Laserfiche WebLink
CONTACTINFO <br />KYLE HILTQNV EIT <br />kYie.h€Iton@nv5.eom <br />949.685,0477 <br />r <br />Project Engineer <br />EXPE,RIENCS <br />................ .,,,,. ....................... <br />Mr. Hilton has more than six years of experience in public works Improvements, <br />gYears <br />Including <br />planning and design of streets, arterial streets, right-of-way engineering, and <br />EDUCATION <br />storm drain <br />design. His professional experience also includes CAD drafting, bridge <br />B.S. Civil.& Environmental <br />rating, Water Quality Management Plans (WQMP), Environmental Impact Reports (EIR), <br />Engineering <br />and Storm Water Pollution Prevention Plans (SWPPP), He also has also served various <br />LICENSES/CERTIFICATES <br />roles for staff augmentation assignments. <br />.Civil Engineer-In4raining <br />Project Experience <br />............ ..................:..............:.........:::...:...:.....:................. .......... ,.,....,....,.,......... ..... ,.,....................................... . <br />Ranchp Palos Verdes Area 9. Now utripini and Signing <br />cn'Y OF RANCHO PALOS VCRDES I RANCHO PALOS VERDES, CA <br />D06191) Engineer. Mr. Hilton was responsible for striplhg erld signing plans for a large <br />nelghborhood community. The project consisted of addi ng now signs and striping on <br />the streets of a neighborhood community. <br />Bristol Street Widening from 3rd Street to Civic Center <br />CITY OF SANTA ANA I SANTAANA, CA <br />peslgn Engineer. Mr. killtolt was responsible for the design 0f thestreet Widening <br />plans, landscape plans and irrigation plans for this project, The project consisted of <br />adding an additional lane in. each direction, Also; a median was.00nateucted with a <br />decomposed granite walkway and a dry stream bed was constructed in place of a <br />gutter, <br />Grand street Widening from 1st to 4th Street <br />CITY OF SANTA ANA I SANTA ANA, CA <br />Design Engineer, Mr. Hilton was responsible for the design of the street widening <br />Plans, landscape plans and irrigation plans for thl6 project. The proJeotconsisted of <br />adding an additlortal lane in each direction. Also, a median was constructed with a dry <br />stream bed in the middle to allow for runoff to percolate into the soil <br />Memorial Park Walkway, Basketball Courts, and Volleyball Courts <br />Renovation <br />CITY OF SANTA ANA I SANTA ANA, CA <br />Design Engineer. Mr, Hilton was responsible for the design of the vralkway, basketball <br />courts, and volleyball courts reconstruction plans for this project, <br />Expo Line Bus Stop Enhancement Project <br />CITY OF SANTA MONICA I SANTA MONICA, CA <br />Design Engineer. Our team was selected to provide engineering design services and <br />Mr. Hilton Is responsible for providing the final design of the bus stops while satisfying <br />the needs of multiple government agencies. Phase 11 of the Expo Line is expected to <br />be completed In late 2015 and will extend the line to Santa Monica, As a result, Big <br />Blue Bus is Implementing a comprehensive redesign of Its transit system to 0011nect <br />passengers with the Expo Line stations in attempt to create a more efficient commute <br />for passengers; these initiatives also Include the Inclusion of signage, bus berths <br />and overall pedestrian Improvements. Specifically, ourteam is providing preliminary, <br />schematic and final design, to Include construction documents cletailing bus pads, <br />ADA-compliant wheelchair pads, sidewalk extensions and the location of bus stop <br />