Laserfiche WebLink
PROPOSAL <br />ON-CALL ENGINErRINQ SERVICES <br />RFP NO,: 17-083 <br />City of Santa Ana <br />It IL <br />ID 7i 'lly M I'll 11 �0 t <br />Lam Le, ILLS OX, .�rlyl surveyor I Qlrootor Of mapping <br />easementsJotlinc <br />establishment and <br />to <br />California State Polyteclunlo University;Pomona <br />of experience ass Project Manager, Prbl6ot SurvaVor and <br />a <br />D using <br />for <br />-- —1-1---l-l-, 1-1111-� 11p u14M411111 <br />of Way,, including 6tufues, manholes, Volvo covert, utli119'va(An Ahd r.nvnrA AlAn nh�ta vin I <br />MIKS, corner access ramps, fire hydrants, parkway drains, etc. Visible Indications Of surfaoe utilities lying <br />Inthe project limits were located, as will accurate IldfrIm e'levatlons for dratnage structures present. Street <br />ns sections were taken at 25 -foot Intervals,the standard cross-sectional data will consist of a back of walk <br />oten, Top of Curb, flow Line, Gutter Lip, and crown for both sides of the street. <br />A Avenue RohabillitatJoh - Torrence, CA - Performed a field topographic survey Of Anza Avenue 0 <br />u 1nth <br />of Torrance, Anza Avenue Is a north -south arterial that serves Torrance and the South Bay region. The <br />iient from 1901h St to Sepulveda Boulevard Is a four -[one roadway with center turn [ones and carries <br />roximattly 20,000 vehicles per day. Performed a field topographic survey of the proposed site to document <br />ting site topography and planImetrios. Substantial visIble Improvements were located within the street right <br />0Y, includingutilftles, manholes, valva covers, utility vaults and covers sign hosts stems Imes -41"t <br />poles, traffic signal poles, cross gutters, local depressions, catch basins, driveway opening$, sidewalks, corn, <br />access ramps, fire hydrants, parkway drains, etc. In addition, the horizontal location of all existing strIpIng, <br />STOP Bars, etc, were also horizontally located, VIsble Indications of surface utilities lying within the project <br />lImIts were located, as will accurate lid/rim elevations for drainage structures present, Cross Section elovatiol <br />were taken at 50 -foot lhtervals,Tho standard cross-sectional data consisted of a back of walk elevation, Top i <br />Curb, Flow Line, Gutter Lip, 114 point and crown for both sides of the street This topographic survey extended <br />to a minimum of 60 feet bLqfyond the project limits and side streets. <br />City of Long Beach, Various Annual $treat Improvements, Long Beach, CA <br />Provided survey services for the Improvements on streets and alleys within the City of Long Beach, Services <br />Include monument preservation, construction staking for curb and gutter, drainage and bus pads, <br />Long Boau;h Airport -Taxiway A, 0, & J (Long Batch, CA) <br />CL Surveying was responsible for providing survey services for the Improvements on Taxiway A and D, <br />Improvements Includes full reconstruction of both Taxiway A & D along with rough grading and drainage, <br />Long Beach Airport-- Runway X-2511 - Long Beach, CA: CL Surveying was responsible for providing <br />construction survey services for the Improvements on Runway 7L -25R, Improvement8 include full <br />reconstruction of Runway 7L -26R along with rough grading and drainage, <br />