Laserfiche WebLink
Education <br />88,OlviilEnginearing, University <br />of Oailfomla, Irvine <br />Oertifioation jl.loonso <br />Professional Engineer:. bA, UT <br />Areas.ofExperCisa <br />• Well. Equipping Planning and <br />Design <br />• Pipeline Planning and Design <br />, ProinotManagemen't <br />ProgramManagement <br />+ Prcleot Delivery <br />• GroundwaterSupply <br />• Pump Station Planning and <br />Design <br />• Reserv6lr8torage Planning <br />and Design <br />• Drinking Water <br />Experience <br />23fotalyeers <br />• lyearwithHazon <br />Professional Activities <br />AW WA, ASOE, AMTA <br />OA-NV AWWA, <br />OA Water Reuse Anew, <br />■ <br />Cindy Miller, PE <br />Water/Wastewater Team Lead <br />Ms. Miller has extensive experience in the <br />planning, design and construction ofWatersupply,. <br />treatment, storage and conveyance facilities, <br />Herassignments have lncludedprovidingProgranvManagementservices <br />far agisoiWillongroundwaterstipplyprglect, which 1ncludespipelines, <br />wells, pump stations, and an advanced treatment system for R,O. con- <br />centrate reductlonl. Project Managor forpreliminary and final design of <br />a 28NOD microfiltration treatment facillty, and Project Manager.for a <br />aO MGI R.O.1lon Exchange groundwatertreatmentfilant..Ms.Millerhas <br />also led numerous water storage and conveyance Infrastructure projects, <br />including design of over 106 miles, of Ductile Iron, CML&C steel, PVC, <br />and 14M pipeline, deslgh ofsteel, pipe -stressed concrete, and cast -la - <br />place concrete storage:reservolrs, up tom gallons, and numerous <br />pump station facilities, She has led feasibility and planning studies, <br />developed treatmontpiaressevaluations and life -cycle. cost evaluations, <br />participated Iti value engineering studles:and opetratiqusrevaluations: <br />She has developed detailed design of surly systems and provided con- <br />structirin and startup services, She has experience with different project <br />delivery methods: including, design -bid -build, design -build and de- <br />sign -build -operate -finance. <br />Oity of Santa Ana Well 29ImprovementsAlternatives Analysis, <br />Santa Ana, OA <br />Principal In Charge. The City of Santa Alta owns and operates. Well 20, <br />located at the satitheastcorner ofFlower Street and First Street, adjaeont <br />to City owned tennis courts. well2g pumps directly to an existing 8 MG <br />reservoir. The existing well site Includes the well head and discharge <br />pipfngawembiy, control equipment, achlorination.systeni luabuflding, <br />and an SCE transformer. Ali alternatives analysis was conducted torec- <br />ommend upgrades at the site including site improvements, structural, <br />mechanical, and electrical upgrades. Highlights of the study Include <br />developing three (3) alternatives for the Improved site, providing SD <br />renderings for each site alternative,' and developing a prellminary opin- <br />ion of probable cost for the design and construction of each alternative. <br />discussed. The City is moving forward with Implementing the recom- <br />mended alternative from this analysis. <br />