCityof Santa Ana On -Cali for <br />several years and brings a superior project management track record combined with technicai knowledge <br />and skill. He recently served as ASCE President for the Orange County Branch, which demonstrates both <br />his dedication to the engineering community as well as the respect he has garnered amongst his peers, <br />Professional Credentials <br />Bachelor of Science, Civil Engineering, California Skate Polytechnic University, Pomona <br />Professional Engineer In California (453031) and Utah (#318105-2202) <br />American Public Works. Association, Member <br />American Society of Civil Engineers (ASCE), Board Member <br />institute of Transportation Engineers, Member <br />Relevant Experience <br />d County of Orange,On•CallArchltectlEngineer <br />Design Support Services (2014-17), Orange <br />County, CA - Project Manager. <br />• City of Corona On -Call Traffic and Transportation <br />Services, Corona, CA — Project Engineer <br />/ City of Fontana On -Call Pavement <br />Rahabilitation/Utility Design, Fontana, CA— <br />Project Manager <br />• On -Call Civil Engineering Professional Services, <br />San Bernardino County, CA — Project Engineer <br />,A On -Call Traffic and Civil Engineering Services, <br />(Industry), City of Industry, CA — Project Manager <br />.4 WTA, Preliminary Engineering and <br />Environmental Documentation for 17th Street <br />Grade Seperstion Project, Orange County, CA — <br />Project Manager <br />J ACE Construction Authority, Phase II Grade <br />Separations PS&E, Fullerton Road Grade <br />Separation, City of industry, CA —Project <br />Manager <br />• Anaheim Rapid Connection (ARC) Streetcar, <br />Anaheim, CA -- Project Manager <br />• Azusa Avenue/Amar Road intersection <br />Improvements, West Covina, CA — Project <br />Engineer <br />I Azusa/Gale Intersection Analysis, City of Industry, <br />CA -- Project Manager <br />• Baseline Road/Laurel Avenue Intersection <br />Widening, Fontana, CA. Project Manager <br />J City of Anaheim, Gene Autry Way <br />Improvements (1-5 to State College Blvd.) & <br />State College Blvd. Improvements (West Side), <br />Anaheim, CA — Principal -in -Charge <br />1 California State. University -Long Beach, West <br />Campus Turnaround Drainage (Veteran Affairs), <br />Long Beach, CA — Project Manager <br />• City of Buena Park, $R 91/Beach Blvd WB Exit <br />Ramp, Buena Park, CA — Project Manager <br />1 CSU Long Beach, East Campus Road - Safety <br />Improvements, Long Beach, CA—QC/QA <br />Reviewer <br />Diamond Bar Prospectors Road Street <br />Rehabilitation Project, Diamond Bar, CA — <br />Project Manager <br />A East Coast Highway Signal Rehab Design, <br />Newport Beach, CA— Project Director <br />A Firestone Boulevard Improvements, Buena <br />Park, CA —Project Manager <br />Pavement Rehabilitation (Task Order Under on - <br />Call), Pomona, CA— Project Manager <br />A Traffic Flow Improvement Study of Artesia <br />Boulevard from 1.5 to Beach Boulevard, Buena <br />Park, CA —Project Manager <br />Kim I12y»>Horn <br />