Laserfiche WebLink
Steven Oonne , PE <br />1s,aoo acre-ft peryear, over 16 miles of 12-inch to 48-inch diameter pipe, a 2.65 MG welded steel reservoir, a <br />flow control and recharge facility with 40,000 gpm capacity and up to235 pstpressure drop, a pump station <br />sized for 25;000 gpm with pumps installed to provide lg;000 gpm, and four turnoutflow control facilities for <br />delivering the water to member agencies. <br />Beliflower High Oapacity Wsll, Olty of Bellflower, Bellflower, OA <br />Project Manager., Prepared a preliminary design report and provided final enginceringdoign and construe- <br />tion management and Inspection services for the well drilling and equipping of the city's new high -capacity <br />groundwater well. The well is designed to produce 3,5oo gallons per minute of high -quality groundwater:to <br />replace a large portion of the city'swater supplies. Electrical design services Included atnotor control center, <br />avariable-frequencydrlveforthewell pump, Interior and exterior lighting, an automatictransferswitch, and <br />an emergency diesel -fueled generator. Control, design included preparation of process and instrumentation <br />diagrams. and speclficatton of.eontrol components to provide consistency with control components installed <br />In existing city facilities. Provided engineering support during testing and startup of the well. <br />Wells 21 and 22 Wellhead Facilities and Pipelines, Irvino Ranch Water District, Tustin, OA <br />Task Manager Task manager responsible for thedesign ofthewellhead facilities and untreated water pipeline. <br />Deliverables Included plains, speelfications and engineers estimates of probable construction costs for each <br />the wellhead facilities and all plpelines, Well 21 and Well22, with capacities of 3,300.gpm and 1,600 gpm re- <br />spectively, are submersible turbine pump / motor assemblies, Installed Within vaults, and one well Is equipped <br />with a bladder -type surge tank. Project included 7,000 ft. of 24-loch steel untreated water pipeline, i3,000 <br />feet of 36-Inch steel product water pipeline and 1,700 LP of 10-Inch UDPE brine concentrate pipeline. The <br />pipelines requiredjack-and-bores to cross the OCTA lvletrolinlc train tracks, an Orange County Flood Control <br />District channel, ENSB train tracks, a box culvert, and Peter's Canyon Channel. <br />Rehabilitation of Oollege Avenue Pump Station, Orange OountySanitation District, Oosta Mesa, OA <br />Engineer. Provided engineering services to Orange County Sanitation District for rehabilitation of College <br />Avenue Sewage Pump Station, Provided engineering and construction support services for the rehabilitation <br />ofthe CollegeAvenueSewage Pump Station. The design included replacement ofpumping equipment with new <br />dry -pit submersible pumps, structural rehabilitation of the wet -pit and dry -pit, a new ventilation system, a <br />new odor control system, anew discharge valve vault for Interconnecting daalforee mains, and a new concrete <br />block building for the electrical equipment and. controls. The design Includedreplacement of pumping equip- <br />ment with new submersible pumps and a new concrete black building to house the new electrical equipment <br />and controls. <br />R000nstructlon of the Los Alamitos Pump Station and Retarding Basin, County of Orange, OA <br />Pump Station Technical Advisor. Prepared plans, specifications, and estimates for anew Soo efs storm <br />water pump station with natural gas engine driven pumps to replace the existing Los Alamitos facility <br />for the County of orange. Work included final design for the pump station facility and retarding basin, <br />preparation of a value engineering report, final engineering report, hydrology and hydraulic routing, best <br />management practices for improvingwaterquality, Inspection and analysis of existing 2,400lineal foot of <br />54-inch discharge piping, Phase I and 11 environmental assessments, geotechnical investigation, CEQA, and <br />permit processing, and coordination with agencies and homeowner associations. The pump station includes <br />four vertical mixed flow pumps with a design capacity of129 MGD each, Each pump Is drlvenby a 1500 hp <br />dual -fuel engine (natural gas and propane). Engine related components include a compressed air starting <br />system, primary and secondary Jacket water cooling system, natural gas primary fuel system, and propane <br />