My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2018 11:11:31 AM
Creation date
7/24/2018 10:46:34 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2018-159-07
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
1/1/1900
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRO POS A L <br />ON-CALL ENGINEERING SERVICES <br />RrP NO.: 17.083 j <br />City of Santa Ana <br />iF" 9 6 <br />Warner Avenue <br />We are providing design services to the City of Santa Ana for the widening and <br />Widening and <br />improvement of Warner Avenue, from Main Street to Oak $treat, Warner Avenue <br />improvements <br />will be widened from Oour•lane undivided arterial to a six-larle.dlvldad arterial to <br />Project <br />conform to the City and County arterials master plan. The six -lane arterial includes <br />a curb separated Class IV bike lane which will serve to connect two Glass I bike <br />Santa Ana, CA <br />1 lane facilities, a first within Orange County, <br />The project also includes landscape Improvements and permanent water quality <br />Improvement features within the parkway areas. A major component of the project <br />Is the Installation of drainage Infrastructure, The existing storm drainage system <br />carries a major watershed system within a 88 -Inch reinforced concrete pipe, Our <br />review of the existing and proposed drainage system resulted in value engineering <br />savings that allowed the system to be downsized from the proposed 18 -foot by <br />84dot reinforced oonorete box to an 88 -Inch reinforced concrete pipe, <br />Year 'Completed; <br />Client Reference: <br />Sean Thomas, City of Santa Ana <br />2015.On-going <br />Phone: 714,647,5665120 Civic Center Plaza M•36, Santa Ana, CA 82702 <br />t1S 1,01 MO'V and <br />Mark Thomas was selected by SBCAG to complete their segment of the project <br />Rehebilltatlort <br />extending from the Cabrillo Boulevard Interchange to the Padaro Lane Interchange, <br />Improvemarits <br />a total of 4.5 miles, Our $300 million segment of the project includes multiple <br />Project <br />challenging design constraints, which include median and outside widening, <br />reconstruction of two Interchanges with existing left -lane exists at Cabrillo <br />Santa Barbara., CA <br />Boulevard and Sheffield Drive, replacement of three bridges over creeks in a <br />FEMA -designated floodplain and floodway, retaining walls along a sea cliff, sound <br />wails, and pavement rehabilitation, These improvements involve modifications to <br />the existing highway profile throughout the corridor, This project requires close, and <br />extensive coordination with Caltrans and SBCAG staff. <br />Client Reference: <br />Year Completed: <br />Fred Luna, Santa Barbara County Association of Governments <br />2017 -On-going <br />Phone; 860,961,8026 1260 North San Antonio Rd, Ste B, Santa Barbara, CA 93110 <br />Rosedale Highway <br />Mark Thomas provided final design services for widening approximately 5.5 miles <br />(SR 58) Widening and <br />of SR 58 (Rosedale Highway) from SR 99 to Allen Road, This conventional highway <br />Rehabilitation <br />is on the National Highway System within City of Bakersfield, County of Kern, and <br />Caltrans District 6 right of way, The project adds one lane in each and a raised <br />Baken5fioid, CA <br />median, improved 12 traffic signals and installed signal interconnection. The design <br />also includes a Class 11 bike lane, sidewalks, crosswalks, and ADA compliant curb <br />ramps meeting new Caltrans Standards. <br />A major component of the project is the rehabilitation of the existing pavement and <br />the new lanes. The pavement in the existing lanes through the entire project was <br />rehabilitated using grind and overlay technique. The pavement for the naw lanes is <br />a thicker section in order to withstand the heavy truck loads. <br />Client Reference: <br />Year Completed: <br />Roans Sandoval, City of Bakersfield <br />2017 <br />Phone: 661,326.343$ 1900 Truxtun Avenue, Suite 200, Bakersfield, CA 93301 <br />
The URL can be used to link to this page
Your browser does not support the video tag.