Iser, P.E., LEED AP
<br />URAL SERVICES — TASK MANAGER
<br />early 15 years of experience one variety of projects, including building
<br />nd pavementassessments, parking facility design and repair, vehicular
<br />ran bridge design and repair, culvert design, roadway/streetscape
<br />ry transportation support structures, Chris' responsibilities have Included
<br />uctipn of plans and specifications, and construction phase services for a
<br />designand assessment experience encompasses structures of
<br />stressed concrete., post -tensioned concrete, and structural steel for a
<br />types. Chris also recognizes the correlation between sustairiabllity and
<br />ory project:
<br />Professional Credentials
<br />Master of and Bachelor of Science, Civil Engineering, Clemson University
<br />Professional Engineer In CA'(#80317), SC (#280N9 NO (45111), TN (#006276)
<br />LEED AP (Leadership In Energy and Environmental Design)
<br />American Society of Civil Engineers, Member
<br />intemational Parking Institute, Advisoryouncil, Sustainability Committee, Consultants 0ommittee
<br />Green Parking Council, Crodentialing committee
<br />Relevant Experience
<br />♦ Sayside District, 3rd Street Promenade
<br />Downtown Parking Study, Santa Monica, CA --
<br />Project Engineer
<br />♦ Firestone Boulevard Improvements, Buena
<br />Park, CA— Project Manager
<br />♦ City of Anaheim, Gone Autry Way improvements
<br />(1.5 to State College Blvd.) & State College Blvd.
<br />Improvements (West Side), Ansholm, CA
<br />♦ Pavement Rehebilltatloa (Task Order Under On -
<br />Cell), Pomona, CA -- Project Manager
<br />♦ Traffic Flow Improvement Study of Artesia
<br />Boulevard from 1-5 to Beach Boulevard, Buena
<br />Park, CA -- Project Manager
<br />♦ CGold Line Design-Bulld Wayside Energy
<br />Storage Substructure (WESS) Project, Los
<br />Angeles, CA — Project Engineer
<br />♦ Comprehensive Parking Analysis, Santa Ana,
<br />CA — Project Engineer
<br />♦ California State University -Long Beach, West
<br />Campus Turnaround Drainage (Veteran Affairs),
<br />Long Beach, CA — Project Manager
<br />♦ City of Buena Park, SR 91/0each Blvd WS Exit
<br />Ramp, Buena Park, CA — Project Manager
<br />♦ Patton Street Pocket Park (Parks for People),
<br />Les Angeles, CA— Project Engineer
<br />♦ OSU Long Beach, East Campus Road - Safety
<br />Improvements, Long Beach, CA — AC/QA
<br />Reviewer
<br />♦ Diamond Bar Prospectors Road Street
<br />Rehabilitation Project, Diamond Bar, CA —
<br />Project. Manager
<br />♦ East Coast Highway Signal Rehab Design,
<br />Newport Beach, CA-- Project Director
<br />♦ Valley Transportation Authority PARCS, Silicon
<br />Valley, CA-- Project Engineer
<br />♦ Santa Fe Christian School Parking Deck, Solana
<br />Beach, CA — Project Engineer
<br />♦ Berryessa Station Parking Structure, San ,lose,
<br />CA — Project Engineer
<br />♦ California State University, Sacramento Parking
<br />Structure Condition Assessments, Sacramento,
<br />CA — Project Engineer
<br />♦ Lower Pacific Avenue Parking Study, Santa
<br />Cruz, CA — Project Engineer
<br />♦ Milpitas Station Pedestrian Bridge over
<br />Montague Expressway, MIlpltas, CA— Project
<br />Engineer
<br />♦ Richmond. Transit Village Parking Garage
<br />(BART), Richmond, CA— Project Engineer
<br />Kimleyo))Horn
<br />
|