Laserfiche WebLink
01t1i <br />*''TWINING <br />Amir Ghavibazoo, Ph.D., Sen%rPavementEngineer <br />Dr. Amir Ghavibezoots the Senior Pavement Engineer at Twining, Inc, He dlracts and works on <br />pavement design, highway design, and engineering specifications, During hlagraduate study, Amir <br />obtained extensive knowledge and expertise on Pavement Management Systems (MlcroPaver), <br />Pavement Evaluation and Pavement Rehabilitation Strategies. He is an expert In adicuiating Pavement <br />Condition Index (POI) through visual inspection following the United Stated Army Corps of Engineers' <br />methodology, as well as conducting Life Cycle Cost Analysls (LOCA) rehabilitation strategies for <br />pavements. Amir has extensive practical e-Verlenoe In asphalt pavement engineering Including <br />pavement design, rehabilitation, preservation, pavement management, materials, Land construction. His <br />experience includes the characterization of rubberized asphalt hinders end developing mix designs <br />following Superpave specifications. He works closely with cities and,government agencies to develop <br />unique and specialized mix designs, pavement constructions inspections, and pavementdesign <br />solutions. <br />Overview <br />in the Industry wince 2014 <br />.Joined Twining In 2014 <br />Education <br />Ph.D. in Civil and Environmental Englneering <br />North Dakota State University <br />Master of Sclence in Railways Englneering <br />Iran University of Science and Technology, Tehran, Iran <br />Project Experience Summaries <br />• City of Huntington Beach, Nichols Lane Rehabilitation Twining performed inspection and <br />material testing. on this project. Amir served as project manager to assure the quality of the job <br />that was being delivered to the City, He oversaw the material sampling and testing and provided <br />technical comments to the City. He was also responsible for developing Cement -treated soil mix <br />design for the City. <br />• City of Claremont, Foothill Boulevard Improvement Twining performed pavement evaluation <br />on approximately four lane miles of Foothill Boulevard In the City of Claremont to recommend <br />repair and rehabilitation strategies forthe pavement, Amir served as senior pavement engineer, <br />coordinating the required testing and preparationof the final recommendation and design. <br />Several alternative options were provided to the City, including mill and overlay, Cold In -Place <br />recycling, reconstruction, and soil €stabilization. <br />• Pavement Evaluation & Repair Recommendations at Various Parks Twining performed <br />network level pavement evaluation on approximately 2Olane miles of road In various parks of <br />Forest Lawn in Southern California to develop a 5-year plan for rehabilitation of the road network. <br />Amir was the lead Pavement Engineer on this project, coordinating all required surface evaluation <br />tasks, data collection, and preparation of the final report. <br />• City of EI Monte, Ramona Boulevard Resurfacing Pavement Evaluation This project <br />consisted of repairing the PS&E and related construction documents for the 2014- 2015 STP-L <br />Ramona Boulevard Street Resurfacing project. Twining performed geotachnicei pavement <br />Avalnatinns And rehabilitation rAnnmmAndatlnns 1br this nmlAnt Amir sarvAr1 As thA nAwRmAnt <br />