My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2018 11:11:31 AM
Creation date
7/24/2018 10:46:34 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2018-159-07
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
1/1/1900
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON-CALL ENGINEERING SERVICES <br />RFP NO:: 17-093 <br />City of Santa Ana <br />PROPOSAL <br />REFERENCES <br />At Mark Phomas, we areproud of our track record of successfully completing projects on time, within budget, <br />and meeting the needs of our clients. Below is a list of our references for whom we have delivered projects <br />similar In scope. We are confident you will find that the highlighted projects demonstrate our ability to deliver <br />the services you are seeking on this upcoming project. <br />Patrick Arcinlega, PE <br />City of Newport Beach <br />Public Works Department <br />100 Civic Center Drive <br />Newport Beach, CA 92668 <br />Phone; 949.644.3311 <br />Sean Thomas <br />City of Santa Ana <br />Public Works <br />20 Civic Center Plaza M-36 <br />Santa Ana, CA 92702 <br />Phone: 714.647.6665 <br />Jose Medina <br />City of Fullerton <br />303 W, Commonwealth Ave. <br />Fullerton, CA 92832 <br />Phone; 714.738,6865 <br />Warner Avenue Widening and impro <br />We are providing design services to th+ <br />and improvement of Warner Avenue, ft <br />Warner Avenue will be widened from a <br />lane divided arterial to conform to the ( <br />The six -lane arterial includes a curb as <br />serve to connect two Class I bike lane <br />a six - <br />Infrastructure. Our review of the existing and proposed drainage system <br />resulted in value engineering savings that allowed the system to be <br />downsized from the proposed 18 -foot by 8 -foot reinforced concrete box to <br />an 88 -Inch reinforced concrete pipe, The project also includes landscape <br />and water quality improvement features, <br />; <br />t <br />a <br />
The URL can be used to link to this page
Your browser does not support the video tag.