My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5 (2)
Clerk
>
Contracts / Agreements
>
N
>
NV5 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 10:51:09 AM
Creation date
7/24/2018 11:03:33 AM
Metadata
Fields
Template:
Contracts
Company Name
NV5
Contract #
A-2018-159-05
Agency
Public Works
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
5/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTAOTINFO <br />DAVID NIKNAFS, PE <br />dL1v1d.nIknafsQnv5,corn <br />049.589,0477 <br />Project Manager <br />.... ..... f ......... 111.1-1 ... " ............. ............... ......... I ......... .......... <br />EXPERIENCE <br />. ..... <br />Mr. Nlknefs has More than SO Years of civil englneerIngexperlence in the public <br />30 years <br />and private sectors working on various capital improvement projects and has <br />EDUCATION <br />extensive experience working as a project manager and senior engineer. He has <br />M.S. Civil Engineering <br />managed numerous Public works and development projects Including roadways, <br />Civil Engineering <br />bridges, drainage, sewer, water, underground utilities, building facilities and related <br />Infrastructure <br />LICENSES <br />Civil Engineer (CA) <br />He is In charge of providing overall project direction io the project technical team <br />and providing resource allocation; Preparing and administering budgets; <br />No. 4269i <br />preparing <br />and moriftorIng,projeot schedules; managing production of Preliminary design <br />AFFILIATIONS <br />and final design; preparing various datmqed technical reports; providing oveelght <br />American Public Works <br />and performing quolfty control; mnenegingand monitoring construction activitfas; <br />Association (APWA) <br />establishing, coordinating end maintaining working relationships with owners, <br />Arnsirican society of civil <br />developers, and other agencies. <br />Engineers (ASCE) <br />Project Fxperience <br />Transportation & <br />...... . ........ ;— ... ......... <br />Development institute <br />Street Widening Project <br />CITY OF SAN BERNARDINO I SAN BERNARDINO, CA <br />Project Manager. Mr. Nlknefs Is responsible for providing professional design <br />engineering services 11`1010.019 Plains, specifications, cost estimates and related bid <br />documents for the widening of "H"$trPet from Kendall Drive to 46th Street. The <br />Project will increase H Street from two lanes to four lanes and upgrade the existing <br />traffic signals at 40th Street and Kendall Drive. The plans will Include roadway, <br />drainage, sewer, signing and striping, street lighting, modification to traffic signals, and <br />demolition plans. We are coordinating Withutillty companies, identifying existing right- <br />of-way, conducting pavement investigation and preparing a report; and preparing all <br />required environmental studies and documents for clearance under CEQA. The street <br />Improvements Will Include ADAwcompllarit curb ramps, <br />Pacific Coast Highway. Arterial Improvements <br />CITY OF REDONDO QEACI-I I REDONDO BEACH, CA <br />Project Manager. Mr, NI1knafs Is managing a 00mPrOhensive traffic analysis and <br />the preparation of Preliminary design recommendations to reduce congestion <br />and Increase safety an Pacific Coast Highway. Our team is preparing final plans, <br />sPecifications and cost estimates for the intersection widening for a right -turn -only lane <br />on southbound Pacific, Coast Highway and Torrance Boulevard, We will also provide <br />design and support services during bidding and construction phases, <br />Jamboree Road and Intersection Widening <br />CITY OF IRVINE I IRV)NE, CA <br />PF000 Manager/Contract Manager. Mr. Nikriefs is responsible for providing program <br />and contract management services for the widening of Jamboree Road from Main <br />Street to Befrance Parkway, The project will wider) Jamboree Road from four to five <br />V <br />5 <br />through ]ones in each direction. Intersection Improvements at Jamboree/Main and <br />Jambores/ftTanoa are currently In the design and right of way phases and will be <br />constructed along with the widening. Mr. Nlknafs is also responsible for coordination and <br />monitoring required for all phases of work, <br />
The URL can be used to link to this page
Your browser does not support the video tag.