RESUMES
<br />Darren Adrian, R.E.
<br />PROJECT MANAGER
<br />Darren has more than 27 years of professional experience in civil engineering
<br />related to planning, design, and construction of transportation facilities. His primary
<br />emphasis has been in the areas of roadway planning and final design associated
<br />with hiighways and streets Including Interchanges; at -grade intersections; railway grade separations,
<br />widening and rehabilitation. He has served as project manager for theCityof Santa Ana On -Cali for
<br />several years and brings a superior project management track record combined with technicai knowledge
<br />and skill. He recently served as ASCE President for the Orange County Branch, which demonstrates both
<br />his dedication to the engineering community as well as the respect he has garnered amongst his peers,
<br />Professional Credentials
<br />Bachelor of Science, Civil Engineering, California Skate Polytechnic University, Pomona
<br />Professional Engineer In California (453031) and Utah (#318105-2202)
<br />American Public Works. Association, Member
<br />American Society of Civil Engineers (ASCE), Board Member
<br />institute of Transportation Engineers, Member
<br />Relevant Experience
<br />d County of Orange,On•CallArchltectlEngineer
<br />Design Support Services (2014-17), Orange
<br />County, CA - Project Manager.
<br />• City of Corona On -Call Traffic and Transportation
<br />Services, Corona, CA — Project Engineer
<br />/ City of Fontana On -Call Pavement
<br />Rahabilitation/Utility Design, Fontana, CA—
<br />Project Manager
<br />• On -Call Civil Engineering Professional Services,
<br />San Bernardino County, CA — Project Engineer
<br />,A On -Call Traffic and Civil Engineering Services,
<br />(Industry), City of Industry, CA — Project Manager
<br />.4 WTA, Preliminary Engineering and
<br />Environmental Documentation for 17th Street
<br />Grade Seperstion Project, Orange County, CA —
<br />Project Manager
<br />J ACE Construction Authority, Phase II Grade
<br />Separations PS&E, Fullerton Road Grade
<br />Separation, City of industry, CA —Project
<br />Manager
<br />• Anaheim Rapid Connection (ARC) Streetcar,
<br />Anaheim, CA -- Project Manager
<br />• Azusa Avenue/Amar Road intersection
<br />Improvements, West Covina, CA — Project
<br />Engineer
<br />I Azusa/Gale Intersection Analysis, City of Industry,
<br />CA -- Project Manager
<br />• Baseline Road/Laurel Avenue Intersection
<br />Widening, Fontana, CA. Project Manager
<br />J City of Anaheim, Gene Autry Way
<br />Improvements (1-5 to State College Blvd.) &
<br />State College Blvd. Improvements (West Side),
<br />Anaheim, CA — Principal -in -Charge
<br />1 California State. University -Long Beach, West
<br />Campus Turnaround Drainage (Veteran Affairs),
<br />Long Beach, CA — Project Manager
<br />• City of Buena Park, $R 91/Beach Blvd WB Exit
<br />Ramp, Buena Park, CA — Project Manager
<br />1 CSU Long Beach, East Campus Road - Safety
<br />Improvements, Long Beach, CA—QC/QA
<br />Reviewer
<br />Diamond Bar Prospectors Road Street
<br />Rehabilitation Project, Diamond Bar, CA —
<br />Project Manager
<br />A East Coast Highway Signal Rehab Design,
<br />Newport Beach, CA— Project Director
<br />A Firestone Boulevard Improvements, Buena
<br />Park, CA —Project Manager
<br />Pavement Rehabilitation (Task Order Under on -
<br />Call), Pomona, CA— Project Manager
<br />A Traffic Flow Improvement Study of Artesia
<br />Boulevard from 1.5 to Beach Boulevard, Buena
<br />Park, CA —Project Manager
<br />Kim I12y»>Horn
<br />
|