Laserfiche WebLink
Chris #ser, P.E., LEER Air <br />STRUCTURAL SERVICES — TASK MANAGER <br />Chris has nearly 16 years of experience on a variety of projects, including building <br />structural and pavement assessments, parking facility design and repair, vehicular <br />and pedestrian bridge design and repair, culvert design,.roadwaylstreetecape <br />Improvements, and other ancillary transportation support structures. Chris' responsibilities have included <br />planning, structural design, production of, plans and specifications, and construction phase services for a <br />wide range of project types. His design and assessment experience encompasses structures of <br />reinforced concrete, precaatf prestressed concrete;, post -tensioned concrete, and structural steel for a <br />wide variety of project and client types. Chris also recognizes the correlation between sustainability and <br />practicality and appiies this to every project. <br />Professional Credentials <br />Mastarof and 'Bachelor of Science, Civil Engineering, Clemson University <br />Professional Engineer in CA (980317), SC (#28099), NC (#35111), TN (#405278) <br />LEER AP (Leadership in Energy and Environmental Design) <br />American Society of Civil Engineers, Mombor <br />International Parking Institute, Advisory Council, Sustalnability Committee, Consultants Committee <br />Green Parking Council, Credentialing Committee <br />Relevant Experience <br />• Bayside District, 3rd Street Promenade <br />Downtown Parking Study, Santa Monica, CA — <br />Project Engineer <br />J Firestone Boulevard Improvements, Buena <br />Park, CA— Project Manager <br />• City of Anaheim, Gene Autry Way Improvements <br />(1-6 to State College Blvd.) & State College Blvd. <br />Improvements (West Side), Anaheim, CA <br />• Pavement Rehabilitation (Task Order Under on- <br />Call), Pomona, CA — Project Manager <br />.9 Traffic; Flow improvement Study of Artesia <br />Boulevard from 1.6 to Beach Boulevard, Buena <br />Park, CA — Project Manager <br />i C Gold Line Design-Sulld Wayside Energy <br />Storage Substructure (WESS) Project, Los <br />Angeles, CA —Project Engineer <br />I Comprehensive Parking Analysis, Santa Ana, <br />CA — Project Engineer <br />A California State University -Long beach, West <br />Campus Turnaround Drainage (Veteran Affairs), <br />Long Beach, CA — Project Manager <br />• City of Buena Park, SR 91JBeach Blvd WB Exit <br />Ramp, Buena Park, CA —Project Manager <br />Patton Street Pocket Park (Parks for People), <br />Los Angeles, CA — Project Engineer <br />A CSU Long Beach, East Campus Road - Safety <br />Improvements, Long Beach, CA—QC/OA <br />Reviewer <br />• Diamond Bar Prospectors Road Street <br />Rehabilitation Project Diamond Bar, CA — <br />Project Manager <br />• East Coast Highway Signal Rehab Resign, <br />Newport Beach, CA — Project Director <br />.1 Valley Transportation Authority PARCS, Silicon <br />Valley, CA — Project Engineer <br />• Santa Fe Christian School Parking Deck, Solana <br />Beech, CA -- Project Engineer <br />i Berryessa Station Parking Structure, San Jose, <br />CA — Project Engineer <br />I California State University, Sacramento Parking <br />Structure Condition Assessments, Sacramento, <br />CA —Project Engineer <br />• Lower Pacific Avenue Parking Study, Santa <br />Crux, CA— Project Engineer <br />.i Milpitas Station Pedestrian Bridge over <br />Montague Expressway, Milpitas, CA —Project <br />Engineer <br />A Richmond Transit Village Parking Garage <br />(BART), Richmond, CA — Project Engineer <br />lKimley*Horn <br />