Laserfiche WebLink
9cluoatlon <br />B.S.,1994, pivll Engineering/ <br />Water Rosouresa, University of <br />Oalifornia at Irvine <br />0erdfloation/t.icense, <br />Profosslonal Enghaor: OA <br />Traneportatiph Worker <br />Identification Credential (TWIG), <br />Oalifornia,011 <br />Areas of Expertise <br />. Well Equipping Design <br />• Pipelina©esign <br />• Tronahless Pipellhe <br />Rehabilitation and Installation <br />+ Planninganddesign Ofmajor <br />water and waatewaterfaoilities. <br />Pump station design <br />• In-depth evaluation ofaystam <br />requirements for proposed <br />new facilities as well as for <br />rehabilitation, upgrado, or <br />replacement of existing pump <br />stations <br />Experience <br />• 22 fatal years <br />• tyearwfth Hazen <br />Steven Conner, PE <br />Water/Wastewater Teohnical Lead <br />Mr. Conner is a professional civil engineerwitl2 <br />22years of experience in the planning and <br />design ofwater infrastructure including <br />production welts, pipelines, storage tanks, <br />treatment systems, and booster stations. <br />Me, Conner Is responsible for project management, design, supervlslon, <br />cantracl administration, client Interaction aaddevelopmeat,and person- <br />nel management, His expertise includes: complex pumping and piping <br />system layout, Itydraulle design groundwater supply and' treatmentdesign, <br />and construction phase assistance including start-up and operation of <br />putmpingand treatment facilities. Me,. Conaercoordinates all engineering <br />support discipline's (civil, architectural, structural, process, mechanical,. <br />electrical, and Ja0during project design and construction phases? <br />City of Banta Ana Well 29 Improvements Alternatives Analysis, <br />Santa Ana, CA <br />Project Manager. The City of Santa Ana owns and operates Well29, lo- <br />cated at the southeast corner of Flower Street and FirstStreet, adjacent <br />to City owned tennis courts. Well29 pumps directly to an existing 6 MG <br />reservoir, The existing well site Includes the well head and discharge <br />piping assembly, control equipment, a chlorination system in abuildhig, <br />and are SCE transformer, An alternatives analysis was conducted to rec- <br />ammend upgrades at the site including site Improvements, structural, <br />mechanical, and electrical upgrades. Highlights of the study include <br />developing three (3) alternatives for the Improved site, providing SD <br />renderings for each site alternative, and developing a.preliminary opin- <br />ion of probable cost for the design and construction of each alternative <br />discussed. The City is moving forward with implementing the recom- <br />mended alternative from this analysis. <br />Mojave Water Agency Regional Recharge and Reoovery (R3) <br />Professional Activities project, San Bernardino County, CA <br />AmeriFngine an, Member <br />yofCivll Design Manager - Wells, Pump Station, Recharge Facility, Turnout Fa - <br />Engineers, Mambar <br />cilities, Reservoirs, Disinfection System, and Pipelines. Mr. Conner <br />provided engineering services to the Mojave Water Agency for the Re. <br />gional Recharge and Recovery (R3) Project, a high -profile water supply <br />project In San Bernardino County. The project will ultimately recharge <br />UP to 40,000 acre-feet per year of State Water Project water into the <br />UpperMojave Riverflood plain for later distribution to member agencies. <br />The Phase I project included construction of six wells to extract up to <br />Hazen <br />