Laserfiche WebLink
"TWINING <br />Paul Soltis, PE, GE, 'Senior Geofechnical Engineer <br />Maul Soltis, Wl�, GE, brings more than 24 years of technical expertise to Twining. His experience <br />Includes geoteohnicai Investigations and analyses relative to roads, bridges, highways, and other <br />California Infrastructure projects, His focus is on interaction with the design team during <br />development of construction documents to achieve the most oppropriate foundation type and most <br />efficient site preparation techniques.. Paul has'extenslve on-tCall contract management experience <br />and the. proven pbility to simultaneously maintain end manage multiple projects. Paul Is <br />responsible for the technical ovorelght;ofthe firm's, gagteChnloai projects and management of the <br />firm's geotechnical personnel, <br />Overview <br />In the Industry slnce'Ig93, <br />Joined Twining In 2005 <br />Curraht.1.14enssa Held <br />• Professlonal Engineer, Civil, CA, 60140 <br />• Registered.Geotechnical Engineer, CA, GE 2506 <br />Education <br />M6; Geotechnical Engineering; University of Colorado, Boulder;'CO <br />BS, Civil Engineering, California Polytechnic State University, San Luis Obispo, BA <br />Project Experience Summaries <br />• City of Long Beach, Studebaker Road Pavement Evaluation Serving as Geotechnical <br />Engineer, Maui provided engineering oversight to ensure the City$ expectations were met on this <br />0.5,mlie stretch of Studebaker Road In the City of Long Beach. The surface condition assessment <br />was performed following the Caltrans Flexible Pavement Rehabilitation Manuel. Boring and <br />coring were performed to investigate the subsurraoe coridftlon of the road, Based on collected <br />Information, different rehabilitation strategies were calculated and recommended to the City of <br />Long Beach, including Cold in -Place Recycled Asphalt Concrete Pavement and Cement <br />Stabilized. Puiverized Base. <br />LADPW, psi Amo Boulevard Improvements This project consisted ofextraeting asphalt <br />concrete cores and developing a.cold recycling mix design using the collected materials. The <br />thickness of the existing asphalt concrete and base was recorded. The extracted materials were <br />returned to Twining's Long Beach laboratory for evaluation in order to develop a cold recycling <br />mix design. In addition to developing the mix design, Twining served as the quality assurance <br />testing laboratory during oonstruction, Paul provided geotechnicai oversight throughout this <br />project, assisting with the investigation and identification of soft subgrade soils that were <br />discovered during construction. <br />• County of San Bernardino, On -Call Geotechnical Engineering Services Paul is currently the <br />project manager for this contract and provides monitoring, sampling, testing, reporting and <br />Contract compliance enforcement for construction concrete, quality control compliance of steel, <br />reinforcing steel, wood, roofing material, brick, masonry, material quality control of asphalt and <br />concrete paving and road construction materials, compaction testing, R-value, aggregate <br />analysis, sieve analysis, gradation classification, moisture content, and shear analysis. <br />