RESUMES
<br />-en Adrian, P.E.
<br />CT MANAGER
<br />s more then 27 years of professional experience in civil engineering
<br />planning, design, and construction of transportation facilities. His primary
<br />has been in the areas of roadway planning and final design associated
<br />cling Interchanges, at -grade Intersections, railway grade separations,
<br />has served as project managerfor the City of Santa.Ana On -Call for
<br />erlor project management track record combined with technical knowledge
<br />anti skill tie rocently:served as ASCE President for the Orange County Branch, which demonstrates both
<br />his dedication to the engineering community as well as the respect he has garnered emongst.his peers.
<br />Professional Credentials
<br />Bachelor of SClance, Civil Engineering, California State Polytechnic University, Pomona.
<br />Professional Engineer in California (ff53031) and Utah (0161054202)
<br />American Public Works Association, Member
<br />American Society (if Civil Engineers (ASCE), Board Member
<br />Institute of Transportation Engineers, Member
<br />Relevant Experience
<br />• County of Orange, On -Call Architect/Engineer
<br />Design Support Services (2014.17), Orange
<br />County, CA — Project Manager,
<br />! City of Corona On -Call Traffic and Transportation
<br />Services, Corona, CA-- Project Engineer
<br />• City of Fontana On -Call Pavement
<br />Rehabilitation/Utility Design, Fontana, CA
<br />Project Manager
<br />I On -Call Civil Engineering Professional Services'
<br />San Bernardino County, CA— Project Engineer
<br />J On -Cali Traffic and Civil Engineering Services,
<br />(Industry), City of Industry, CA— Project Manager
<br />i OCTA, Preliminary Engineering and
<br />Environmental Documentation for 17th Street
<br />Grade Separation Project, Orange County, CA —
<br />Project Manager
<br />• ACE Construction Authority, Phase II Grade
<br />Separations PS&E, Fullerton Road Grade
<br />Separation, City of industry, CA— Project
<br />Manager
<br />• Anaheim Rapid Connection (ARC) Streetcar,
<br />Anaheim, CA —Project Manager
<br />I Azusa Avenue/Amer Read Intersection
<br />Improvements, West Covina, CA— Project
<br />Engineer
<br />• Azusa[©ale Intersection Analysis, City of Industry,
<br />CA -- Project Manager
<br />i Baseline Road/Laurel Avenue intersection
<br />Widening,. Fontana, CA— Project Manager
<br />A City of Anaheim, Gone Autry Way
<br />Improvements (1-5 to State College Blvd.) &
<br />State College Blvd. Improvements (West Side),
<br />Anaheim, CA -- Principal -in -Charge
<br />I California State University -Long Beach, West
<br />Campus Turnaround Drainage (veteran Affairs),
<br />Long Beach, CA— Project Manager
<br />City of Buena Park, SR 31iBeach Blvd WB Exit
<br />Ramp, Buena Park, CA— Project Manager
<br />J CSU Long Beach, East Campus Road - Safety
<br />improvements, Long Beach, CA— QClQA
<br />Reviewer
<br />/ Diamond Bar Prospectors Road Street
<br />Rehabilitation Project, Diamond Bar, CA —
<br />Project Manager
<br />a East Coast Highway Signal Rehab Design,
<br />Newport Beach, CA — Project Director
<br />• Firestone Boulevard Improvements, Buena
<br />Park, CA Project Manager
<br />• Pavement Rehabilitation (Task Order Under On.
<br />Call), Pomona, CA — Project Manager
<br />® Traffic Flow Improvement Study of Artesia
<br />Boulevard from 1-5 to Beach Boulevard, Buena
<br />Park, CA -- Project Manager
<br />Kimley7»Horn
<br />
|