Kevin Kimm, PEE,
<br />STRUCTURAL— TASK MANAGER
<br />Kevin has nearly 20 years .of experience in structural engineering and
<br />ri ', E : multidisciplinary project management on a variety of public sector projects. His
<br />expertise ranges from preparing preliminary project assessment documents and
<br />bridge selection reports to bridge/retaining wall construction plans, quantities, estimates and
<br />specifications, as well asmanaging post•dealgn/constevotion activities. Kevin.'s bridge design experiortco
<br />Includes structures of roinforoed concrete,.preoostlpro-stressed concrete, cast•in•plaoepost•tensionad
<br />concrete end structural steel. He also brings experience In the design of pedestrian bridges and other
<br />various structuressuch as retatriing wails, sign.and lighting structures, shade pedestrian shelters,
<br />drainage structures, end building elements. Over the years, Kevin has worked on merry fast -track projects
<br />and has shown his commitment to getting projects done In a timely manner.
<br />Professional Credentials
<br />Bachelor of Science, Civil Engineering, MontanaState University
<br />Registered Professional Englneer.in Arizona,(#043306), California (#75462), and North Carolina (#030483)
<br />American Society of Civil Engineers, Member
<br />Relevant Experience
<br />♦ Santa Rosa. Road Widening Project, Camarillo,
<br />CA— Project Engineer
<br />♦ A.E. Wright Middle School Pedestrian Bridge,
<br />Calabasas, CA — Project Engineer
<br />♦ Advanced Transportation Management and
<br />Information and Security System (ATMIS), Port
<br />of Long Beach, CA — Project Engineer
<br />♦ Agoura Road Widening Project (Complete
<br />Streets), Agoura Hills, CA —Project Engineer
<br />♦ 11th Avenue Improvements (pert of the
<br />Downtown BRT Stations project), San Diego,
<br />CA — Project Engineer
<br />♦ 17315 W, Sunset Blvd. Renovation Project (J.
<br />Paul Getty), Pacific Palisades, CA— Project
<br />Engineer
<br />i lnterchangeImprovements for 1-215atCactus
<br />Avenue PSR, Moreno valley, CA Project
<br />Engineer
<br />.♦ Broadway Plaza Parking Study, Walnut Creek,
<br />CA— Project Engineer
<br />• Calaveres Sidewalk Improvements, Milpitas,
<br />CA -- Project Engineer
<br />♦ SANDAG, Broadway CorridorJURT Station
<br />Engineering and Environmental Compliance
<br />(CEQA), San Diego, CA — Project Engineer
<br />Kim ley>))Horn
<br />♦ SANDAG, Final Design of the South Line Freight
<br />Rait Improvements, San Diego, CA —Project
<br />Engineer
<br />♦ 1.5/Genesee PR/ED, PS&E and Construction
<br />Phase Services (CPS), San Diego, CA m--
<br />Project Engineer
<br />• SANDAG/MTS Light Rail Transit (LRT) Renewal
<br />Project — Blue Line Stations, San Diego, CA —
<br />Project Engineer
<br />♦ Groton Casino - Wilfred Avenue Off -Site
<br />Improvements, Rohnert Park, CA —Project
<br />Engineer
<br />♦ 1-215/Van Buren Blvd Interchange PA&ED and
<br />PS&E Phases, Riverside County, CA— Project
<br />Engineer
<br />• City of Rocklin, Farron Street Pedestrian Bridge,
<br />Rocklin, CA — Project Manager
<br />♦ Lincoln On -Call Services, Lincoln, CA — Project
<br />Engineer
<br />♦ Los Angeles, Upper 2nd Street Bridge Design,
<br />Los Angeles, CA — Project Engineer
<br />• City of Elk Grove, Preliminary Engineering for
<br />intermodal Rail Station, Elk Grove, CA —
<br />.Project Engineer
<br />♦ City of Folsom, Johnny Cash Trail - Phase Two,
<br />Folsom, CA -- Project Engineer
<br />
|