My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5 (2)
Clerk
>
Contracts / Agreements
>
N
>
NV5 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 10:51:09 AM
Creation date
7/24/2018 11:03:33 AM
Metadata
Fields
Template:
Contracts
Company Name
NV5
Contract #
A-2018-159-05
Agency
Public Works
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
5/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CQNTACTINF`O <br />STEVESCHAPEL <br />� &tavg.5ohapa10nY5,aom <br />,494,15.0477 <br />project Engineer <br />5 <br />.......,.......... ..,................. ... , ,.. <br />Mrwohapof-has more then 2 years of civil englneeringaXperienoe In Southern <br />California. <br />years <br />He Is an experienced manager who has been responsible for the aucoassful <br />tDOCAT10N <br />completion of environmentally and politically sensitive design Improvement projects, His <br />Crlgineerldgcourses <br />l <br />experience Includes serving as the project manager and project engineer responsible for <br />preparing project studies and reoommendatlon$, plans and specifications, <br />arid support <br />during construction, <br />Project Experience <br />...... ..,..... <br />.............................., <br />Baker Street Rehabilitation I City of Costa Mesa <br />Mr, Sptiapel Was responsible for preparation of plans; specifications and estimates for <br />the BakarStreet Rehabilitation from C3adds$trer t to aesr$treet. The pro)ecteonaieted <br />Of approximately 1400 4Fpf pavement rehabilitation, reconstruction of damaged curb <br />end gutter, afdewaik, and driveway, construction ofADA compliant out ramps, and elf <br />j ! <br />appurtenant Work.. <br />Central Avenue Street RecdriStrtletlon I City of Chproo <br />Mr. Schopel was responsible for preparation of plant, spooiflcations and estimates <br />ifor <br />1800 LF of pavement reconstruction. Improvements included total pavement <br />reconstruction, redesign of pkisting cross sections es needed to improve drainage and <br />I <br />drlvesbility, and repair of damaged sections of the asphalt: <br />Ailey Pavement Rehabilitation Projects I City of Costa Mesa <br />Mr. Schapal was responsible for overseeing the preparation of plans, specifcations <br />and estimates for the total reconstruction or pavement rehabilitation of 11 alleys. Work <br />Included soil testing; structural section design; field surveying, 1, piaeamont of alley <br />entrance, damaged curb and gutters, press gutters and spandrels, sidewalks, driveway <br />and approaches, turf and Irrigation; wheel chair ramp (WCR) designs meeting ADA <br />requirements; planting and trimming trees; determining right-of-way; and providing <br />traffio control and striping plans. <br />Urnescai Canyon Road Rehabilitation I County of Riverside <br />Mr. $chapel was responsible for preparation of plans, specifications and estimates <br />for 2,000 bF of pavement rehabilitation. Improvements Included grind and asphalt <br />overlay, redesign of e%latimg cross saotions as needed to Improve drainage and <br />driveakaility, repair of damaged sections of the asphalt, and reconstruction of concrete <br />improvements (sl,dewalk, curb and gutter), <br />Industrial Way Water Quality and Storm Drain Improvements I City of <br />Costa Mesa <br />Mr. $chapel was responsible for the preparation of plans; specifications, and estimates <br />for the design ofthe Industrial Way Water Quality and Storm Drain Improvements with <br />the cbJective to eliminate the flooding and current water quality problems caused <br />by the deflolencios within the existing stone drain system. The project consists of <br />N V 5 installing On underground detention/infiltration facility within an open grass field <br />located south of the Anaheim Avenue and 19th Street Intersection, The project <br />Included a hydraulic analysis of the entire storm drain system, <br />
The URL can be used to link to this page
Your browser does not support the video tag.