9cluoatlon
<br />B.S.,1994, pivll Engineering/
<br />Water Rosouresa, University of
<br />Oalifornia at Irvine
<br />0erdfloation/t.icense,
<br />Profosslonal Enghaor: OA
<br />Traneportatiph Worker
<br />Identification Credential (TWIG),
<br />Oalifornia,011
<br />Areas of Expertise
<br />. Well Equipping Design
<br />• Pipelina©esign
<br />• Tronahless Pipellhe
<br />Rehabilitation and Installation
<br />+ Planninganddesign Ofmajor
<br />water and waatewaterfaoilities.
<br />Pump station design
<br />• In-depth evaluation ofaystam
<br />requirements for proposed
<br />new facilities as well as for
<br />rehabilitation, upgrado, or
<br />replacement of existing pump
<br />stations
<br />Experience
<br />• 22 fatal years
<br />• tyearwfth Hazen
<br />Steven Conner, PE
<br />Water/Wastewater Teohnical Lead
<br />Mr. Conner is a professional civil engineerwitl2
<br />22years of experience in the planning and
<br />design ofwater infrastructure including
<br />production welts, pipelines, storage tanks,
<br />treatment systems, and booster stations.
<br />Me, Conner Is responsible for project management, design, supervlslon,
<br />cantracl administration, client Interaction aaddevelopmeat,and person-
<br />nel management, His expertise includes: complex pumping and piping
<br />system layout, Itydraulle design groundwater supply and' treatmentdesign,
<br />and construction phase assistance including start-up and operation of
<br />putmpingand treatment facilities. Me,. Conaercoordinates all engineering
<br />support discipline's (civil, architectural, structural, process, mechanical,.
<br />electrical, and Ja0during project design and construction phases?
<br />City of Banta Ana Well 29 Improvements Alternatives Analysis,
<br />Santa Ana, CA
<br />Project Manager. The City of Santa Ana owns and operates Well29, lo-
<br />cated at the southeast corner of Flower Street and FirstStreet, adjacent
<br />to City owned tennis courts. Well29 pumps directly to an existing 6 MG
<br />reservoir, The existing well site Includes the well head and discharge
<br />piping assembly, control equipment, a chlorination system in abuildhig,
<br />and are SCE transformer, An alternatives analysis was conducted to rec-
<br />ammend upgrades at the site including site Improvements, structural,
<br />mechanical, and electrical upgrades. Highlights of the study include
<br />developing three (3) alternatives for the Improved site, providing SD
<br />renderings for each site alternative, and developing a.preliminary opin-
<br />ion of probable cost for the design and construction of each alternative
<br />discussed. The City is moving forward with implementing the recom-
<br />mended alternative from this analysis.
<br />Mojave Water Agency Regional Recharge and Reoovery (R3)
<br />Professional Activities project, San Bernardino County, CA
<br />AmeriFngine an, Member
<br />yofCivll Design Manager - Wells, Pump Station, Recharge Facility, Turnout Fa -
<br />Engineers, Mambar
<br />cilities, Reservoirs, Disinfection System, and Pipelines. Mr. Conner
<br />provided engineering services to the Mojave Water Agency for the Re.
<br />gional Recharge and Recovery (R3) Project, a high -profile water supply
<br />project In San Bernardino County. The project will ultimately recharge
<br />UP to 40,000 acre-feet per year of State Water Project water into the
<br />UpperMojave Riverflood plain for later distribution to member agencies.
<br />The Phase I project included construction of six wells to extract up to
<br />Hazen
<br />
|