My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5 (2)
Clerk
>
Contracts / Agreements
>
N
>
NV5 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 10:51:09 AM
Creation date
7/24/2018 11:03:33 AM
Metadata
Fields
Template:
Contracts
Company Name
NV5
Contract #
A-2018-159-05
Agency
Public Works
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
5/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
addition, the plans will include the sidewalk, and parkway <br />improvements. The bike lane, signing and striping plans <br />will be prepared at a J." _ •Ro' scale, These designs will <br />be supplemented by our field review of the project area <br />to visually confirm and assess the project condition and <br />identify specific Improvements to be included in the <br />project. These plans will then be used to evaluate the cost <br />of the project, and ascertain the Impact on the adjacent <br />Property owners other private improvements, <br />G, MEETINGS/SCHEDULES <br />We will be available to attend tear meetings, City Council <br />meetings and any other meetings with staff, agencies, and <br />the public as required. Utilizing Microsoft Software Project, <br />we will maintain updated project design schedules for use <br />by the City staff, <br />Final Design: Plans. Sper;ificrrfiir ns <br />and Lstinaetes <br />This task involves the completion of construction <br />documents in the form of final PS&E. <br />A, FINAL IMPROVEMENT PLANS <br />Upon City approval of the preliminary design, we will <br />proceed with the preparation of final design plans, <br />specifications and cost estimate for submittal to the City <br />at the preliminary and final completion levels process, All <br />plans, reports, and documents will be submitted in the <br />format acceptable to the City. <br />The plans will be prepared to conform to the general <br />requirements of the City with consideration for the needs <br />of the contractor's construction operations. We will <br />deliver completed and approved construction drawings <br />on or ahead of approved schedules. All designs shall <br />be prepared and submitted In a manner that ensures a <br />complete design approved by the Cityy. Where applicable, <br />the construction drawings will conform to the appropriate <br />applicable standards such as City, county, state standard <br />plans and specifications, APWA Standard Specifications for <br />Public Works Construction "Greenback," and Manual of <br />'Traffic Uniform Control Devices. <br />The following drawings will be prepared for the project and <br />will be part of the plan set; <br />• Title Sheet <br />• Detail Sheet <br />• Street Widening and Rehabilitation Plans & Profiles <br />• Sidewalk and Parkway improvement Plans <br />• Bike Lane, Signing and Striping Plans <br />SHEEF NO. TITLE <br />y TM " , P , <br />tN <br />2 C-2 General Notes, Construction Notes, <br />Legend <br />fir I01 <br />A t` <br />5.6 SP-5 & Bike Lane, Signing, Striping <br />SP-6 & Markings Plans <br />We will prepare complete project spec1katicns, including <br />special provisions that specifies traffic control, construction <br />notification and posting information per City's format end <br />direction. Copies pf the Standard General Provisions and <br />Construction Contract Agreement shal I be supplied by the <br />City to incorporate Into the construction documents. <br />C. QUANTITY AND COST ESTIMATES <br />We will provide complete construction quantity and cost <br />estimates for the project: Estimates will be provided <br />at preliminary and final completion submittals, and a <br />final estimate with the final submittal. Excel files will be <br />submitted with each submittal, quantities will match the <br />Bid Proposal final quantities. <br />Bidding and Construction ervic.t;s <br />We will provide support services during construction, <br />A RR <br />Once the plans are approved and advertised, we will assist <br />City staff with bid/award activities, including responding <br />to bidder questions. We will be available to attend pre -bid <br />meetings and other meetings with staff as required. We <br />will also be available to clarify design•relatod issues at all <br />times, <br />S. CONSTRUCTION SERVICES <br />We will be available to attend pre -construction meetings <br />and other meetings with staff, agencies, and the public <br />as required, We will provide responses to Requests for <br />Information, We will attend any required site meetings and <br />we will incorporate all redline comments prepared by the <br />Contractor and project inspector and provide the as,built <br />plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.