Laserfiche WebLink
Tasl< 13: Storm Drain Plans (Option 8) <br />..............I....... ........ ..,......,,... ,.................,....I.... <br />We will prepare storm drain plans showing proposed catch basins and lateral connections to the existing main lines, <br />Catch basin sizing, Inlet dimensions, and laterals pipe sizes will be determined as. part of Task 4. Potential conflicts with <br />existing utilities will be shown on profiles with approximate location of utilities, per the utility agencies readily evailable <br />record drawings. Storm drain plans will be prapared eta scale of 1" u 20' horizontal and I" » 4'vertloal for profiles. <br />Deliverables: 301, 60%, and Final Plans, electronio files in Microstatlon V81 and PDP (nai plans will be sealed and <br />signed), and responses to previous review comments from the city. <br />Task 14: Street Light and Electrical Plans (Option B1 <br />Klmley-Horn will prepare'streat light plans for the project. Plans will incorporate street lighting along both sides of the <br />street. We will cohduet voltage drop calculations to determine the wiring sizes. Part of this task will Include coordination <br />with Southern California Edison to deteimine'new and existing service points. We will provide a photometrle.ansiysis to <br />determine requirsdiliumination for the corridor, <br />Deliverables; 30%, 60%, and Final Plans, electronic files in Mfcrostation V81 and PDF (Final glens wllibe sealed and <br />signed)', and responses to previous review comments from the City <br />Tesl{ 15: Traffic Signal Plans (Option B) <br />We will prepare traffic signal plans to Incorporate the new Improvements along project area. Installation of clossc1<;I cult <br />television (CCTV), video detection, conduits, and cables or modification of existing communication systems is anticipated <br />Within the project limits and will be shown on the.trafflo signal plans. Plans will show the connection to each signalized <br />intersection within the project limits. Pull box details and modification of conduit sweeps for the signal interconnect are <br />included. The traffic signal modification plan will beprepared in accordance with current City and Caltrans standards and <br />will be prepared at a scale of 1 " = 20', <br />Deliverables: 30%, 60, and Final Plans, electronic riles In Mlcrostation 1/81 and PDF (final plans will be sealed and <br />signed), and responses to previous review comments from the City. <br />Task 1 G: Specifications (Options A and B) <br />.................. ................................................ <br />KimleyHom will prepare technical speclifcatlons based upon the boiler plate supplied by the City, Bid items will be <br />described as reasonably required in the General Provisions and will be included in the Contractor's bid list, References for <br />the technical provisions to the City's Standards and Standard Specifications for Public Works Construction (Greenbook), <br />Callrans, or other appropriate specifications will be shown. <br />Daltverables::30%, 60%, and Final specifications, electronic files In PDF and word format (final specifications will be <br />sealed and signed), and responses to previous review comments from the City. <br />Task ....................................17: Opinion of Probable Construction Cost (Optlons A and B) <br />... ....................................................................................... <br />KimleyHorn will prepare an Opinion of Probable Construction Costs (Estimate) based on quantities, for comparison to <br />project budget and assist during the Contractor's bidding process, Unit prices will be derived from readily available current <br />bid information based on similar projects within the area. Backup will be generated for lump sum items. Contingencies will <br />be shown, as agreed upon with City staff, <br />Defiverab'les: Me, 60%, and Final Estimates, electronic files In PDF <br />Kimlep Horn 18 TROO77025771 City or Santa Ana <br />