Laserfiche WebLink
Iser, P.E., LEED AP <br />URAL SERVICES — TASK MANAGER <br />early 15 years of experience one variety of projects, including building <br />nd pavementassessments, parking facility design and repair, vehicular <br />ran bridge design and repair, culvert design, roadway/streetscape <br />ry transportation support structures, Chris' responsibilities have Included <br />uctipn of plans and specifications, and construction phase services for a <br />designand assessment experience encompasses structures of <br />stressed concrete., post -tensioned concrete, and structural steel for a <br />types. Chris also recognizes the correlation between sustairiabllity and <br />ory project: <br />Professional Credentials <br />Master of and Bachelor of Science, Civil Engineering, Clemson University <br />Professional Engineer In CA'(#80317), SC (#280N9 NO (45111), TN (#006276) <br />LEED AP (Leadership In Energy and Environmental Design) <br />American Society of Civil Engineers, Member <br />intemational Parking Institute, Advisoryouncil, Sustainability Committee, Consultants 0ommittee <br />Green Parking Council, Crodentialing committee <br />Relevant Experience <br />♦ Sayside District, 3rd Street Promenade <br />Downtown Parking Study, Santa Monica, CA -- <br />Project Engineer <br />♦ Firestone Boulevard Improvements, Buena <br />Park, CA— Project Manager <br />♦ City of Anaheim, Gone Autry Way improvements <br />(1.5 to State College Blvd.) & State College Blvd. <br />Improvements (West Side), Ansholm, CA <br />♦ Pavement Rehebilltatloa (Task Order Under On - <br />Cell), Pomona, CA -- Project Manager <br />♦ Traffic Flow Improvement Study of Artesia <br />Boulevard from 1-5 to Beach Boulevard, Buena <br />Park, CA -- Project Manager <br />♦ CGold Line Design-Bulld Wayside Energy <br />Storage Substructure (WESS) Project, Los <br />Angeles, CA — Project Engineer <br />♦ Comprehensive Parking Analysis, Santa Ana, <br />CA — Project Engineer <br />♦ California State University -Long Beach, West <br />Campus Turnaround Drainage (Veteran Affairs), <br />Long Beach, CA — Project Manager <br />♦ City of Buena Park, SR 91/0each Blvd WS Exit <br />Ramp, Buena Park, CA — Project Manager <br />♦ Patton Street Pocket Park (Parks for People), <br />Les Angeles, CA— Project Engineer <br />♦ OSU Long Beach, East Campus Road - Safety <br />Improvements, Long Beach, CA — AC/QA <br />Reviewer <br />♦ Diamond Bar Prospectors Road Street <br />Rehabilitation Project, Diamond Bar, CA — <br />Project. Manager <br />♦ East Coast Highway Signal Rehab Design, <br />Newport Beach, CA-- Project Director <br />♦ Valley Transportation Authority PARCS, Silicon <br />Valley, CA-- Project Engineer <br />♦ Santa Fe Christian School Parking Deck, Solana <br />Beach, CA — Project Engineer <br />♦ Berryessa Station Parking Structure, San ,lose, <br />CA — Project Engineer <br />♦ California State University, Sacramento Parking <br />Structure Condition Assessments, Sacramento, <br />CA — Project Engineer <br />♦ Lower Pacific Avenue Parking Study, Santa <br />Cruz, CA — Project Engineer <br />♦ Milpitas Station Pedestrian Bridge over <br />Montague Expressway, MIlpltas, CA— Project <br />Engineer <br />♦ Richmond. Transit Village Parking Garage <br />(BART), Richmond, CA— Project Engineer <br />Kimleyo))Horn <br />