Education
<br />88,OlviilEnginearing, University
<br />of Oailfomla, Irvine
<br />Oertifioation jl.loonso
<br />Professional Engineer:. bA, UT
<br />Areas.ofExperCisa
<br />• Well. Equipping Planning and
<br />Design
<br />• Pipeline Planning and Design
<br />, ProinotManagemen't
<br />ProgramManagement
<br />+ Prcleot Delivery
<br />• GroundwaterSupply
<br />• Pump Station Planning and
<br />Design
<br />• Reserv6lr8torage Planning
<br />and Design
<br />• Drinking Water
<br />Experience
<br />23fotalyeers
<br />• lyearwithHazon
<br />Professional Activities
<br />AW WA, ASOE, AMTA
<br />OA-NV AWWA,
<br />OA Water Reuse Anew,
<br />■
<br />Cindy Miller, PE
<br />Water/Wastewater Team Lead
<br />Ms. Miller has extensive experience in the
<br />planning, design and construction ofWatersupply,.
<br />treatment, storage and conveyance facilities,
<br />Herassignments have lncludedprovidingProgranvManagementservices
<br />far agisoiWillongroundwaterstipplyprglect, which 1ncludespipelines,
<br />wells, pump stations, and an advanced treatment system for R,O. con-
<br />centrate reductlonl. Project Managor forpreliminary and final design of
<br />a 28NOD microfiltration treatment facillty, and Project Manager.for a
<br />aO MGI R.O.1lon Exchange groundwatertreatmentfilant..Ms.Millerhas
<br />also led numerous water storage and conveyance Infrastructure projects,
<br />including design of over 106 miles, of Ductile Iron, CML&C steel, PVC,
<br />and 14M pipeline, deslgh ofsteel, pipe -stressed concrete, and cast -la -
<br />place concrete storage:reservolrs, up tom gallons, and numerous
<br />pump station facilities, She has led feasibility and planning studies,
<br />developed treatmontpiaressevaluations and life -cycle. cost evaluations,
<br />participated Iti value engineering studles:and opetratiqusrevaluations:
<br />She has developed detailed design of surly systems and provided con-
<br />structirin and startup services, She has experience with different project
<br />delivery methods: including, design -bid -build, design -build and de-
<br />sign -build -operate -finance.
<br />Oity of Santa Ana Well 29ImprovementsAlternatives Analysis,
<br />Santa Ana, OA
<br />Principal In Charge. The City of Santa Alta owns and operates. Well 20,
<br />located at the satitheastcorner ofFlower Street and First Street, adjaeont
<br />to City owned tennis courts. well2g pumps directly to an existing 8 MG
<br />reservoir. The existing well site Includes the well head and discharge
<br />pipfngawembiy, control equipment, achlorination.systeni luabuflding,
<br />and an SCE transformer. Ali alternatives analysis was conducted torec-
<br />ommend upgrades at the site including site improvements, structural,
<br />mechanical, and electrical upgrades. Highlights of the study Include
<br />developing three (3) alternatives for the Improved site, providing SD
<br />renderings for each site alternative,' and developing a prellminary opin-
<br />ion of probable cost for the design and construction of each alternative.
<br />discussed. The City is moving forward with Implementing the recom-
<br />mended alternative from this analysis.
<br />
|