GkR
<br />r y h Kevin has nearly years of experience in structural anginserfng and
<br />muitidlsolpllnary project management on variety of public seotorprojeots. His
<br />£ expertise ranges from preparing preliminary project assessment documents and
<br />bridge selection reports to brldge/retaining wall construction plans, quantities,. estimates and
<br />specifications, as well as managing post-design/construction aotivities. Kevin's bridge design experience
<br />includes structures of reinforced concrete, precasttpre-stressed concrete, oast»in-plape post-tensloneO
<br />concrete and struotural steel. He also.brings experience in the design of pedestrian bridges and other
<br />various structwres such as retaining walls, sign and Jlghting structures, shade pedestrian shelters,
<br />drainage.structures, and building elpnlents. Over the years, Kevin has worked on many fast -track projects
<br />and has shown his commitment to getting projects done in a timely manner,
<br />Professional Credentials
<br />Bachelor of Science, Civil Engineering, Montana State University
<br />Registered Professlonai Engineer in Arizona. (4043306), California (#75462), and North Carolina (#0304$3)
<br />American Society of Civil Engineers, Member
<br />Relevant Experience
<br />,4 Santa Rosa Road Widening Project, Camarillo,
<br />CA -- Project Engineer
<br />A A.E. Wright Middle School Pedestrian Bridge,
<br />Calabasas, CA Project Engineer
<br />.4 Advanced Transportation Management and
<br />Information and Security System (ATMIS), Port
<br />of Long Beach, CA — Project Engineer
<br />r Agoura Road Widening Project (Complete
<br />Streets), Agoura Hills, CA — Project Engineer
<br />J 11thAvenue Improvements (part ofthe
<br />Downtown BRT Stations project), San Diego,
<br />CA-- Project Engineer
<br />.t 17316 W. Sunset Blvd, Renovation Project (J.
<br />Paul Getty), Pacific Palisades, CA — Project
<br />Engineer
<br />Interchange improvements for 1-215 at Cactus
<br />Avenue PSR, Moreno Valley, CA —.Project
<br />Engineer
<br />• Broadway Plaza Parking Study, Walnut Creek,
<br />CA -•- Project Engineer
<br />J Caleveras Sidewalk Improvements, Milpitas,
<br />CA — Project Engineer
<br />• SANDAG, Broadway CorridQUBRT Station
<br />Engineering and Environmental Compliance
<br />(CEQA), San Diego, CA— Project Engineer
<br />Kirnley*Horn
<br />A SANDAG, Final Design of the. South Line Freight
<br />Rail Improvements, San Diego, CA — Project
<br />Engineer
<br />J I-5/Genesee PR/ED, PS&E and Construction
<br />Phase Services (CPS), San Diego, CA,--
<br />Projeot Engineer
<br />i SANDAG/MTS Light Rail Transit (LRT) Renewal
<br />Project - Blue Line Stations, San Diego, CA --
<br />Project Engineer
<br />A Graton Casino - Wilfred Avenue Off -Site
<br />Improvements, Rohnert Park, CA -- Project
<br />Engineer
<br />J 1-215A/an Buren Blvd Interchange PA&ED and
<br />PS&E Phases, Riverside County, CA — Project
<br />Engineer
<br />4 City of Rocklin, Farron Street Pedestrian Bridge,
<br />Rocklin, CA — Project Manager
<br />• Lincoln On•Calt Services, Lincoln, CA — Project
<br />Engineer
<br />• Los Angeles, Upper 2nd Street Bridge Design,
<br />Los Angeles, CA — Project Engineer
<br />I City of Elk Grove, Preliminary Engineering for
<br />Intermodal Rail Station, Elk Grove, CA —
<br />.Project Engineer
<br />• City of Folsom, Johnny Cash Trail - Phase Two,
<br />Folsom, CA — Project Engineer
<br />
|