Laserfiche WebLink
Frank Hoffmann, P.E. <br />QUALITY CONTROL/QUALITY ASSURANCE <br />1t r Frank has more than 30 years of diverse experience in civil design and construction <br />management. Project types.include'private, local, state, and federal working with <br />roadway design and Improvement, utility design, water resources, drainage design, <br />airport construction, private and commercial development, and more, His responsibilities have included <br />project management, worts plan preparation, cost estimating, .contractor selection, scheduling and <br />oversight,.design specification development, resource allocation, .technical and final report preparation <br />and review, :quality contrcf, troublershooting, negotiation/approval of field changes, and client relations. <br />Professional Credentials <br />Bachelor of Science, Civil Engineering, Fachhochachule Rheinland-Pfalz <br />Professional Engineer in California (0183g) and Arizona (#42877) <br />American Society of Civil Engineers, Member <br />Relevant 'Experience <br />Volgt Drive/1-5 North Coast Corridor (NCO) <br />Improvements (PSBR), San Diego, CA— <br />QO/QA Reviewer <br />A RCTD, 1-10,Bypass, Riverside County, CA — <br />Project Engineer <br />A RCTD, Sunset Avenue Railroad Grade <br />Separation at 1-10 PS&E, Banning, CA - <br />QC/QA iReviewer <br />A Cltyof Los Angeles, Bridge On -Call Program <br />(North Spring Street and Laurel Canyon Tasks), <br />Los Angeles, CA — <br />City of Los Angeles, Los Angeles Downtown <br />Streetcar lndepondent Cost Estimate, Los <br />Angeles, CA— Project Engineer <br />A Alameda Corridor East Construction Authority, <br />Phase II Grade Separations PS&E, Fullerton <br />Road Grade Separation, City of industry, CA — <br />Befley Road PSR/PDS, Bailey Road/SR 4 <br />Interchange PID, Contra Coate County, CA — <br />Project Engineer <br />i City of Lancaster, Program Management <br />Services for Measure R Highway Equity <br />Program, Lancaster, CA — Project Engineer <br />A Downtown Glendale Pedestrian Enhancements, <br />Glendale, AZ — QC/QA Reviewer <br />Expo Metro Line Construction Authority, Design <br />of LRT Phase 2, Los Angeles, CA--- Project <br />Engineer <br />Khley*Horn <br />-4 Gonsalves Avenue Extension, Marine Corps Air <br />Station. (MOAS), Mir,Eamar-San Diego., CA— <br />QC/QA.Reviewer <br />.4 1.6 North Coast - PA/EO and PS&E (also Staff <br />Augmentation 1.5 NOV Extension PS&E), San <br />Dioq% CA— QC/QA Reviewer <br />• 1.880 Express Lanes, Oakland, CA — Project <br />Engineer <br />1 La Habra Harbor/Lambert Intersection <br />Widening, Le Habra, CA — OC40A Reviewer <br />A SR 138 Project Approval & Environmental <br />Documentation (PA&ED), North Los Angeles <br />County, CA-- Project Engineer <br />• Loop 101 Frontage Road, Peoria, AZ._ Deputy <br />Project Manager <br />i Mulholland Highway Scenic Corridor, <br />Calabasas, CA—QG/QA Reviewer <br />OCTA, Preliminary Engineering and <br />Environmental Documentation for 17th Street <br />Grade Separation Project, Orange County, CA <br />i Regional Express Lane Network Phase 1- I- <br />880/16-80/813 84/SR 92 On -Call PS&E Design <br />Services, San Francisco County, CA — Project <br />Engineer <br />d SANDAG, Bus On Shoulder (BOB) Bus Rapid <br />Transit (SRT) Demonstration, San Diego, CA — <br />Project Engineer <br />• SANDAG, Mid -Coast - 100% Final Design <br />Phase, sub to PB, San Diego, CA — Project <br />Engineer <br />