Laserfiche WebLink
Kevin Kimm, PEE, <br />STRUCTURAL— TASK MANAGER <br />Kevin has nearly 20 years .of experience in structural engineering and <br />ri ', E : multidisciplinary project management on a variety of public sector projects. His <br />expertise ranges from preparing preliminary project assessment documents and <br />bridge selection reports to bridge/retaining wall construction plans, quantities, estimates and <br />specifications, as well asmanaging post•dealgn/constevotion activities. Kevin.'s bridge design experiortco <br />Includes structures of roinforoed concrete,.preoostlpro-stressed concrete, cast•in•plaoepost•tensionad <br />concrete end structural steel. He also brings experience In the design of pedestrian bridges and other <br />various structuressuch as retatriing wails, sign.and lighting structures, shade pedestrian shelters, <br />drainage structures, end building elements. Over the years, Kevin has worked on merry fast -track projects <br />and has shown his commitment to getting projects done In a timely manner. <br />Professional Credentials <br />Bachelor of Science, Civil Engineering, MontanaState University <br />Registered Professional Englneer.in Arizona,(#043306), California (#75462), and North Carolina (#030483) <br />American Society of Civil Engineers, Member <br />Relevant Experience <br />♦ Santa Rosa. Road Widening Project, Camarillo, <br />CA— Project Engineer <br />♦ A.E. Wright Middle School Pedestrian Bridge, <br />Calabasas, CA — Project Engineer <br />♦ Advanced Transportation Management and <br />Information and Security System (ATMIS), Port <br />of Long Beach, CA — Project Engineer <br />♦ Agoura Road Widening Project (Complete <br />Streets), Agoura Hills, CA —Project Engineer <br />♦ 11th Avenue Improvements (pert of the <br />Downtown BRT Stations project), San Diego, <br />CA — Project Engineer <br />♦ 17315 W, Sunset Blvd. Renovation Project (J. <br />Paul Getty), Pacific Palisades, CA— Project <br />Engineer <br />i lnterchangeImprovements for 1-215atCactus <br />Avenue PSR, Moreno valley, CA Project <br />Engineer <br />.♦ Broadway Plaza Parking Study, Walnut Creek, <br />CA— Project Engineer <br />• Calaveres Sidewalk Improvements, Milpitas, <br />CA -- Project Engineer <br />♦ SANDAG, Broadway CorridorJURT Station <br />Engineering and Environmental Compliance <br />(CEQA), San Diego, CA — Project Engineer <br />Kim ley>))Horn <br />♦ SANDAG, Final Design of the South Line Freight <br />Rait Improvements, San Diego, CA —Project <br />Engineer <br />♦ 1.5/Genesee PR/ED, PS&E and Construction <br />Phase Services (CPS), San Diego, CA m-- <br />Project Engineer <br />• SANDAG/MTS Light Rail Transit (LRT) Renewal <br />Project — Blue Line Stations, San Diego, CA — <br />Project Engineer <br />♦ Groton Casino - Wilfred Avenue Off -Site <br />Improvements, Rohnert Park, CA —Project <br />Engineer <br />♦ 1-215/Van Buren Blvd Interchange PA&ED and <br />PS&E Phases, Riverside County, CA— Project <br />Engineer <br />• City of Rocklin, Farron Street Pedestrian Bridge, <br />Rocklin, CA — Project Manager <br />♦ Lincoln On -Call Services, Lincoln, CA — Project <br />Engineer <br />♦ Los Angeles, Upper 2nd Street Bridge Design, <br />Los Angeles, CA — Project Engineer <br />• City of Elk Grove, Preliminary Engineering for <br />intermodal Rail Station, Elk Grove, CA — <br />.Project Engineer <br />♦ City of Folsom, Johnny Cash Trail - Phase Two, <br />Folsom, CA -- Project Engineer <br />