Chris #ser, P.E., LEER Air
<br />STRUCTURAL SERVICES — TASK MANAGER
<br />Chris has nearly 16 years of experience on a variety of projects, including building
<br />structural and pavement assessments, parking facility design and repair, vehicular
<br />and pedestrian bridge design and repair, culvert design,.roadwaylstreetecape
<br />Improvements, and other ancillary transportation support structures. Chris' responsibilities have included
<br />planning, structural design, production of, plans and specifications, and construction phase services for a
<br />wide range of project types. His design and assessment experience encompasses structures of
<br />reinforced concrete, precaatf prestressed concrete;, post -tensioned concrete, and structural steel for a
<br />wide variety of project and client types. Chris also recognizes the correlation between sustainability and
<br />practicality and appiies this to every project.
<br />Professional Credentials
<br />Mastarof and 'Bachelor of Science, Civil Engineering, Clemson University
<br />Professional Engineer in CA (980317), SC (#28099), NC (#35111), TN (#405278)
<br />LEER AP (Leadership in Energy and Environmental Design)
<br />American Society of Civil Engineers, Mombor
<br />International Parking Institute, Advisory Council, Sustalnability Committee, Consultants Committee
<br />Green Parking Council, Credentialing Committee
<br />Relevant Experience
<br />• Bayside District, 3rd Street Promenade
<br />Downtown Parking Study, Santa Monica, CA —
<br />Project Engineer
<br />J Firestone Boulevard Improvements, Buena
<br />Park, CA— Project Manager
<br />• City of Anaheim, Gene Autry Way Improvements
<br />(1-6 to State College Blvd.) & State College Blvd.
<br />Improvements (West Side), Anaheim, CA
<br />• Pavement Rehabilitation (Task Order Under on-
<br />Call), Pomona, CA — Project Manager
<br />.9 Traffic; Flow improvement Study of Artesia
<br />Boulevard from 1.6 to Beach Boulevard, Buena
<br />Park, CA — Project Manager
<br />i C Gold Line Design-Sulld Wayside Energy
<br />Storage Substructure (WESS) Project, Los
<br />Angeles, CA —Project Engineer
<br />I Comprehensive Parking Analysis, Santa Ana,
<br />CA — Project Engineer
<br />A California State University -Long beach, West
<br />Campus Turnaround Drainage (Veteran Affairs),
<br />Long Beach, CA — Project Manager
<br />• City of Buena Park, SR 91JBeach Blvd WB Exit
<br />Ramp, Buena Park, CA —Project Manager
<br />Patton Street Pocket Park (Parks for People),
<br />Los Angeles, CA — Project Engineer
<br />A CSU Long Beach, East Campus Road - Safety
<br />Improvements, Long Beach, CA—QC/OA
<br />Reviewer
<br />• Diamond Bar Prospectors Road Street
<br />Rehabilitation Project Diamond Bar, CA —
<br />Project Manager
<br />• East Coast Highway Signal Rehab Resign,
<br />Newport Beach, CA — Project Director
<br />.1 Valley Transportation Authority PARCS, Silicon
<br />Valley, CA — Project Engineer
<br />• Santa Fe Christian School Parking Deck, Solana
<br />Beech, CA -- Project Engineer
<br />i Berryessa Station Parking Structure, San Jose,
<br />CA — Project Engineer
<br />I California State University, Sacramento Parking
<br />Structure Condition Assessments, Sacramento,
<br />CA —Project Engineer
<br />• Lower Pacific Avenue Parking Study, Santa
<br />Crux, CA— Project Engineer
<br />.i Milpitas Station Pedestrian Bridge over
<br />Montague Expressway, Milpitas, CA —Project
<br />Engineer
<br />A Richmond Transit Village Parking Garage
<br />(BART), Richmond, CA — Project Engineer
<br />lKimley*Horn
<br />
|